One family attached or semi-detached
141-09 72 AVENUE
QUEENS · BIN 4143391
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R4-1Zoning
1,224 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,500 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Nothing on file for this building.
Building Lifecycle
All (48)Filed (11)Permit Issued (6)Signed Off (4)Violation (4)Inspection (9)Objection (4)Special Inspection (10)
06/29/2026
Filed — Alteration
JOB FILED TO BACKFILL AS PER IED#19795 AND REPAIR FRONT PORCH AND NEW PLANTING IN THE FRONT. REPLACE THE REAR DECK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01330526-P2
06/18/2026
Signed off — Alteration
Q01330382-I1
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alexander Bomstein
05/19/2026
Filed — Alteration
JOB FILED TO BACKFILL AS PER IED#19795 AND REPAIR FRONT PORCH AND NEW PLANTING IN THE FRONT. REPLACE THE REAR DECK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01330526-P1
05/13/2026
Violation issued (ECB, closed)
Zoning
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Alexander Bomstein
04/23/2026
Permit issued — Construction Fence
Q01330382-I1-FN
03/16/2026
Permit issued — General Construction
Q01330526-I1-GC
03/05/2026
Permit issued — Construction Fence
Q01330382-I1-FN
01/29/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
12/30/2025
Objection raised — Cost
12/30/2025
Objection raised — Inspections
12/09/2025
Filed — Alteration
Q01330382-I1
12/09/2025
Filed — Alteration
JOB FILED TO BACKFILL AS PER IED#19795 AND REPAIR FRONT PORCH AND NEW PLANTING IN THE FRONT. REPLACE THE REAR DECK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01330526-I1
12/01/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Signed off — Alteration
Removed the shower and replaced the boiler and water heater as per the submitted drawing.
Q01123381-S2
05/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2025
Filed — Alteration
Removed the shower and replaced the boiler and water heater as per the submitted drawing.
Q01123381-P3
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
05/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/25/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/02/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/31/2025
Signed off — Alteration
Q01147391-I1
03/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/18/2025
Signed off — Alteration
Removed the shower and replaced the boiler and water heater as per the submitted drawing.
Q01123381-I1
03/10/2025
Permit issued — General Construction
Q01147391-I1-GC
03/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
12/11/2024
Special inspection requirement — Final
GLEN LANGER
11/27/2024
Filed — Alteration
Q01147391-I1
11/27/2024
Filed — Alteration
Removed the shower and replaced the boiler and water heater as per the submitted drawing.
Q01123381-P1
11/27/2024
Filed — Alteration
Removed the shower and replaced the boiler and water heater as per the submitted drawing.
Q01123381-P2
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
11/25/2024
Special inspection requirement — Final
GLEN LANGER
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
11/13/2024
Permit issued — Plumbing
Q01123381-S2-PL
10/23/2024
Permit issued — General Construction
Q01123381-I1-GC
10/11/2024
Filed — Alteration
Removed the shower and replaced the boiler and water heater as per the submitted drawing.
Q01123381-S2
10/11/2024
Filed — Alteration
Removed the shower and replaced the boiler and water heater as per the submitted drawing.
Q01123381-I1
04/05/2023
Violation issued (ECB, closed)
Construction
01/03/2022
Special inspection requirement — Concrete - Cast-In-Place
SAEED AINECHI
11/24/2021
Filed — Alteration
Q00637226-I1
11/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAEED AINECHI
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/22/2025$930K—— → —$760/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&B WORLD CONSULTING406/29/2026
SOUTHERN CONSULTING ENGINEERING PC605/09/2025
A&A CONSULTING ENGINEERS PC111/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING1203/21/2026
YBL NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOPE HOME IMPROVEMENT INCGeneral Contractor407/08/2026
ZCREW CONSTRUCTION CORPGeneral Contractor307/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704306/29/2026
S&S CONCRETE & SOIL TESTI1008505/09/2025
A&A CONSULTING ENG. PC3252111/24/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offZCREW CONSTRUCTION CORP04/23/2026
DOB NOWGeneral ConstructionSigned-offZCREW CONSTRUCTION CORP03/16/2026
DOB NOWConstruction FenceSigned-offZCREW CONSTRUCTION CORP03/05/2026
DOB NOWGeneral ConstructionSigned-offHOPE HOME IMPROVEMENT INC03/10/2025
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING11/13/2024
DOB NOWGeneral ConstructionSigned-offHOPE HOME IMPROVEMENT INC10/23/2024
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/02/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/18/2026Structural Stability – Alterations of existing buildingsAlexander Bomsteinspecial
05/07/2026Structural Stability – Alterations of existing buildingsAlexander Bomsteinspecial
05/09/2025Fire-Resistant Penetrations and JointsGLEN LANGERspecial
12/11/2024Fire-Resistant Penetrations and JointsGLEN LANGERspecial
12/11/2024FinalGLEN LANGERprogress
11/25/2024Fire-Resistant Penetrations and JointsGLEN LANGERspecial
11/25/2024FinalGLEN LANGERprogress
11/25/2024Fire-Resistant Penetrations and JointsGLEN LANGERspecial
01/03/2022Concrete - Cast-In-PlaceSAEED AINECHIspecial
11/24/2021Fire-Resistant Penetrations and JointsSAEED AINECHIspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00637226-I1Request digital key ↗
08/21/2026Q01123381-P3Request digital key ↗
08/21/2026Q01123381-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q00637226-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026Q01123381-P2Open ↗
08/21/2026Q01123381-P1Open ↗
08/21/2026Q01123381-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01330526-P1Open ↗
09/01/2026Q01123381-P2Open ↗
09/01/2026Q01123381-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01123381-I1Open ↗
09/01/2026Q01123381-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01123381-P3Open ↗
08/21/2026Q01123381-P2Open ↗
08/21/2026Q01123381-P1Open ↗
Showing 3 of 6 on file for this type