← Back
QUEENS
164-37 77 ROAD
QUEENS · BIN 4150888
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC104/06/2026
Building Lifecycle
All (21)Filed (1)Special Inspection (20)
04/06/2026
Filed — Alteration CO
PROPOSED HORIZONTAL OF AN EXISTING 2 STORY BUILDING W/ ATTIC AND CELLAR WITH GENERAL CONSTRUCTION & MECHANICAL WORK AS PER PLAN. CONVERT ONE FAMILY & 2-STORY TO TWO FAMILY & 2-STORY. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Q01374876-I1
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/19/2026
Special inspection requirement — Chimneys and vents
03/19/2026
Special inspection requirement — Mechanical Systems
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2026
Special inspection requirement — Energy Code Compliance Inspections
03/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/19/2026
Special inspection requirement — Final
03/19/2026
Special inspection requirement — Metering
03/19/2026
Special inspection requirement — Permanent certificate
03/19/2026
Special inspection requirement — Air barrier - visual inspection
03/19/2026
Special inspection requirement — Ventilation and air distribution system
03/19/2026
Special inspection requirement — Insulation placement and R values
03/19/2026
Special inspection requirement — Fenestration air leakage
03/19/2026
Special inspection requirement — Fenestration areas
03/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/19/2026
Special inspection requirement — Interior lighting power
03/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/19/2026
Special inspection requirement — Maintenance information
Nothing on file for this building.
1 project · most recent 04/06/2026
FiledStatusContractorScope
04/06/2026——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/19/2026Fire-Resistant Penetrations and Joints—special
03/19/2026Chimneys and vents—special
03/19/2026Mechanical Systems—special
03/19/2026Structural Stability – Alterations of existing buildings—special
03/19/2026Energy Code Compliance Inspections—progress
03/19/2026Fire-Resistance Rated Construction—progress
03/19/2026Final—progress
03/19/2026Metering—energy_progress
03/19/2026Permanent certificate—energy_progress
03/19/2026Air barrier - visual inspection—energy_progress
03/19/2026Ventilation and air distribution system—energy_progress
03/19/2026Insulation placement and R values—energy_progress
03/19/2026Fenestration air leakage—energy_progress
03/19/2026Fenestration areas—energy_progress
03/19/2026HVAC-R and service water heating system controls—energy_progress
03/19/2026Fenestration and door U-factor and product ratings—energy_progress
03/19/2026Interior lighting power—energy_progress
03/19/2026HVAC-R and service water piping design and insulation—energy_progress
03/19/2026HVAC-R and service water heating equipment—energy_progress
03/19/2026Maintenance information—energy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01374876-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01374876-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01374876-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01374876-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01374876-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026Q01374876-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01374876-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026Q01374876-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01374876-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026Q01374876-I1Open ↗