← Back
One story - permanent living quarter
135-15 63 AVENUE
QUEENS · BIN 4139836
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3XZoning
1,100 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INNATION ENGINEERING PC208/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781208/05/2026
Building Lifecycle
All (20)Filed (2)Special Inspection (18)
08/05/2026
Filed — Alteration CO
NEW PLUMBING CONSTRUCTION - (PRO) 1 BATH AND 3 F.D. @ CELLAR, (PRO) 1 BATHROOM @ 1ST FLOOR, (PRO) 2 BATHROOM AND 1 K.SINK @ 2ND FLOOR; NEW GAS WORK- (PRO)1 W/H @ 1. CELLAR.
Q01415201-S1
07/23/2026
Filed — Alteration CO
NEW PLUMBING CONSTRUCTION - (PRO) 1 BATH AND 3 F.D. @ CELLAR, (PRO) 1 BATHROOM @ 1ST FLOOR, (PRO) 2 BATHROOM AND 1 K.SINK @ 2ND FLOOR; NEW GAS WORK- (PRO)1 W/H @ 1. CELLAR.
Q01415201-I1
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/16/2026
Special inspection requirement — Lowest Floor Elevation
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Metering
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Metering
CHRISTIAN LOZADA
07/06/2026
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
Nothing on file for this building.
1 project · most recent 08/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/05/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/16/2026Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/16/2026Lowest Floor ElevationCHRISTIAN LOZADAprogress
07/06/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/06/2026Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
07/06/2026Interior lighting powerCHRISTIAN LOZADAenergy_progress
07/06/2026Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
07/06/2026Fenestration areasCHRISTIAN LOZADAenergy_progress
07/06/2026Fenestration air leakageCHRISTIAN LOZADAenergy_progress
07/06/2026Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
07/06/2026Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
07/06/2026Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
07/06/2026MeteringCHRISTIAN LOZADAenergy_progress
07/06/2026Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/06/2026HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
07/06/2026Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
07/06/2026MeteringCHRISTIAN LOZADAenergy_progress
07/06/2026Permanent certificateCHRISTIAN LOZADAenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01415201-S1Request digital key ↗
08/16/2026Q01415201-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q01415201-I1Open ↗
09/01/2026Q01415201-I1Open ↗
09/01/2026Q01415201-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q01415201-I1Open ↗
09/01/2026Q01415201-I1Open ↗
09/01/2026Q01415201-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01415201-S1Open ↗
08/16/2026Q01415201-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01415201-S1Open ↗
08/16/2026Q01415201-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01415201-I1Open ↗