ECB11/07/2025REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTE: AT TIME OF INSPECTION, OBSERVED/NOTED: AT EXTERIOR FRONT ENTRY DOOR - VACATE ORDER STICKER PLACED ON FRONT ENTRY DOOR ON 9/9/2025 (39159779K) HAS BEEN REM$25K due
ECB09/09/2025REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. AT TIME OF INSPECTION, OBSERVED, VACATE ORDER STICKER/POSTER HAS REMOVED, NOWHERE TO BE VIEWED OR NOTICED., COMPLY WITH CODE$25K due
ECB07/16/2025REMOVED OR DEFACED A WRITTEN VACATE ORDER.NOTED AT TIME OF INSPECTION ACTIVE VACATE ORDER#Q149/2022 ISSUED ON 05/18/2022 HAS BEEN REMOVED FROM THE CELLAR LEVEL FRONT DOOR.NEW VACATE STICKER#OP-64-25-00550 POSTE$25K due
ECB06/09/2025REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED: AT TIME OF INSPECTION, ACTIVE VACATE ORDER #Q149/2022 ISSUED ON 05/18/2022 HAS BEENREMOVED FROM CELLAR LEVEL OF PREMISES. REPOSTED VACATE STICKER #OP-64-$25K due
ECB04/09/2025REMOVED OR DEFACED A WRITTEN VACATE ORDER(#Q149/2022) ISSUED ON 5/18/22 BY AHEMED BADGE BAGDE #312. AT TIME OF INSPECTION, OBSERVED POSTED VACATE ORDER STICKER POSTED TO CELLAR ENTRY DOOR. PREVIOUD ECB #3568423$25K due
ECB01/21/2025FAILURE TO OBEY A VACATE FROM THE COMMISSIONER PER 28-207.4. NOTED: ATTHE TIME OF INSPECTION AT CELLAR LEVEL UNDER A VACATE ORDER #Q149/2022ISSUED ON 05/18/2022 CONTINUES TO BE OCCUPIED AS A HOME OFFICE. REMEDY$24K due
ECB11/06/2024REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER NOTED:AT THE TIME OF INSPECTION A POSTED VACATE ORDER#Q149/2022 ISSUED ON 05/18/2022 FOR THE ENTIRE CELLAR HAS BEEN REMOVED FROM THE DOOR.PREVIOUS VIOLATION#3911$25K due
ECB07/22/2024REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. NOTED; AT TIME OF INSPECTION A POSTED VACATE ORDER VAC Q149/2022 FOR THE ENTIRE CELLAR, THAT WAS POSTED ON 05/18/2022 WAS REMOVED. A VACATE ORDER WAS REPOSTED O$12K due
ECB06/26/2024WINDOW AC-UNIT AT FRONT NOT SECURED OR SUPPORTED., REPAIR AND/OR REPLACE$3K due
ECB06/17/2024WORK WITHOUT A PERMIT. RCA IS PAST DUE 60 DAYS, ISSUED 6/29/22 BY #3138 WHO OBSERVED A WOOD STRUCTURE AT FRONT APPROX. 6'W X 18'L X 9'H WITH ELECTRICAL LINE FOR LIGHT FIXTURE. AT REAR, AN AWNING 6'W X 18'L X 8'$6K due
ECB06/06/2023REMOVED A WRITTEN POSTED VACATE ORDER.NOTED:VACATE ORDER Q149-2022 ISSUED ON 05/18/2022 CERTIFICATE AND STICKER REMOVED FOR FRONT DOOR TO CELLAR LEVEL AND FRONT DOOR AT FIRST FLOOR.PREVIOUS VIOLATION 35655684P$25K due
ECB10/21/2022FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED, FRONT GUTTER IS NOT CONNECTED TO THE STORM DRAINAGE AND ITS ALLOWING EXCESS WATER FLOW ON TO ADJACENT PROPERTY & SIDEWALK,$3K due
HPD08/26/2021§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT HOUSEF, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD08/26/2021§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING A DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT THE METAL SCURITY DOOR OF THE BUILDING ENTRANCE.
