← Back
Three families
45-59 PARSONS BOULEVARD
QUEENS · BIN 4122862
💬 Discuss this project
1965Year Built
2Stories
C0Building Class
R3XZoning
2,500 sfGross Floor Area
3Units
Three families · 5,566 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
Architecture
Floor 22p · 1 filing · 20 docs
Floor 1
Cellar2p · 1 filing · 20 docs
2 jobs · most recent 08/11/2025
General Wiring
FiledStatusContractorScope
08/11/2025CompleteKJK ELECTRIC INC3 meters
07/02/2025CompleteKJK ELECTRIC INCGeneral Wiring
Building Lifecycle
All (49)Filed (4)Permit Issued (5)Signed Off (2)Inspection (2)Objection (6)Special Inspection (30)
04/02/2026
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01224906-I1
04/01/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/03/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/28/2026
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01224906-S1
01/23/2026
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
01/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
01/23/2026
Special inspection requirement — Heating Systems
MEHDI GHAZI
01/23/2026
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
01/23/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
01/23/2026
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
01/23/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
01/23/2026
Special inspection requirement — Final
MEHDI GHAZI
01/23/2026
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
01/23/2026
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
01/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
01/23/2026
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
01/23/2026
Special inspection requirement — Fenestration areas
MEHDI GHAZI
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
01/06/2026
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01224906-P2
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
01/06/2026
Special inspection requirement — Fenestration areas
MEHDI GHAZI
01/06/2026
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
01/06/2026
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
01/06/2026
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
01/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
01/06/2026
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
01/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
01/06/2026
Special inspection requirement — Final
MEHDI GHAZI
01/06/2026
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
12/16/2025
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01224906-P1
07/03/2025
Permit issued — Plumbing
Q01224906-S1-PL
07/02/2025
Permit issued — General Construction
Q01224906-I1-GC
07/02/2025
Permit issued — General Construction
Q01224906-I1-MS
07/01/2025
Permit issued — General Construction
Q01224906-I1-ST
07/01/2025
Permit issued — General Construction
Q01224906-I1-FO
06/27/2025
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01224906-S1
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
05/30/2025
Objection raised — Other
05/30/2025
Objection raised — Admin
05/30/2025
Objection raised — Scope
05/13/2025
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01224906-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.401/06/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor1004/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129401/06/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC07/03/2025
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP07/02/2025
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP07/02/2025
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP07/01/2025
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP07/01/2025
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/01/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/03/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
01/23/2026Air barrier - visual inspectionMEHDI GHAZIenergy_progress
01/23/2026Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
01/23/2026Heating SystemsMEHDI GHAZIspecial
01/23/2026Mechanical SystemsMEHDI GHAZIspecial
01/23/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
01/23/2026Structural Steel - DetailsMEHDI GHAZIspecial
01/23/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
01/23/2026Structural Steel - High Strength BoltingMEHDI GHAZIspecial
01/23/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
01/23/2026FinalMEHDI GHAZIprogress
01/23/2026Footing and FoundationMEHDI GHAZIprogress
01/23/2026Fenestration air leakageMEHDI GHAZIenergy_progress
01/23/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
01/23/2026Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
01/23/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
01/23/2026Insulation placement and R valuesMEHDI GHAZIenergy_progress
01/23/2026Fenestration areasMEHDI GHAZIenergy_progress
01/23/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
01/06/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
01/06/2026Fenestration areasMEHDI GHAZIenergy_progress
01/06/2026Fenestration air leakageMEHDI GHAZIenergy_progress
01/06/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
01/06/2026Insulation placement and R valuesMEHDI GHAZIenergy_progress
01/06/2026Mechanical SystemsMEHDI GHAZIspecial
01/06/2026Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
Latest 25 of 46.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026Q01224906-S1Request digital key ↗
08/18/2026Q01224906-P2Request digital key ↗
08/18/2026Q01224906-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/18/2026Q01224906-S1Open ↗
08/18/2026Q01224906-I1Open ↗
08/13/2026Q01224906-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/30/2026Q01224906-P2Open ↗
08/30/2026Q01224906-P2Open ↗
08/29/2026Q01224906-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026Q01224906-S1Open ↗
08/18/2026Q01224906-I1Open ↗
08/13/2026Q01224906-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026Q01224906-P2Open ↗
08/29/2026Q01224906-S1Open ↗
08/27/2026Q01224906-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026Q01224906-S1Open ↗
08/18/2026Q01224906-I1Open ↗
08/13/2026Q01224906-P2Open ↗
Showing 3 of 4 on file for this type