← Back
Two family frame
45-51 167 STREET
QUEENS · East Flushing · BIN 4123451
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R2AZoning
3,158 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 6,000 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Floor 23p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUCO CONSTRUCTION1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2018$1.4M—Private party → Private party$427/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CD ARCHITECT STUDIO, LLP404/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CD ARCHITECT STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2UCO CONSTRUCTION CORPGeneral Contractor1007/08/2026
BENT MECHANICAL CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CD ARCHITECT STUDIO, LLP2573110/29/2019
TRIANGLE INSPECTION & TES7495110/29/2019
Building Lifecycle
All (41)Filed (4)Permit Issued (6)Signed Off (3)Violation (2)Inspection (2)Special Inspection (24)
09/16/2021
Signed off — Alteration
Proposed Temporary Construction Fence
Q00170062-I1
09/14/2021
Permit issued — Construction Fence
Q00170062-I1-FN
09/13/2021
Signed off — Alteration
PROPOSED 12 FT. CURB CUT
Q00169945-I1
08/12/2021
Signed off — Alteration
(2) gas boilers (2) hot water heaters and (1) gas dryer @ cellar, (1) gas range at 1st fl, (1) gas range at 2nd fl., (4) 3-fixture bathrooms, (2) washers, (3) sinks, (2) dish washers, (1) drywell with garage connection,(1) floor drain and (1) area drain
Q00253916-I1
07/09/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/19/2021
Permit issued — Plumbing
Q93432769-I1-PL
04/06/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nat Costanza
04/06/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/06/2021
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
04/06/2021
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
04/06/2021
Special inspection requirement — HVAC insulation and sealing
Nat Costanza
04/06/2021
Special inspection requirement — Maintenance information
Nat Costanza
04/06/2021
Special inspection requirement — Electrical energy consumption
Nat Costanza
04/06/2021
Special inspection requirement — HVAC and service water heating system controls
Nat Costanza
04/06/2021
Special inspection requirement — HVAC and service water heating equipment
Nat Costanza
04/05/2021
Filed — Alteration
(2) gas boilers (2) hot water heaters and (1) gas dryer @ cellar, (1) gas range at 1st fl, (1) gas range at 2nd fl., (4) 3-fixture bathrooms, (2) washers, (3) sinks, (2) dish washers, (1) drywell with garage connection,(1) floor drain and (1) area drain
Q00253916-P1
04/01/2021
Special inspection requirement — HVAC and service water heating equipment
Nat Costanza
04/01/2021
Special inspection requirement — HVAC and service water heating system controls
Nat Costanza
04/01/2021
Special inspection requirement — Maintenance information
Nat Costanza
04/01/2021
Special inspection requirement — HVAC insulation and sealing
Nat Costanza
04/01/2021
Special inspection requirement — Electrical energy consumption
Nat Costanza
04/01/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
04/01/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/01/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/01/2021
Special inspection requirement — Energy Code Compliance Inspections
Nat Costanza
04/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
Nat Costanza
04/01/2021
Special inspection requirement — Electrical energy consumption
Nat Costanza
04/01/2021
Special inspection requirement — HVAC and service water heating equipment
Nat Costanza
04/01/2021
Special inspection requirement — Maintenance information
Nat Costanza
04/01/2021
Special inspection requirement — HVAC insulation and sealing
Nat Costanza
04/01/2021
Special inspection requirement — HVAC and service water heating system controls
Nat Costanza
02/08/2021
Permit issued — Curb Cut
Q00169945-I1-CC
09/28/2020
Permit issued — Plumbing
Q93432769-I1-PL
02/25/2020
Permit issued — Construction Fence
Q00170062-I1-FN
10/29/2019
Filed — Alteration
(2) gas boilers (2) hot water heaters and (1) gas dryer @ cellar, (1) gas range at 1st fl, (1) gas range at 2nd fl., (4) 3-fixture bathrooms, (2) washers, (3) sinks, (2) dish washers, (1) drywell with garage connection,(1) floor drain and (1) area drain
Q00253916-I1
06/22/2019
Violation issued (ECB, closed)
Construction
06/22/2019
Violation issued (ECB, closed)
Construction
05/30/2019
Permit issued — Construction Fence
Q00170062-I1-FN
05/22/2019
Filed — Alteration
PROPOSED 12 FT. CURB CUT
Q00169945-I1
05/21/2019
Filed — Alteration
Proposed Temporary Construction Fence
Q00170062-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offSUCO CONSTRUCTION CORP09/14/2021
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP05/19/2021
DOB NOWCurb CutSigned-offSUCO CONSTRUCTION CORP02/08/2021
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP09/28/2020
DOB NOWConstruction FenceSigned-offSUCO CONSTRUCTION CORP02/25/2020
DOB NOWConstruction FenceSigned-offSUCO CONSTRUCTION CORP05/30/2019
BISOTISSUEDSUNRUN INSTALLATION SVC01/18/2023
BIS—ISSUED2UCO CONSTRUCTION CORP02/08/2021
BIS—ISSUED2UCO CONSTRUCTION CORP03/09/2020
BIS—ISSUED2UCO CONSTRUCTION CORP08/15/2019
2 projects · most recent 01/18/2023
General Wiring
FiledStatusContractorScope
01/18/2023Permit IssuedSUNRUN SOLAR ELECTL CORP—
08/27/2019CompleteE & M ELECTRICAL NY CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/09/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/09/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
