← Back
Factory, light manufacturing
150-50 11 AVENUE
QUEENS · BIN 4102660
💬 Discuss this project
1949Year Built
1Stories
F5Building Class
R3-2Zoning
—Gross Floor Area
1Units
Factory, light manufacturing · 0.27 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 4 docs
Floor 11p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MILTIADIS LEPTOURGOS, PE111/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILTIADIS LEPTOURGOS, PE508111/05/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (6)
12/05/2025
Signed off — Alteration
PROPOSE TO INSTALL METAL ROOF OVER EXISTING DRIVEWAY/ENTRANCE TO EXISTING METAL FABRICATION BUILDING, ALL AS PER ATTACHED PLANS. OBTAIN ST PERMIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY (REF JOB # 4848)
Q01313124-I1
11/13/2025
Permit issued — Structural
Q01313124-I1-ST
11/05/2025
Filed — Alteration
PROPOSE TO INSTALL METAL ROOF OVER EXISTING DRIVEWAY/ENTRANCE TO EXISTING METAL FABRICATION BUILDING, ALL AS PER ATTACHED PLANS. OBTAIN ST PERMIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY (REF JOB # 4848)
Q01313124-I1
11/04/2025
Special inspection requirement — Structural Cold-Formed Steel
Miltiadis Leptourgos
11/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Miltiadis Leptourgos
11/04/2025
Special inspection requirement — Structural Steel - Details
Miltiadis Leptourgos
11/04/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Miltiadis Leptourgos
11/04/2025
Special inspection requirement — Structural Steel - Welding
Miltiadis Leptourgos
11/03/2025
Special inspection requirement — Final
Miltiadis Leptourgos
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offLAWRENCE EXTERIOR RESTORA11/13/2025
BISOTISSUEDIRON WORKS BY YSL INC.02/25/1998
BISOTISSUEDIRON WORKS BY YSL INC.10/20/1997
1 project · most recent 02/17/2026
General Wiring
FiledStatusContractorScope
02/17/2026CompleteL&B ELEC'L INTERNATIONALGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/04/2025Structural Cold-Formed SteelMiltiadis Leptourgosspecial
11/04/2025Structural Stability – Alterations of existing buildingsMiltiadis Leptourgosspecial
11/04/2025Structural Steel - DetailsMiltiadis Leptourgosspecial
11/04/2025Structural Steel - High Strength BoltingMiltiadis Leptourgosspecial
11/04/2025Structural Steel - WeldingMiltiadis Leptourgosspecial
11/03/2025FinalMiltiadis Leptourgosprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01313124-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026Q01313124-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q01313124-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01313124-I1Open ↗
▸Inspections & Test Reports2
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
12/03/2025400774569Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
12/03/2025400774569Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/04/2025400774569Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/03/2025400774569Open ↗
▸Other Documents1
▸BIS* FIRE STOPS 27-3451
12/03/2025400774569Open ↗