Two family brick
134-32 BLOSSOM AVENUE
QUEENS · BIN 4115445
💬 Discuss this project
1950Year Built
2Stories
B1Building Class
R6Zoning
2,160 sfGross Floor Area
2Units
Rent Stabilized6 Open Violations ▸
Two family brick · Owner of record: TP BLOSSOM LLC · 2,660 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Roof4p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&T CORP101/19/2026
A & T ENGINEERING, P.C.612/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S Y CONSULTING VIOLATIONS203/21/2026
Building Lifecycle
All (15)Filed (7)Violation (8)
01/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and sprinkler installation work in conjunction job: Q08031216-I1
Q08031216-S2
12/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and sprinkler installation work in conjunction job: Q08031216-I1
Q08031216-S4
12/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and sprinkler installation work in conjunction job: Q08031216-I1
Q08031216-S3
12/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and sprinkler installation work in conjunction job: Q08031216-I1
Q08031216-S5
12/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and sprinkler installation work in conjunction job: Q08031216-I1
Q08031216-S6
11/25/2025
Violation issued (HPD, open)
I
04/12/2024
Violation issued (HPD, closed)
I
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
B
04/10/2024
Violation issued (HPD, open)
C
04/10/2024
Violation issued (HPD, open)
C
04/10/2024
Violation issued (HPD, open)
C
04/13/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and sprinkler installation work in conjunction job: Q08031216-I1
Q08031216-S1
11/03/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and sprinkler installation work in conjunction job: Q08031216-I1
Q08031216-I1
03/29/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Nothing on file for this building.
1 project · most recent 01/19/2026
Sprinkler System
FiledStatusContractorScope
01/19/2026——Sprinkler System
1 project · most recent 01/19/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/19/2026——Storm, Water/Sanitary
1 project · most recent 12/28/2022
FiledStatusContractorScope
12/28/2022Permit IssuedKJK ELECTRIC INC2 meters, 2 new_meters
1 project · most recent 01/19/2026
Steel Concrete Masonry
FiledStatusContractorScope
01/19/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
06/12/2026Excavations - Sheeting, Shoring, and Bracing—special
06/12/2026Concrete - Cast-In-Place—special
06/12/2026Subsurface Investigations (Borings/Test Pits)—special
04/07/2026Excavations - Sheeting, Shoring, and Bracing—special
04/07/2026Subsurface Investigations (Borings/Test Pits)—special
04/07/2026Post-installed Anchors—special
04/07/2026Structural Steel - Welding—special
04/07/2026Structural Steel - Details—special
01/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/19/2026Energy Code Compliance Inspections—progress
12/04/2025Masonry—special
12/04/2025Structural Steel - High Strength Bolting—special
12/04/2025Concrete - Cast-In-Place—special
12/04/2025Structural Steel - Details—special
12/04/2025Structural Cold-Formed Steel—special
12/04/2025Structural Steel - Welding—special
10/23/2025Final—progress
10/23/2025Footing and Foundation—progress
10/23/2025Final—progress
07/25/2025HVAC-R and service water heating system controls—energy_progress
07/25/2025Maintenance information—energy_progress
07/25/2025HVAC-R and service water heating equipment—energy_progress
07/25/2025HVAC-R and service water piping design and insulation—energy_progress
07/23/2025Sprinkler Systems—special
10/31/2022Exterior lighting power—energy_progress
Latest 25 of 40.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/18/2026Q08031216-S1Request digital key ↗
08/18/2026Q08031216-S2Request digital key ↗
08/15/2026Q08031216-S5Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
07/24/2023440774878Open ↗
04/14/2023440774878Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/14/2023440774878Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q08031216-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q08031216-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026Q08031216-S3Open ↗
08/18/2026Q08031216-I1Open ↗
08/18/2026Q08031216-S1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/14/2023440774878Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/14/2023440774878Open ↗
▸Safety & Tenant Protection2
▸BISBPP: STREET TREES SITE PLAN1
07/24/2023440774878Open ↗
▸BISSTREET TREE CHECKLIST1
04/14/2023440774878Open ↗
▸Inspections & Test Reports5
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026Q08031216-S5Open ↗
08/15/2026Q08031216-S3Open ↗
▸DOB NOWSOIL REPORT2
08/15/2026Q08031216-S5Open ↗
08/15/2026Q08031216-S3Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/14/2023440774878Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/14/2023440774878Open ↗
▸Other Documents5
▸BISBPP: TOPOGRAPHIC SURVEY1
07/24/2023440774878Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026Q08031216-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q08031216-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q08031216-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q08031216-I1Open ↗