04/06/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNat Costanzaspecial
04/06/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/06/2021Energy Code Compliance InspectionsNat Costanzaprogress
04/06/2021Fire-Resistance Rated ConstructionNat Costanzaprogress
04/06/2021HVAC insulation and sealing Nat Costanzaenergy_progress
04/06/2021Maintenance informationNat Costanzaenergy_progress
04/06/2021Electrical energy consumptionNat Costanzaenergy_progress
04/06/2021HVAC and service water heating system controls Nat Costanzaenergy_progress
04/06/2021HVAC and service water heating equipment Nat Costanzaenergy_progress
04/01/2021HVAC and service water heating equipmentNat Costanzaenergy_progress
04/01/2021HVAC and service water heating system controlsNat Costanzaenergy_progress
04/01/2021Maintenance informationNat Costanzaenergy_progress
04/01/2021HVAC insulation and sealingNat Costanzaenergy_progress
04/01/2021Electrical energy consumptionNat Costanzaenergy_progress
04/01/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
04/01/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
04/01/2021Subsurface Investigations (Borings/Test Pits)—special
04/01/2021Energy Code Compliance InspectionsNat Costanzaprogress
04/01/2021Fire-Resistance Rated ConstructionNat Costanzaprogress
04/01/2021Electrical energy consumptionNat Costanzaenergy_progress
04/01/2021HVAC and service water heating equipment Nat Costanzaenergy_progress
04/01/2021Maintenance informationNat Costanzaenergy_progress
04/01/2021HVAC insulation and sealing Nat Costanzaenergy_progress
04/01/2021HVAC and service water heating system controls Nat Costanzaenergy_progress
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00253916-I1Request digital key ↗
08/15/2026Q00253916-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00170062-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/28/2026Q00169945-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
01/17/2023440765708Open ↗
10/05/2021421738061Open ↗
09/30/2021421738061Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
01/18/2023440765708Open ↗
04/01/2021421738061Open ↗
03/17/2020421738061Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/31/2021421738061Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
09/15/2021421738061Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/21/2021421738061Open ↗
▸BISZONING DIAGRAM1
08/13/2019421738061Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature14
09/06/2026Q00253916-P1Open ↗
09/06/2026Q00253916-P1Open ↗
08/27/2026Q00253916-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/19/2019421738061Open ↗
08/19/2019421738061Open ↗
08/12/2019421738061Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00169945-I1Open ↗
08/28/2026Q00253916-I1Open ↗
08/28/2026Q00253916-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/17/2023440765708Open ↗
07/29/2019421738061Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q00253916-I1Open ↗
08/27/2026Q00253916-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/29/2019421738061Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/17/2023440765708Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/17/2023440765708Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/15/2021421738061Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/15/2021421738061Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
08/12/2019421738061Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/18/2023440765708Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/19/2019421738061Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/17/2023440765708Open ↗
07/30/2019421738061Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00253916-P1Open ↗
08/28/2026Q00253916-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/19/2019421738061Open ↗
07/29/2019421738061Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/17/2023440765708Open ↗
09/08/2021421738061Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/17/2023440765708Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/17/2023440765708Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/15/2021421738061Open ↗
▸BISNYCECC ANALYSIS1
01/17/2023440765708Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/17/2023440765708Open ↗
09/08/2021421738061Open ↗
09/08/2021421738061Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
09/21/2021421738061Open ↗
08/12/2019421738061Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q00253916-P1Open ↗
08/13/2026Q00253916-I1Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
09/21/2021421738061Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00253916-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/17/2023440765708Open ↗
08/19/2019421738061Open ↗
08/06/2019421738061Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
09/30/2021421738061Open ↗
▸BISCURB CUT (CC) SIGNOFF1
11/05/2021421738061Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/17/2023440765708Open ↗
07/29/2019421738061Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/15/2021421738061Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
10/07/2021421738061Open ↗
08/19/2021421738061Open ↗
08/06/2019421738061Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/17/2023440765708Open ↗
▸BISBOROUGH INTAKE FORM1
04/01/2021421738061Open ↗
▸BISEFILING COVER SHEET1
07/29/2019421738061Open ↗
▸Other Documents4
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/17/2020421738061Open ↗
09/03/2019421738061Open ↗
▸BISPLOT DIAGRAM2
09/21/2021421738061Open ↗
07/29/2019421738061Open ↗