← Back
Two stories - detached, small or mid-size
168-07 67 AVENUE
QUEENS · BIN 4149206
💬 Discuss this project
1955Year Built
2.5Stories
A1Building Class
R2Zoning
2,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction18p · 1 filing · 20 docs
CellarUnder Construction19p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRISE CONTRACTING GROUP, INC705/08/2026
SYNERGIC DESIGN ARCHITECTS107/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THC CONSTRUCTION INCGeneral Contractor1104/09/2026
ACCORD POWER INCGeneral Contractor307/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
STREAM ROCK CONTSRUCTION*General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506205/08/2026
BRIAN ILL DEVELOPMENT LLC1402205/08/2026
HIRISE CONTRACTING GROUP,8228101/01/2026
SYNERGIC DESIGN LLC8561107/01/2024
Building Lifecycle
All (69)Filed (8)Permit Issued (11)Signed Off (3)Violation (1)Inspection (6)Objection (10)Special Inspection (30)
06/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00842256-P2
05/08/2026
Special inspection requirement — Insulation placement and R values
BRIAN ILL
05/08/2026
Special inspection requirement — Fenestration air leakage
BRIAN ILL
05/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN ILL
05/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ILL
05/08/2026
Special inspection requirement — Maintenance information
BRIAN ILL
05/08/2026
Special inspection requirement — Interior lighting power
BRIAN ILL
05/08/2026
Special inspection requirement — Chimneys and vents
BRIAN ILL
05/08/2026
Special inspection requirement — Concrete - Cast-In-Place
BRIAN ILL
05/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ILL
05/08/2026
Special inspection requirement — Heating Systems
BRIAN ILL
05/08/2026
Special inspection requirement — Masonry
BRIAN ILL
05/08/2026
Special inspection requirement — Mechanical Systems
BRIAN ILL
05/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ILL
05/08/2026
Special inspection requirement — Structural Steel - Details
BRIAN ILL
05/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
05/08/2026
Special inspection requirement — Structural Steel - Welding
BRIAN ILL
05/08/2026
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
05/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ILL
05/08/2026
Special inspection requirement — Final
BRIAN ILL
05/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN ILL
05/08/2026
Special inspection requirement — Footing and Foundation
BRIAN ILL
05/08/2026
Special inspection requirement — Fenestration areas
BRIAN ILL
05/08/2026
Special inspection requirement — Air barrier — testing
BRIAN ILL
05/08/2026
Special inspection requirement — Permanent certificate
BRIAN ILL
05/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
BRIAN ILL
05/08/2026
Special inspection requirement — Air barrier - visual inspection
BRIAN ILL
05/08/2026
Special inspection requirement — Ventilation and air distribution system
BRIAN ILL
05/08/2026
Special inspection requirement — Electric vehicle service equipment requirements
BRIAN ILL
05/06/2026
Signed off — Alteration
Installation of 10 kw solar energy system on roof. No change of occupancy, use or egress.
Q01071264-I1
04/21/2026
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00842256
Q00842622-I1
03/11/2026
Permit issued — General Construction
Q00842256-I1-GC-CX
03/08/2026
Objection resolved — Addressed
03/03/2026
Permit issued — Solar
Q01071264-I1-SL
01/30/2026
Objection raised — Cost
01/23/2026
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00842256
Q00842622-P2
01/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY HOUSE. OBTAIN NEW C OF O.
Q00842256-P1
12/24/2025
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00842256
Q00842622-P1
12/22/2025
Permit issued — Plumbing
Q00842622-I1-PL
11/10/2025
Signed off — Alteration
Q00842620-I1
09/26/2025
Permit issued — Solar
Q01071264-I1-SL
05/16/2025
Permit issued — General Construction
Q00842256-I1-GC-CX
05/14/2025
Permit issued — Construction Fence
Q00842620-I1-FN
08/21/2024
Permit issued — Construction Fence
Q00842620-I1-FN
07/11/2024
Permit issued — Solar
Q01071264-I1-SL
07/01/2024
Filed — Alteration
Installation of 10 kw solar energy system on roof. No change of occupancy, use or egress.
