← Back
One family attached or semi-detached
73-25 174 STREET
QUEENS · BIN 4151144
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R4Zoning
1,980 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 5 docs
Floor 318p · 1 filing · 20 docs
Floor 220p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar22p · 1 filing · 20 docs
Basement1p · 1 filing · 5 docs
1 job · most recent 10/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/29/2025Permit IssuedFORTRESS FORCE CONST. CORHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MAKE: MITSUBISHI ELECTRIC MODEL#MXZ-SM42NAMHZ 42,000 BTU · Vrf Outdoor ×1
York MAKE: YORK MODEL# YHE48B22S 60,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 10/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/29/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
2 jobs · most recent 11/26/2024
General Wiring
FiledStatusContractorScope
11/26/2024CompleteSOURCE ELECTRIC INC1 meters
09/26/2024CompleteKJK ELECTRIC INCGeneral Wiring
1 job · most recent 10/29/2025
Steel Concrete
FiledStatusContractorScope
10/29/2025Signed-offDYNAMIC PLBG & SPRKLR CORSteel, Concrete
Building Lifecycle
All (85)Filed (10)Permit Issued (11)Signed Off (7)Violation (1)Inspection (6)Objection (20)Special Inspection (30)
08/03/2026
Signed off — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-I1
01/09/2026
Signed off — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-S5
11/13/2025
Permit issued — Plumbing
Q01014102-S5-PL
11/13/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
11/10/2025
Signed off — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-S3
11/10/2025
Signed off — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-S1
11/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/29/2025
Filed — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-P3
10/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/28/2025
Special inspection requirement — Maintenance information
NARI MOTWANI
10/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
NARI MOTWANI
10/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
NARI MOTWANI
10/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NARI MOTWANI
10/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARI MOTWANI
10/28/2025
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
09/30/2025
Permit issued — Mechanical Systems
Q01014102-I1-GC-CX
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
09/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
NARI MOTWANI
09/25/2025
Special inspection requirement — Final
NARI MOTWANI
09/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NARI MOTWANI
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
NARI MOTWANI
09/25/2025
Special inspection requirement — Maintenance information
NARI MOTWANI
09/25/2025
Special inspection requirement — Fenestration areas
NARI MOTWANI
09/25/2025
Special inspection requirement — Interior lighting power
NARI MOTWANI
09/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NARI MOTWANI
09/25/2025
Special inspection requirement — Protection of exposed foundation insulation
NARI MOTWANI
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
NARI MOTWANI
09/25/2025
Special inspection requirement — Permanent certificate
NARI MOTWANI
09/25/2025
Special inspection requirement — Air barrier - visual inspection
NARI MOTWANI
09/25/2025
Special inspection requirement — Insulation placement and R values
NARI MOTWANI
09/25/2025
Special inspection requirement — Electric vehicle service equipment requirements
NARI MOTWANI
09/25/2025
Special inspection requirement — Fenestration air leakage
NARI MOTWANI
09/25/2025
Special inspection requirement — Mechanical Systems
NARI MOTWANI
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
09/16/2025
Filed — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-P1
09/15/2025
Objection resolved — Addressed
09/12/2025
Objection raised — Admin
09/05/2025
Filed — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-P2
09/02/2025
Special inspection requirement — Permanent certificate
NARI MOTWANI
09/02/2025
Special inspection requirement — Mechanical Systems
NARI MOTWANI
09/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARI MOTWANI
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
NARI MOTWANI
09/02/2025
Special inspection requirement — Final
NARI MOTWANI
09/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
NARI MOTWANI
05/08/2025
Permit issued — Construction Fence
Q01014102-S1-FN
04/17/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01150809-I1
03/03/2025
Permit issued — Solar
Q01150809-I1-SL
01/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2025
Objection resolved — Addressed
01/13/2025
Signed off — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-S2
01/13/2025
Signed off — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-S7
12/27/2024
Objection raised — Other
12/17/2024
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01150809-I1
11/25/2024
Permit issued — Support of Excavation
Q01014102-S7-SE
11/22/2024
Permit issued — Mechanical Systems
Q01014102-I1-GC-CX
11/21/2024
Violation issued (ECB, closed)
Construction
10/16/2024
