← Back
One story - permanent living quarter
201-24 24 AVENUE
QUEENS · BIN 4129929
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R2AZoning
1,222 sfGross Floor Area
1Units
One story - permanent living quarter · 3,800 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/15/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NL 60,000 BTU · Heat Pump Outdoor ×2
MXZ-SM36NLHZ 36,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 07/14/2026
Fence
FiledStatusContractorScope
07/14/2026——Fence
Building Lifecycle
All (41)Filed (2)Objection (14)Special Inspection (25)
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
08/31/2026
Objection resolved — Resolved
07/14/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01410795-I1
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/14/2026
Objection raised — Other
06/15/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT OF AN EXISTING 1-FAMILY DETACHED RESIDENCE WITH AN ANCILLARY DWELLING UNIT.OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01410748-I1
06/12/2026
Special inspection requirement — Ventilation and air distribution system
06/12/2026
Special inspection requirement — Heating Systems
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/12/2026
Special inspection requirement — Permanent certificate
06/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/12/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
06/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/12/2026
Special inspection requirement — Air barrier — testing
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/12/2026
Special inspection requirement — Fenestration air leakage
06/12/2026
Special inspection requirement — Air barrier - visual inspection
06/12/2026
Special inspection requirement — Maintenance information
06/12/2026
Special inspection requirement — Insulation placement and R values
06/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/12/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/12/2026
Special inspection requirement — Metering
06/12/2026
Special inspection requirement — Interior lighting power
06/12/2026
Special inspection requirement — Protection of exposed foundation insulation
06/12/2026
Special inspection requirement — Fenestration areas
06/02/2026
Special inspection requirement — Mechanical Systems
06/02/2026
Special inspection requirement — Final
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.107/14/2026
MEI ARCHITECT PLLC106/15/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
06/12/2026Ventilation and air distribution system—energy_progress
06/12/2026Heating Systems—special
06/12/2026Fire-Resistant Penetrations and Joints—special
06/12/2026Permanent certificate—energy_progress
06/12/2026Structural Stability – Alterations of existing buildings—special
06/12/2026Subsurface Investigations (Borings/Test Pits)—special
06/12/2026Energy Code Compliance Inspections—progress
06/12/2026Fire-Resistance Rated Construction—progress
06/12/2026Air barrier — testing —energy_progress
06/12/2026HVAC-R and service water heating system controls—energy_progress
06/12/2026HVAC-R and service water piping design and insulation—energy_progress
06/12/2026Fenestration air leakage—energy_progress
06/12/2026Air barrier - visual inspection—energy_progress
06/12/2026Maintenance information—energy_progress
06/12/2026Insulation placement and R values—energy_progress
06/12/2026Duct leakage testing, insulation and design—energy_progress
06/12/2026Electric vehicle service equipment requirements—energy_progress
06/12/2026Fenestration and door U-factor and product ratings—energy_progress
06/12/2026HVAC-R and service water heating equipment—energy_progress
06/12/2026Metering—energy_progress
06/12/2026Interior lighting power—energy_progress
06/12/2026Protection of exposed foundation insulation—energy_progress
06/12/2026Fenestration areas—energy_progress
06/02/2026Mechanical Systems—special
06/02/2026Final—progress
▾Documents — 2 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01410795-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01410795-I1Open ↗