Q01071264-I1
06/11/2024
Permit issued — General Construction
Q00842256-I1-GC-CX
05/08/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/20/2023
Permit issued — Plumbing
Q00842622-I1-PL
08/09/2023
Permit issued — Construction Fence
Q00842620-I1-FN
03/18/2023
Objection raised — Inspections
03/18/2023
Objection resolved — Addressed
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTREAM ROCK CONTSRUCTION*03/11/2026
DOB NOWSolarSigned-offACCORD POWER INC03/03/2026
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG12/22/2025
DOB NOWSolarSigned-offACCORD POWER INC09/26/2025
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC05/16/2025
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC05/14/2025
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC08/21/2024
DOB NOWSolarSigned-offACCORD POWER INC07/11/2024
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC06/11/2024
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG09/20/2023
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC08/09/2023
1 project · most recent 05/08/2026
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Associated Ducts and Piping, Heating Systems
Heating
Williamson GWA-100-N-T 100,000 BTU · Boiler ×2
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×10
Air King EB30BL 130 CFM · Kitchen Exhaust ×2
2 projects · most recent 07/10/2024
General Wiring
FiledStatusContractorScope
07/10/2024CompletePOWER SURGE ELECTRIC, INC—
05/17/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 05/08/2026
Concrete Wood
FiledStatusContractorScope
05/08/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Concrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
05/08/2026Insulation placement and R valuesBRIAN ILLenergy_progress
05/08/2026Fenestration air leakageBRIAN ILLenergy_progress
05/08/2026HVAC-R and service water heating equipmentBRIAN ILLenergy_progress
05/08/2026Fenestration and door U-factor and product ratingsBRIAN ILLenergy_progress
05/08/2026Maintenance informationBRIAN ILLenergy_progress
05/08/2026Interior lighting powerBRIAN ILLenergy_progress
05/08/2026Chimneys and ventsBRIAN ILLspecial
05/08/2026Concrete - Cast-In-PlaceBRIAN ILLspecial
05/08/2026Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
05/08/2026Fire-Resistant Penetrations and JointsBRIAN ILLspecial
05/08/2026Heating SystemsBRIAN ILLspecial
05/08/2026MasonryBRIAN ILLspecial
05/08/2026Mechanical SystemsBRIAN ILLspecial
05/08/2026Structural Stability – Alterations of existing buildingsBRIAN ILLspecial
05/08/2026Structural Steel - DetailsBRIAN ILLspecial
05/08/2026Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
05/08/2026Structural Steel - WeldingBRIAN ILLspecial
05/08/2026Subgrade InspectionsXIAOHONG ZHAOspecial
05/08/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
05/08/2026Energy Code Compliance InspectionsBRIAN ILLprogress
05/08/2026FinalBRIAN ILLprogress
05/08/2026Fire-Resistance Rated ConstructionBRIAN ILLprogress
05/08/2026Footing and FoundationBRIAN ILLprogress
05/08/2026Fenestration areasBRIAN ILLenergy_progress
05/08/2026Air barrier — testing BRIAN ILLenergy_progress
Latest 25 of 38.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026Q00842620-I1Request digital key ↗
08/22/2026Q01071264-I1Request digital key ↗
08/17/2026Q00842622-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
05/26/2023440778810Open ↗
04/17/2023440778810Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/17/2023440778810Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/16/2026Q00842256-P2Open ↗
08/13/2026Q00842256-P1Open ↗
08/13/2026Q00842256-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026Q00842256-P2Open ↗
08/16/2026Q00842256-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00842256-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026Q01071264-I1Open ↗
08/17/2026Q00842622-P2Open ↗
08/17/2026Q00842622-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/23/2026Q00842256-P2Open ↗
08/23/2026Q00842256-P2Open ↗
08/23/2026Q00842256-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/23/2026Q00842256-P2Open ↗
08/23/2026Q00842256-P2Open ↗
08/23/2026Q01071264-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/17/2023440778810Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/17/2023440778810Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/16/2026Q00842256-P2Open ↗
08/13/2026Q00842256-I1Open ↗
08/13/2026Q00842256-P1Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREES SITE PLAN1
05/26/2023440778810Open ↗
▸BISSTREET TREE SIGNOFF1
05/26/2023440778810Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026Q00842256-P2Open ↗
08/16/2026Q00842256-P1Open ↗
08/16/2026Q00842256-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/16/2026Q00842256-P2Open ↗
08/13/2026Q00842256-P1Open ↗
08/13/2026Q00842256-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00842256-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/22/2026Q01071264-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
05/26/2023440778810Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/17/2023440778810Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/17/2023440778810Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification3
08/16/2026Q00842256-P2Open ↗
08/16/2026Q00842256-P1Open ↗
08/16/2026Q00842256-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/16/2026Q00842256-P2Open ↗
08/13/2026Q00842256-I1Open ↗
08/13/2026Q00842256-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/16/2026Q00842256-P2Open ↗
08/13/2026Q00842256-I1Open ↗
08/13/2026Q00842256-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
05/26/2023440778810Open ↗
04/17/2023440778810Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
05/26/2023440778810Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/26/2023440778810Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00842256-I1Open ↗