Permit issued — Foundation
Q01014102-S2-FO-EA
10/01/2024
Filed — Alteration CO
HEREWITH FILING FO/EA PLANS FOR HORIZONTAL & VERTICAL EXTENSION OF EXISTING 2-STORY BUILDING. THE PROPOSED FOUNDATION INCLUDES CONTINUOUS CONCRETE FOOTINGS.THIS APPLICATION IS FILED SUBSEQUENT TO GC APPLICATION UNDER DOB JOB NO: Q01014102-I1
Q01014102-S7
09/30/2024
Objection resolved — Addressed
Latest 60 of 85 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMINOV DESIGN ENGINEER, PC610/29/2025
M-CON ENGINEERING, PC112/17/2024
RAS PE CONSULTING ENGINEERS310/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORTRESS FORCE CONST. CORGeneral Contractor1207/08/2026
SUSTAINABLE STRATEGIESGeneral Contractor203/21/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERING & CONSULTI3652810/29/2025
M-CON ENGINEERING7341112/17/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS11/13/2025
DOB NOWMechanical SystemsPermit IssuedFORTRESS FORCE CONST. COR09/30/2025
DOB NOWConstruction FenceSigned-offFORTRESS FORCE CONST. COR05/08/2025
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES03/03/2025
DOB NOWSupport of ExcavationSigned-offFORTRESS FORCE CONST. COR11/25/2024
DOB NOWMechanical SystemsPermit IssuedFORTRESS FORCE CONST. COR11/22/2024
DOB NOWFoundationSigned-offFORTRESS FORCE CONST. COR10/16/2024
DOB NOWStructuralSigned-offFORTRESS FORCE CONST. COR09/11/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS08/09/2024
DOB NOWGeneral ConstructionPermit IssuedFORTRESS FORCE CONST. COR07/09/2024
DOB NOWConstruction FenceSigned-offFORTRESS FORCE CONST. COR05/23/2024
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/13/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
10/28/2025Maintenance informationNARI MOTWANIenergy_progress
10/28/2025HVAC-R and service water heating equipmentNARI MOTWANIenergy_progress
10/28/2025HVAC-R and service water heating system controlsNARI MOTWANIenergy_progress
10/28/2025HVAC-R and service water piping design and insulationNARI MOTWANIenergy_progress
10/28/2025Fire-Resistant Penetrations and JointsNARI MOTWANIspecial
10/28/2025Energy Code Compliance InspectionsNARI MOTWANIprogress
09/25/2025Energy Code Compliance InspectionsNARI MOTWANIprogress
09/25/2025Fire-Resistance Rated ConstructionNARI MOTWANIprogress
09/25/2025FinalNARI MOTWANIprogress
09/25/2025HVAC-R and service water piping design and insulationNARI MOTWANIenergy_progress
09/25/2025HVAC-R and service water heating system controlsNARI MOTWANIenergy_progress
09/25/2025Maintenance informationNARI MOTWANIenergy_progress
09/25/2025Fenestration areasNARI MOTWANIenergy_progress
09/25/2025Interior lighting powerNARI MOTWANIenergy_progress
09/25/2025Fenestration and door U-factor and product ratingsNARI MOTWANIenergy_progress
09/25/2025Protection of exposed foundation insulationNARI MOTWANIenergy_progress
09/25/2025HVAC-R and service water heating equipmentNARI MOTWANIenergy_progress
09/25/2025Permanent certificateNARI MOTWANIenergy_progress
09/25/2025Air barrier - visual inspectionNARI MOTWANIenergy_progress
09/25/2025Insulation placement and R valuesNARI MOTWANIenergy_progress
09/25/2025Electric vehicle service equipment requirementsNARI MOTWANIenergy_progress
09/25/2025Fenestration air leakageNARI MOTWANIenergy_progress
09/25/2025Mechanical SystemsNARI MOTWANIspecial
09/25/2025Structural Stability – Alterations of existing buildingsNARI MOTWANIspecial
09/02/2025Permanent certificateNARI MOTWANIenergy_progress
Latest 25 of 52.
▾Documents — 102 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026Q01014102-S2Request digital key ↗
08/21/2026Q01014102-I1Request digital key ↗
08/21/2026Q01014102-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01014102-P2Open ↗
08/13/2026Q01014102-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01014102-I1Open ↗
▸Seals & Professional Certifications62
▸DOB NOWProgress Inspector Seal & Signature40
09/01/2026Q01014102-S7Open ↗
08/30/2026Q01014102-P3Open ↗
08/30/2026Q01014102-P3Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026Q01014102-S7Open ↗
09/01/2026Q01014102-S7Open ↗
08/30/2026Q01014102-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026Q01150809-I1Open ↗
08/13/2026Q01014102-S5Open ↗
08/13/2026Q01014102-S1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01014102-P2Open ↗
08/13/2026Q01014102-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/21/2026Q01150809-I1Open ↗
08/13/2026Q01014102-P1Open ↗
08/13/2026Q01014102-S1Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01150809-I1Open ↗
▸Other Documents14
▸DOB NOWPlot Diagram4
08/13/2026Q01014102-S7Open ↗
08/13/2026Q01014102-S2Open ↗
08/13/2026Q01014102-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01014102-I1Open ↗
08/13/2026Q01014102-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q01014102-P2Open ↗
08/13/2026Q01014102-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01014102-S2Open ↗
08/13/2026Q01014102-S7Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01014102-P2Open ↗
08/13/2026Q01014102-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026Q01014102-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01014102-S3Open ↗