← Back
Gas station with retail store
49-04 COLLEGE POINT BLVD
QUEENS · BIN 4115042
💬 Discuss this project
1931Year Built
1Stories
G3Building Class
C2-6AZoning
1,421 sfGross Floor Area
1Units
Gas station with retail store · Owner of record: BP PRODUCTS NORTH AMERICA INC · 9,898 sf lot · 0.14 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BP PRODUCTS NORTH AMERICA INC1707/08/2026
HIGH POINT ENGINEERING303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIGH POINT ENGINEERING209/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH POINT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALVIN PETROLEUM SYSTEMS IGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIGH POINT ENGINEERING1151109/14/2023
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (2)Objection (2)Special Inspection (4)
12/27/2023
Signed off — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-I1
12/27/2023
Signed off — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-S1
10/17/2023
Permit issued — General Construction
Q00817268-S1-GC-CX
10/17/2023
Permit issued — General Construction
Q00817268-I1-GC
10/02/2023
Objection resolved — Addressed
09/29/2023
Objection raised — Admin
09/14/2023
Filed — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-S1
09/13/2023
Special inspection requirement — Structural Steel - Details
Christopher Tartaglia
09/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Tartaglia
09/13/2023
Special inspection requirement — Final
Christopher Tartaglia
03/22/2023
Filed — Alteration
Removal of concrete pavement at each column to facilitate addition of steel around existing columns. Replacement of concrete pavement. No change to use, egress or occupancy.
Q00817268-I1
01/23/2023
Special inspection requirement — Final
Christopher Tartaglia
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offALVIN PETROLEUM SYSTEMS I10/17/2023
DOB NOWGeneral ConstructionSigned-offALVIN PETROLEUM SYSTEMS I10/17/2023
BISFSISSUEDJACK PICCINI, INC03/04/2019
BISFSISSUEDJACK PICCINI, INC10/13/2017
BISEQISSUEDALVIN PETROLEUM SYSTEMS I09/22/2017
BISOTISSUEDALVIN PETROLEUM SYSTEMS I09/22/2017
BISOTISSUEDWOODSIDE ASSOCIATES INC02/12/2016
BISFPISSUEDACTION FIRE SVC COMP INC02/05/2016
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.10/22/2004
BIS—ISSUEDPARKER SERVICE INDUSTRIES06/13/2002
BISOTISSUEDPARKER SERVICE INDUSTRIES06/13/2002
BIS—ISSUEDPARKER SERVICE INDUSTRIES05/23/2002
BIS—ISSUEDPARKER SERVICE INDUSTRIES05/23/2002
BISOTISSUEDVIC CONSTRUCTION CORP07/23/1992
BISFPISSUEDVIC CONTRUCTION CORP05/14/1992
BISOTISSUEDVIC CONTRACTOR CORP05/14/1992
BIS—ISSUEDVIC CONSTRUCTION CORP05/12/1992
2 projects · most recent 02/27/2024
General Wiring
FiledStatusContractorScope
02/27/2024CompleteHUNTER ELECTRIC, INC.General Wiring
06/18/2018CompleteROBERT S. COVELLO—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/13/2023Structural Steel - DetailsChristopher Tartagliaspecial
09/13/2023Structural Stability – Alterations of existing buildingsChristopher Tartagliaspecial
09/13/2023FinalChristopher Tartagliaprogress
01/23/2023FinalChristopher Tartagliaprogress
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q00817268-I1Request digital key ↗
08/25/2026Q00817268-S1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
10/03/2017421520697Open ↗
10/03/2017421520697Open ↗
02/22/2016421237441Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/29/2017421520697Open ↗
11/23/2015421237441Open ↗
11/23/2015421237450Open ↗
▸Seals & Professional Certifications13
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/10/2019421520697Open ↗
10/03/2017421520697Open ↗
06/29/2017421520697Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026Q00817268-I1Open ↗
08/25/2026Q00817268-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00817268-S1Open ↗
08/23/2026Q00817268-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00817268-S1Open ↗
08/28/2026Q00817268-S1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/29/2017421520697Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
11/29/2016421237450Open ↗
▸Environmental & Asbestos7
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
09/20/2017421520697Open ↗
12/08/2015421237441Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00817268-I1Open ↗
08/13/2026Q00817268-S1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026Q00817268-I1Open ↗
08/13/2026Q00817268-S1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/23/2015421237441Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
04/10/2019421520697Open ↗
10/03/2017421520697Open ↗
06/29/2017421520697Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/10/2019421520697Open ↗
10/18/2016421237441Open ↗
10/07/2016421237450Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/22/2019421520697Open ↗
04/02/2019421520697Open ↗
10/19/2016421237441Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/22/2019421520697Open ↗
12/15/2016421237441Open ↗
11/29/2016421237450Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
04/10/2019421520697Open ↗
06/29/2017421520697Open ↗
10/18/2016421237441Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
06/29/2017421520697Open ↗
11/23/2015421237441Open ↗
11/23/2015421237450Open ↗
▸BISADDITIONAL INFORMATION1
08/08/2017421520697Open ↗