← Back
Two stories - detached, small or mid-size
190-16 33 AVENUE
QUEENS · BIN 4119047
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,743 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: PRIME TEAM REALTY LLC · 4,642 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 15 docs
Floor 11p · 1 filing · 15 docs
Cellar1p · 1 filing · 15 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/16/2026$1.4M—— → —$795/sf building
03/25/2025$831K—Private party → PRIME TEAM REALTY LLC$477/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.409/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TJAR GROUP CORPGeneral Contractor303/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129409/08/2025
Building Lifecycle
All (38)Filed (4)Permit Issued (2)Signed Off (2)Inspection (7)Special Inspection (23)
12/08/2025
Signed off — Alteration
RENOVATION OF EXISTING ONE-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01204979-S1
09/19/2025
Signed off — Alteration
RENOVATION OF EXISTING ONE-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01204979-I1
09/18/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
09/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
09/09/2025
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
09/09/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
09/09/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
09/08/2025
Filed — Alteration
RENOVATION OF EXISTING ONE-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01204979-P2
09/08/2025
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
09/08/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
09/08/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
09/05/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/31/2025
Filed — Alteration
RENOVATION OF EXISTING ONE-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01204979-P1
08/31/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
08/31/2025
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
08/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
08/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
08/31/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
08/31/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
06/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/02/2025
Permit issued — General Construction
Q01204979-I1-GC
05/01/2025
Permit issued — Plumbing
Q01204979-S1-PL
04/28/2025
Filed — Alteration
RENOVATION OF EXISTING ONE-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01204979-S1
04/28/2025
Filed — Alteration
RENOVATION OF EXISTING ONE-FAMILY RESIDENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01204979-I1
04/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
04/04/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
04/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
04/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
04/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTJAR GROUP CORP05/02/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC05/01/2025
2 projects · most recent 01/16/2026
General Wiring
FiledStatusContractorScope
01/16/2026CompleteDELTA GREEN ELECTRIC INC1 meters, 1 new_meters
12/12/2025CompleteDELTA GREEN ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/09/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
09/09/2025Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
09/09/2025Concrete - Cast-In-PlaceMEHDI GHAZIspecial
09/09/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
09/09/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
09/09/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
09/08/2025Concrete - Cast-In-PlaceMEHDI GHAZIspecial
09/08/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
09/08/2025Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
09/08/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
09/08/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
09/08/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
08/31/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
08/31/2025Concrete - Cast-In-PlaceMEHDI GHAZIspecial
08/31/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
08/31/2025Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
08/31/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
08/31/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
04/04/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
04/04/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
04/04/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
04/04/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
04/04/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q01204979-P2Open ↗
09/01/2026Q01204979-P2Open ↗
08/28/2026Q01204979-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01204979-P2Open ↗
08/28/2026Q01204979-I1Open ↗
08/27/2026Q01204979-P1Open ↗
Showing 3 of 4 on file for this type