← Back
Two family converted from one family
150-56 8 AVENUE
QUEENS · BIN 4102587
💬 Discuss this project
1960Year Built
2Stories
B3Building Class
R2AZoning
4,009 sfGross Floor Area
2Units
Two family converted from one family · 5,000 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 1Under Construction6p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT206/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MATEMPA CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331107/16/2025
Building Lifecycle
All (3)Filed (2)Permit Issued (1)
06/30/2026
Filed — Alteration CO
AS PER BB 2025-006, PROPOSING AN ADU NOT IN A CELLAR, BASEMENT, OR DET GARAGE. ADU IS PROPOSED AT 1ST FLOOR AND PERMITTED AS PER BB 2025-006.
Q01250312-S1
05/28/2026
Permit issued — General Construction
Q01250312-I1-GC
07/16/2025
Filed — Alteration CO
AS PER BB 2025-006, PROPOSING AN ADU NOT IN A CELLAR, BASEMENT, OR DET GARAGE. ADU IS PROPOSED AT 1ST FLOOR AND PERMITTED AS PER BB 2025-006.
Q01250312-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMATEMPA CORP05/28/2026
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026CompleteNY FOREVER ELECTRIC LLC3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/20/2026Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/29/2026Energy Code Compliance Inspections—progress
06/25/2026Permanent certificate—energy_progress
06/25/2026HVAC-R and service water piping design and insulation—energy_progress
06/25/2026HVAC-R and service water heating equipment—energy_progress
06/25/2026HVAC-R and service water heating system controls—energy_progress
06/25/2026Maintenance information—energy_progress
05/28/2026Fire-Resistant Penetrations and Joints—special
07/14/2025Fire-Resistant Penetrations and JointsGINO LONGOspecial
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01250312-S1Request digital key ↗
08/19/2026Q01250312-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01250312-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01250312-S1Open ↗
08/19/2026Q01250312-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01250312-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01250312-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/19/2026Q01250312-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01250312-I1Open ↗