← Back
One family attached or semi-detached
137-59 71 AVENUE
QUEENS · BIN 4142610
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R4-1Zoning
1,738 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · 2,987 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction12p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
1 job · most recent 04/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/29/2026Permit IssuedKISHAN PLUMBING INCGas, Water/Sanitary
1 job · most recent 04/29/2026
FiledStatusContractorScope
04/29/2026Permit IssuedH BUILDING MANAGEMENT INC1 scope_items
Building Lifecycle
All (49)Filed (3)Permit Issued (3)Violation (2)Objection (22)Special Inspection (19)
08/19/2026
Permit issued — General Construction
Q01355787-I1-GC
08/18/2026
Permit issued — Construction Fence
Q01355787-S4-FN
06/16/2026
Permit issued — Plumbing
Q01355787-S1-PL
04/29/2026
Filed — Alteration
Structural work in connection with the rear extension at an existing one-family dwelling. No change in use, egress, or occupancy.
Q01355787-S4
04/28/2026
Objection resolved — Resolved
04/28/2026
Objection resolved — Resolved
04/28/2026
Objection resolved — Resolved
04/28/2026
Objection resolved — Resolved
04/22/2026
Objection raised — Cost
03/25/2026
Filed — Alteration
Structural work in connection with the rear extension at an existing one-family dwelling. No change in use, egress, or occupancy.
Q01355787-S1
03/25/2026
Special inspection requirement — Maintenance information
Jose Santos
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Resolved
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Resolved
03/05/2026
Objection raised — Other
03/05/2026
Objection raised — Admin
03/04/2026
Objection raised — Plumbing
03/04/2026
Objection raised — Structural
03/04/2026
Objection raised — Zoning
03/04/2026
Objection raised — Zoning
03/04/2026
Objection raised — Energy
03/04/2026
Objection raised — Scope
03/04/2026
Objection raised — Admin
03/04/2026
Objection raised — Zoning
02/09/2026
Filed — Alteration
Structural work in connection with the rear extension at an existing one-family dwelling. No change in use, egress, or occupancy.
Q01355787-I1
02/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
02/04/2026
Special inspection requirement — Insulation placement and R values
Jose Santos
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
02/04/2026
Special inspection requirement — Fenestration areas
Jose Santos
02/04/2026
Special inspection requirement — Exterior lighting power
Jose Santos
02/04/2026
Special inspection requirement — Interior lighting power
Jose Santos
02/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jose Santos
02/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
02/04/2026
Special inspection requirement — Final
Luis Pichardo
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
02/04/2026
Special inspection requirement — Lighting controls
Jose Santos
02/04/2026
Special inspection requirement — Air barrier - visual inspection
Jose Santos
02/04/2026
Special inspection requirement — Permanent certificate
Jose Santos
01/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC304/29/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDING MANAGEMENT INCGeneral Contractor208/26/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292103/25/2026
BUILDTECH ENGINEERING6369102/09/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedH BUILDING MANAGEMENT INC08/19/2026
DOB NOWConstruction FencePermit IssuedH BUILDING MANAGEMENT INC08/18/2026
DOB NOWPlumbingPermit IssuedKISHAN PLUMBING INC06/16/2026
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/25/2026Maintenance informationJose Santosenergy_progress
03/25/2026Fire-Resistant Penetrations and JointsJose Santosspecial
03/25/2026Energy Code Compliance InspectionsJose Santosprogress
03/25/2026HVAC-R and service water heating system controlsJose Santosenergy_progress
03/25/2026HVAC-R and service water heating equipmentJose Santosenergy_progress
03/25/2026HVAC-R and service water piping design and insulationJose Santosenergy_progress
02/06/2026Fire-Resistance Rated ConstructionJose Santosprogress
02/04/2026Insulation placement and R valuesJose Santosenergy_progress
02/04/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
02/04/2026Fenestration areasJose Santosenergy_progress
02/04/2026Exterior lighting powerJose Santosenergy_progress
02/04/2026Interior lighting powerJose Santosenergy_progress
02/04/2026Fenestration and door U-factor and product ratingsJose Santosenergy_progress
02/04/2026Structural Stability – Alterations of existing buildingsLuis Pichardospecial
02/04/2026FinalLuis Pichardoprogress
02/04/2026Energy Code Compliance InspectionsJose Santosprogress
02/04/2026Lighting controlsJose Santosenergy_progress
02/04/2026Air barrier - visual inspectionJose Santosenergy_progress
02/04/2026Permanent certificateJose Santosenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01355787-S4Request digital key ↗
08/17/2026Q01355787-S1Request digital key ↗
08/15/2026Q01355787-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q01355787-I1Open ↗
08/13/2026Q01355787-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
09/14/2026Q01355787-I1Open ↗
09/14/2026Q01355787-I1Open ↗
09/14/2026Q01355787-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026Q01355787-S1Open ↗
08/17/2026Q01355787-S4Open ↗
08/13/2026Q01355787-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/14/2026Q01355787-I1Open ↗
08/30/2026Q01355787-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01355787-S1Open ↗
08/13/2026Q01355787-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01355787-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01355787-I1Open ↗
▸DOB NOWPlot Diagram1
08/15/2026Q01355787-I1Open ↗