← Back
Three families
132-30 MAPLE AVENUE
QUEENS · BIN 4115109
💬 Discuss this project
1980Year Built
3Stories
C0Building Class
R6Zoning
3,170 sfGross Floor Area
3Units
Rent Stabilized11 Open Violations ▸
Three families · Owner of record: AMERICAN FUJIAN SHOU ZHAN ASSOCIATION IN C. · 2,525 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalFire Protection
Floor 23p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
1 job · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
Building Lifecycle
All (62)Filed (7)Violation (25)Special Inspection (30)
07/24/2026
Violation issued (ECB, open)
Construction
07/24/2026
Violation issued (ECB, open)
Construction
06/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/18/2026
Filed — Alteration CO
Q01341108-S7
05/18/2026
Filed — Alteration CO
Q01341108-S6
05/18/2026
Filed — Alteration CO
Q01341108-S4
05/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/12/2026
Special inspection requirement — Structural Steel - Welding
05/12/2026
Special inspection requirement — Concrete - Cast-In-Place
05/12/2026
Special inspection requirement — Structural Steel - Details
05/12/2026
Special inspection requirement — Subgrade Inspections
05/12/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
05/12/2026
Special inspection requirement — Masonry
05/12/2026
Special inspection requirement — Post-installed Anchors
05/12/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/08/2026
Filed — Alteration CO
Q01341108-S1
05/07/2026
Violation issued (HPD, open)
A
04/27/2026
Special inspection requirement — Final
04/27/2026
Special inspection requirement — Footing and Foundation
04/27/2026
Special inspection requirement — Final
03/25/2026
Filed — Alteration CO
Q01341108-S2
03/12/2026
Filed — Alteration CO
Q01341108-S3
01/07/2026
Filed — Alteration CO
Q01341108-I1
01/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/03/2026
Special inspection requirement — Concrete - Cast-In-Place
01/03/2026
Special inspection requirement — Energy Code Compliance Inspections
01/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
01/03/2026
Special inspection requirement — Air barrier - visual inspection
01/03/2026
Special inspection requirement — Interior lighting power
01/03/2026
Special inspection requirement — Lighting controls
01/03/2026
Special inspection requirement — Fenestration areas
01/03/2026
Special inspection requirement — Fenestration air leakage
01/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/30/2025
Special inspection requirement — Mechanical Systems
12/30/2025
Special inspection requirement — Energy Code Compliance Inspections
12/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/21/2025
Violation issued (HPD, open)
I
11/13/2025
Violation issued (ECB, open)
Construction
11/13/2025
Violation issued (ECB, open)
Construction
11/13/2025
Violation issued (ECB, open)
Construction
11/13/2025
Violation issued (ECB, open)
Construction
11/13/2025
Violation issued (ECB, open)
Construction
06/12/2025
Violation issued (HPD, open)
A
04/16/2024
Violation issued (HPD, closed)
A
11/24/2023
Violation issued (HPD, closed)
I
03/30/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
A
10/25/2018
Violation issued (HPD, closed)
I
11/23/2016
Violation issued (HPD, closed)
I
08/17/2016
Violation issued (HPD, open)
C
05/07/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/07/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2014
Violation issued (ECB, closed)
Construction
Latest 60 of 62 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/17/2024$2.0M—Private party → AMERICAN FUJIAN SHOU ZHAN ASSOCIATION INC.$631/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC CONSULTING ENGINEERS805/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXT STEP BUILDING SOLUTIONS203/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDRRP PLUMBING CORP10/06/2014
BISOTISSUEDCTI CONSTRUCTION INC03/12/2014
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/04/2026Subsurface Investigations (Borings/Test Pits)—special
05/12/2026Structural Steel - High Strength Bolting—special
05/12/2026Structural Steel - Welding—special
05/12/2026Concrete - Cast-In-Place—special
05/12/2026Structural Steel - Details—special
05/12/2026Subgrade Inspections—special
05/12/2026Subsurface Conditions – Fill Placement & In-Place Density—special
05/12/2026Masonry—special
05/12/2026Post-installed Anchors—special
05/12/2026Excavations - Sheeting, Shoring, and Bracing—special
04/27/2026Final—progress
04/27/2026Footing and Foundation—progress
04/27/2026Final—progress
01/07/2026Structural Stability – Alterations of existing buildings—special
01/03/2026Fire-Resistant Penetrations and Joints—special
01/03/2026Structural Stability – Alterations of existing buildings—special
01/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/03/2026Concrete - Cast-In-Place—special
01/03/2026Energy Code Compliance Inspections—progress
01/03/2026Fire-Resistance Rated Construction—progress
01/03/2026Air barrier - visual inspection—energy_progress
01/03/2026Interior lighting power—energy_progress
01/03/2026Lighting controls—energy_progress
01/03/2026Fenestration areas—energy_progress
01/03/2026Fenestration air leakage—energy_progress
Latest 25 of 35.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/16/2026Q01341108-S6Request digital key ↗
08/16/2026Q01341108-S4Request digital key ↗
08/16/2026Q01341108-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
10/17/2014420926822Open ↗
03/17/2014420926822Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/11/2014420926822Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/17/2014420926822Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026Q01341108-I1Open ↗
08/13/2026Q01341108-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01341108-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026Q01341108-S7Open ↗
08/16/2026Q01341108-S6Open ↗
08/16/2026Q01341108-S4Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/17/2014420926822Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/17/2014420926822Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/17/2014420926822Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
12/13/2014420926822Open ↗
11/24/2014420926822Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/17/2014420926822Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
12/13/2014420926822Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026Q01341108-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026Q01341108-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01341108-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/16/2026Q01341108-S2Open ↗
08/16/2026Q01341108-S7Open ↗
08/16/2026Q01341108-S6Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/17/2014420926822Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/11/2014420926822Open ↗
04/18/2014420926822Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/11/2014420926822Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/16/2026Q01341108-S4Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
03/17/2014420926822Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/11/2014420926822Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/11/2014420926822Open ↗
04/18/2014420926822Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/17/2014420926822Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram4
08/16/2026Q01341108-S6Open ↗
08/16/2026Q01341108-S4Open ↗
08/16/2026Q01341108-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026Q01341108-I1Open ↗
08/13/2026Q01341108-I1Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
10/17/2014420926822Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01341108-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01341108-I1Open ↗