HPD08/26/2021HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT HOUSEF, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD11/15/2013SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1FLR, 1st STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1FLR, 1st STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE WEST WNDOW UPPER SASH EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1FLR, 1st STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE TUB STOPPER IN THE BATHROOM LOCATED AT APT 1FLR, 2nd STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING CERAMIC WALL TILES IN THE BATHROOM LOCATED AT APT 1FLR, 2nd STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING 8 ELECTRICAL COVER PLATES THROUGH OUT APT LOCATED AT APT 1FLR, 1st STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE 3 BALLUSTERS FROM HAND RAILING LOCATED AT APT 1FLR, 2nd STORY
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1FLR, 2nd STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER 3RD ROOM FROM NORTH LOCATED AT APT 1FLR, 2nd STORY, APARTMENT AT SOUTH
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCKING MECHANISM SECURITY GATE REAR ENTRANCE TO BUILDING
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE CHAIN LINK FENCE REAR YARD
HPD11/15/2013SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCKING MECHANISM SECURITY GATE FRONT ENTRANCE TO BUILDING
ECB06/29/2026AT TIME OF INSPECTION OBSERVED A POSTED VACATE ORDER THAT WAS ISSUED FOR THE CELLAR HAS BEEN DEFACED. NOTED, VACATE ORDERS POSTED AT THIS PREMISE HAVE BEEN REMOVED/DEFACED MORE THAN NINE TIMES PREVIOUSLY., COMPHearing held — result not yet published$25K proposed
ECB12/02/2023FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28-207.4. AT TIME OF INSPECTION, OBSERVED, CELLAR OF PREMISE UNDER VACATE ORDER # Q149/2022 ISSUED ON 05/18/2022 FOR CELLAR OCCUPANCY. AS PER INSPECTIONNothing owed — awaiting certificate of correction
ECB08/19/2022FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.FAILURE TO PROVIDE #OF REQUIRED MEANS OF EGRESS FOR EVERY FL PER BC1018.1&27-366 FOR ILLEGAL OCCPANCY@CELLAR LEVEL.PREV V35637990Y ISSUED5/18/22 DISCONT ILLEGALNothing owed — awaiting certificate of correction
ECB08/19/2022REMOVED OR DEFACED WRITTEN POSTED VACATE ORDER #VACPQ149/2022 ISSUED5/18/22 PREV V35655684P COMPLY W/CODENothing owed — awaiting certificate of correction
ECB08/19/2022OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS.ILLEGAL OCCUPANCY NOTED:@CELLAR LEVEL CONVERTED/OCCUPIED AS CLASSA APT W/1OCCUPANT.USING AS SLEEPING QUARTERS PREV V35637989R DISCONT ILLEGAL OCCUPANCYNothing owed — awaiting certificate of correction
ECB08/19/2022FAILURE TO OBEY VACATE ORDER FROM COMMISH PER 28-207.4 NOTED:ATOI CELLAR LEVEL HAS BEEN REOCCUPIED AS CLASSA APT W/1OCCUPANT USING IT AS SLEEPING QUARTERS.COMPLY W/VACATE ORDER.Nothing owed — awaiting certificate of correction
ECB08/19/2022BC1009.3.1(2008CODE) FAILURE TO MAINTAIN BLGD IN CODECOMPLIANT MANNER.NOTED@FRONT STEPS LEADING TO CELLAR LEVEL.STAIRS,TREADS&RISERS UNEVEN.AS PER BC1009.3.1 DIMENSIONAL UNIFORMITY STAIR TREADS&RISERS SHALL BENothing owed — awaiting certificate of correction
ECB07/14/2022WORK WITHOUT A PERMIT. NOTED: AT REAR OF PREMISES ERECTED BRICK MASONRY EXTENSION ATTACHED TO HOUSE APPROX. 18FT L X 9FT W X 10FT H WITH 6 WINDOWS & ENTRY DOOR, ALSO ERECTED CANOPY IN FRONT OF EXTENSION WITH RONothing owed — awaiting certificate of correction
ECB07/07/2022REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER Q149/2022 ISSUED ON 5/18/22. AT TIME OF INSPECTION WRITTEN POSTED VACATE ORDER REMOVED FROMTHE FRONT DOOR AND ON CELLAR LEVEL,VACATE STILL ACTIVE. REMEDY:COMPLYNothing owed — awaiting certificate of correction
ECB05/18/2022WORK W/O PERMIT WORK NOTED:AT CELLAR LEVEL FULL 3 PCS BATHROOM WITH WATER & WASTE LINE,KITCHEN WITH WATER & WASTE LINE,ELECTRICAL OUTLETS THROUGHOUT CELLAR.REMEDY:OBTAIN WORK PERMIT.Nothing owed — awaiting certificate of correction
ECB05/18/2022OCCUPANDY CONTRARY TO THAT ALLOWED BY C OF O OR BUILDING DEPT RECORDS C OF O #78947 INDICATES PREMISES TO BE USED AS SINGLE FAMILY.ILLEGAL OCCUPANCY NOTED AT CELLAR.CELLAR HAS BEEN OCCUPIED BY MALE AS SLEEPINGNothing owed — awaiting certificate of correction
ECB05/18/2022FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER BC1018.1;27-366;BC1021.1 AT CELLAR LEVEL.REMEDY:DISCONTINUE ILLEGAL OCCUPANCYNothing owed — awaiting certificate of correction
One family attached or semi-detached · 1,800 sf lot · 0.96 FAR built · Flood zone X