← Back
Two family converted from one family
33-35 208 STREET
QUEENS · BIN 4135570
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R2AZoning
1,563 sfGross Floor Area
2Units
2 Open Violations ▸
Two family converted from one family · 3,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction5p · 1 filing · 10 docs
Floor 1Under Construction6p · 1 filing · 10 docs
CellarUnder Construction5p · 1 filing · 10 docs
1 job · most recent 04/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/27/2026Permit IssuedWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
1 job · most recent 04/06/2026
General Wiring
FiledStatusContractorScope
04/06/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
Building Lifecycle
All (27)Filed (2)Permit Issued (2)Violation (4)Objection (8)Special Inspection (11)
06/17/2026
Permit issued — Plumbing
Q01387664-S1-PL
06/12/2026
Permit issued — General Construction
Q01387664-I1-GC
04/27/2026
Filed — Alteration
Interior renovation of a 2.5 story building on cellar, 1st and 2nd floor as per plan. No change in use, egress and Occupancy.
Q01387664-S1
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
04/21/2026
Objection raised — Other
04/21/2026
Objection resolved — Resolved
04/21/2026
Objection raised — Other
04/21/2026
Objection resolved — Resolved
04/21/2026
Objection raised — Other
04/21/2026
Objection resolved — Resolved
04/21/2026
Objection raised — Other
04/21/2026
Objection resolved — Resolved
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
04/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
04/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
04/17/2026
Special inspection requirement — Maintenance information
XIUCHENG LI
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
04/17/2026
Special inspection requirement — Permanent certificate
XIUCHENG LI
04/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
04/16/2026
Filed — Alteration
Interior renovation of a 2.5 story building on cellar, 1st and 2nd floor as per plan. No change in use, egress and Occupancy.
Q01387664-I1
04/16/2026
Violation issued (ECB, closed)
Construction
04/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIUCHENG LI
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
03/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/19/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC204/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor107/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010204/27/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG06/17/2026
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC06/12/2026
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/22/2026Fire-Resistance Rated ConstructionXIUCHENG LIprogress
04/17/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/17/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
04/17/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
04/17/2026Maintenance informationXIUCHENG LIenergy_progress
04/17/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
04/17/2026Permanent certificateXIUCHENG LIenergy_progress
04/17/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
04/15/2026Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
04/15/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/15/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01387664-S1Request digital key ↗
08/17/2026Q01387664-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q01387664-S1Open ↗
08/28/2026Q01387664-S1Open ↗
08/22/2026Q01387664-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01387664-S1Open ↗
08/17/2026Q01387664-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01387664-S1Open ↗
08/22/2026Q01387664-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01387664-I1Open ↗