← Back
Two family converted from one family
149-40 ROOSEVELT AVENUE
QUEENS · BIN 4114037
💬 Discuss this project
1901Year Built
2.5Stories
B3Building Class
R5Zoning
1,796 sfGross Floor Area
2Units
6 Open Violations 5 unresolved · 1 paperwork only ▸
Two family converted from one family · 4,000 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RODRIGUEZ303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C307/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429207/28/2025
Building Lifecycle
All (31)Filed (3)Violation (8)Objection (2)Special Inspection (18)
01/12/2026
Violation issued (ECB, open)
Construction
08/13/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Scope
07/28/2025
Filed — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE. REBUILD EXTERIOR WALL, FRONT COVERED PORCH, NEW DRYWALL OVER EXISTING FRAMING, DOORS, FLOORING, CABINETRY,TRIM AND FINISHES THROUGHOUT. FILING TO RESOLVE ECB VIOLATION #39135703H AND LIFT VACATE ORDER
Q01231127-S1
07/22/2025
Filed — Alteration
INTERIOR RENOVATION TO REPAIR FIRE DAMAGE. REBUILD EXTERIOR WALL, FRONT COVERED PORCH, NEW DRYWALL OVER EXISTING FRAMING, DOORS, FLOORING, CABINETRY,TRIM AND FINISHES THROUGHOUT. FILING TO RESOLVE ECB VIOLATION #39135703H AND LIFT VACATE ORDER
Q01231127-I1
05/30/2025
Filed — Alteration
Q01233382-I1
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
05/23/2025
Special inspection requirement — Mechanical Systems
Jeffrey Stones
05/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
05/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
05/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
05/23/2025
Special inspection requirement — Structural Wood Frame
Jeffrey Stones
05/23/2025
Special inspection requirement — Final
Jeffrey Stones
05/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
05/23/2025
Special inspection requirement — Air barrier - visual inspection
Jeffrey Stones
05/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
05/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Stones
05/23/2025
Special inspection requirement — Fenestration air leakage
Jeffrey Stones
05/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
05/23/2025
Special inspection requirement — Insulation placement and R values
Jeffrey Stones
05/23/2025
Special inspection requirement — Interior lighting power
Jeffrey Stones
05/23/2025
Special inspection requirement — Fenestration areas
Jeffrey Stones
05/23/2025
Special inspection requirement — Permanent certificate
Jeffrey Stones
05/23/2025
Special inspection requirement — Maintenance information
Jeffrey Stones
01/16/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/16/2025
Violation issued (ECB, open)
Construction
12/27/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/29/2024
Violation issued (DOB, closed)
V%-DOB VIOLATION
10/28/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
1 project · most recent 07/28/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ 48,000 BTU · Condensing Unit ×2
MXZ-4C36NA3 36,000 BTU · Condensing Unit ×1
1 project · most recent 07/28/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/28/2025——Gas, Water/Sanitary
1 project · most recent 10/07/2025
FiledStatusContractorScope
10/07/2025CompleteYORK ELEC'L CONTR'S INC.—
1 project · most recent 07/28/2025
FiledStatusContractorScope
07/28/2025——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/23/2025Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
05/23/2025Mechanical SystemsJeffrey Stonesspecial
05/23/2025Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
05/23/2025Energy Code Compliance InspectionsJeffrey Stonesprogress
05/23/2025Fire-Resistance Rated ConstructionJeffrey Stonesprogress
05/23/2025Structural Wood FrameJeffrey Stonesprogress
05/23/2025FinalJeffrey Stonesprogress
05/23/2025HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
05/23/2025Air barrier - visual inspectionJeffrey Stonesenergy_progress
05/23/2025HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
05/23/2025Fenestration and door U-factor and product ratingsJeffrey Stonesenergy_progress
05/23/2025Fenestration air leakageJeffrey Stonesenergy_progress
05/23/2025HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
05/23/2025Insulation placement and R valuesJeffrey Stonesenergy_progress
05/23/2025Interior lighting powerJeffrey Stonesenergy_progress
05/23/2025Fenestration areasJeffrey Stonesenergy_progress
05/23/2025Permanent certificateJeffrey Stonesenergy_progress
05/23/2025Maintenance informationJeffrey Stonesenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01233382-I1Request digital key ↗
08/19/2026Q01231127-I1Request digital key ↗
08/15/2026Q01231127-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01233382-I1Open ↗
08/13/2026Q01231127-I1Open ↗
08/13/2026Q01231127-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01231127-I1Open ↗
08/26/2026Q01231127-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01231127-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01231127-I1Open ↗
08/13/2026Q01231127-S1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01231127-I1Open ↗