| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/08/2026 | — | — | Heating Systems | Heating Rheem PROPE50 M2 RH92 CS 40,000 BTU · Water Heater ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2026 | — | — | — |
| 03/07/2026 | — | — | 44 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/07/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/08/2026 | — | — | Steel, Concrete, Masonry |
| 03/07/2026 | Signed-off | FULIN CONSTRUCTION NY INC | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/07/2026 | Signed-off | FULIN CONSTRUCTION NY INC | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| EHL DEVELOPMENT | 9 | 07/11/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| AMERILAND BROOK LLC | 2 | 05/08/2026 |
| CELTIC WAY CONSULTING LLC | 4 | 03/07/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| AMERILAND BROOK LLC | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| FULIN CONSTRUCTION NY | General Contractor | 1 | 07/11/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Signed-off | FULIN CONSTRUCTION NY INC | 07/10/2026 |
| BIS | PL | ISSUED | MAGNUM PLUMBING & HEATING CORP. | 05/04/1999 |
| BIS | — | ISSUED | N/A | 04/20/1999 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/01/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 05/08/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/08/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 05/08/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 04/23/2026 | Protection of exposed foundation insulation | — | energy_progress |
| 04/23/2026 | Metering | — | energy_progress |
| 03/26/2026 | Fenestration areas | — | energy_progress |
| 03/26/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/26/2026 | Permanent certificate | — | energy_progress |
| 03/26/2026 | Ventilation and air distribution system | — | energy_progress |
| 03/26/2026 | Air barrier — testing | — | energy_progress |
| 03/26/2026 | Fenestration air leakage | — | energy_progress |
| 03/26/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/26/2026 | Insulation placement and R values | — | energy_progress |
| 03/26/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/26/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 03/26/2026 | Air barrier - visual inspection | — | energy_progress |
| 03/25/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 03/25/2026 | Electric vehicle service equipment requirements | — | energy_progress |
| 03/25/2026 | Interior lighting power | — | energy_progress |
| 03/25/2026 | Maintenance information | — | energy_progress |
| 03/25/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/25/2026 | Concrete - Cast-In-Place | — | special |
| 03/25/2026 | Structural Steel - Welding | — | special |
| 03/25/2026 | Structural Steel - High Strength Bolting | — | special |