← Back
Two family frame
154-47 20 ROAD
QUEENS · BIN 4107480
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R3AZoning
2,400 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 3 docs
Floor 21p · 1 filing · 15 docs
Floor 12p · 2 filings · 20 docs
Cellar10p · 3 filings · 20 docs
Basement1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINTO ENGINEERING CONSULTANT, DPC902/17/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JESSIE BONAPARTE103/21/2026
PINTO STUDIO1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
APOLLO PLBG & HTG INCPlumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
TOMMY INTERIOR CONTRACTINGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110605/28/2024
PINTO STUDIO INC6366210/30/2023
Building Lifecycle
All (66)Filed (9)Permit Issued (3)Signed Off (3)Violation (1)Inspection (12)Objection (9)Special Inspection (29)
04/14/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/28/2026
Objection raised — Scope
02/17/2026
Filed — Alteration CO
Q01336420-I1
02/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/12/2026
Special inspection requirement — Energy Code Compliance Inspections
02/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/12/2026
Special inspection requirement — Air barrier - visual inspection
02/12/2026
Special inspection requirement — Fenestration areas
02/12/2026
Special inspection requirement — Interior lighting power
02/12/2026
Special inspection requirement — Insulation placement and R values
02/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/12/2026
Special inspection requirement — Fenestration air leakage
06/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/18/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/27/2024
Signed off — Alteration
Limited plumbing work filed to resolve ECB Violation # 039113283N, and 039113282L, as per plans.
Q01055677-I1
07/10/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/03/2024
Permit issued — Plumbing
Q01055677-I1-PL
06/05/2024
Objection raised — Zoning
06/05/2024
Objection resolved — Addressed
06/05/2024
Objection raised — Other
06/05/2024
Objection resolved — Addressed
05/28/2024
Filed — Alteration
Limited plumbing work filed to resolve ECB Violation # 039113283N, and 039113282L, as per plans.
Q01055677-I1
05/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
Rene Navarrete
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2024
Signed off — Alteration
Plumbing work on exist. two family house; Renovation of cellar and 2nd Floor: bathrooms, kitchen, laundry and boiler room.
Q00848270-I1
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
01/29/2024
Objection resolved — Addressed
01/26/2024
Objection raised — Scope
01/10/2024
Filed — Alteration
Plumbing work on exist. two family house; Renovation of cellar and 2nd Floor: bathrooms, kitchen, laundry and boiler room.
Q00848270-P3
01/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
01/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/02/2024
Signed off — Alteration
Selective interior removals and interior renovation of cellar, and second floor, including bathrooms, kitchen, laundry and boiler room, as per plans. No change of use, occupancy or egress.
Q00848114-I1
12/29/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/08/2023
Objection raised — Other
12/08/2023
Objection resolved — Addressed
12/07/2023
Filed — Alteration
Selective interior removals and interior renovation of cellar, and second floor, including bathrooms, kitchen, laundry and boiler room, as per plans. No change of use, occupancy or egress.
Q00848114-P2
12/06/2023
Special inspection requirement — Air barrier - visual inspection
Rene Navarrete
12/06/2023
Special inspection requirement — Lighting in dwelling units
Rene Navarrete
12/06/2023
Special inspection requirement — Duct leakage testing, insulation and design
Rene Navarrete
12/06/2023
Special inspection requirement — Lighting controls
Rene Navarrete
12/06/2023
Special inspection requirement — Interior lighting power
Rene Navarrete
12/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Rene Navarrete
12/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
12/04/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/30/2023
Filed — Alteration
Plumbing work on exist. two family house; Renovation of cellar and 2nd Floor: bathrooms, kitchen, laundry and boiler room.
Q00848270-P2
11/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
11/17/2023
Permit issued — General Construction
Q00848114-I1-GC
10/30/2023
Filed — Alteration
Plumbing work on exist. two family house; Renovation of cellar and 2nd Floor: bathrooms, kitchen, laundry and boiler room.
Q00848270-P1
10/30/2023
Filed — Alteration
Selective interior removals and interior renovation of cellar, and second floor, including bathrooms, kitchen, laundry and boiler room, as per plans. No change of use, occupancy or egress.
Q00848114-P1
10/11/2023
Special inspection requirement — Lighting in dwelling units
RENE NAVARRETE
10/11/2023
Special inspection requirement — Duct leakage testing, insulation and design
RENE NAVARRETE
10/11/2023
Special inspection requirement — Lighting controls
RENE NAVARRETE
10/11/2023
Special inspection requirement — Air barrier - visual inspection
RENE NAVARRETE
10/11/2023
Special inspection requirement — Interior lighting power
RENE NAVARRETE
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
10/11/2023
Special inspection requirement — Energy Code Compliance Inspections
RENE NAVARRETE
07/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RENE NAVARRETE
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC07/03/2024
DOB NOWGeneral ConstructionSigned-offTOMMY INTERIOR CONTRACTIN11/17/2023
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC05/11/2023
3 projects · most recent 07/25/2024
General Wiring
FiledStatusContractorScope
07/25/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
05/29/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
05/26/2023Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
06/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/29/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/04/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/14/2026Electric vehicle service equipment requirements—energy_progress
02/12/2026Tenant Protection Plan Compliance—special
02/12/2026Energy Code Compliance Inspections—progress
02/12/2026Fenestration and door U-factor and product ratings—energy_progress
02/12/2026Air barrier - visual inspection—energy_progress
02/12/2026Fenestration areas—energy_progress
02/12/2026Interior lighting power—energy_progress
02/12/2026Insulation placement and R values—energy_progress
02/12/2026Fire-Resistant Penetrations and Joints—special
02/12/2026Fenestration air leakage—energy_progress
05/22/2024Tenant Protection Plan ComplianceRene Navarretespecial
02/06/2024Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
01/10/2024Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
12/06/2023Air barrier - visual inspectionRene Navarreteenergy_progress
12/06/2023Lighting in dwelling unitsRene Navarreteenergy_progress
12/06/2023Duct leakage testing, insulation and designRene Navarreteenergy_progress
12/06/2023Lighting controlsRene Navarreteenergy_progress
12/06/2023Interior lighting powerRene Navarreteenergy_progress
12/06/2023Energy Code Compliance InspectionsRene Navarreteprogress
12/06/2023Fire-Resistant Penetrations and JointsRene Navarretespecial
11/29/2023Fire-Resistant Penetrations and JointsRENE NAVARRETEspecial
10/11/2023Lighting in dwelling unitsRENE NAVARRETEenergy_progress
10/11/2023Duct leakage testing, insulation and designRENE NAVARRETEenergy_progress
10/11/2023Lighting controlsRENE NAVARRETEenergy_progress
10/11/2023Air barrier - visual inspectionRENE NAVARRETEenergy_progress
Latest 25 of 29.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00848114-P1Request digital key ↗
08/23/2026Q00848114-P2Request digital key ↗
08/23/2026Q00848114-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 16
08/23/2026Q00848114-P1Open ↗
08/23/2026Q00848114-I1Open ↗
08/13/2026Q00848114-P2Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q00848114-P1Open ↗
08/23/2026Q00848114-I1Open ↗
08/17/2026Q01336420-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00848114-P2Open ↗
09/01/2026Q00848270-I1Open ↗
09/01/2026Q01055677-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00848114-P2Open ↗
09/01/2026Q00848114-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00848114-P1Open ↗
08/23/2026Q00848114-I1Open ↗
08/15/2026Q01336420-I1Open ↗
Showing 3 of 6 on file for this type