← Back
Two stories - detached, small or mid-size
76-36 173 STREET
QUEENS · BIN 4151854
💬 Discuss this project
1955Year Built
2.5Stories
A1Building Class
R2Zoning
2,131 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,750 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 10 docs
Cellar1p · 1 filing · 10 docs
1 job · most recent 12/15/2025
FiledStatusContractorScope
12/15/2025——2 scope_items
Building Lifecycle
All (29)Filed (2)Objection (5)Special Inspection (22)
02/20/2026
Special inspection requirement — Air barrier — testing
12/25/2025
Objection raised — Zoning
12/25/2025
Objection raised — Structural
12/25/2025
Objection raised — Structural
12/25/2025
Objection raised — Structural
12/25/2025
Objection raised — Admin
12/15/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED: NEW EXTENSION AT CELLAR, 1st AND 2nd FLOOR AND GENERAL RENOVATION
Q01332990-I1
12/15/2025
Special inspection requirement — Concrete - Cast-In-Place
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Masonry
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Subgrade Inspections
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Metering
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Electric vehicle service equipment requirements
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Interior lighting power
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Maintenance information
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Fenestration air leakage
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Permanent certificate
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Insulation placement and R values
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Air barrier - visual inspection
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Fenestration areas
ANTHONY CUCICH
12/15/2025
Special inspection requirement — Protection of exposed foundation insulation
ANTHONY CUCICH
12/12/2025
Special inspection requirement — Footing and Foundation
12/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/12/2025
Special inspection requirement — Final
11/25/2025
Filed — Alteration
Q01314197-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2025$1.2M—Private party → Private party$572/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY CUCICH ARCHITECT212/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANTHONY CUCICH ARCHITECT203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANTHONY CUCICH ARCHITECT6081112/15/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/20/2026Air barrier — testing —energy_progress
12/15/2025Concrete - Cast-In-PlaceANTHONY CUCICHspecial
12/15/2025Excavations - Sheeting, Shoring, and BracingANTHONY CUCICHspecial
12/15/2025Exterior Insulation and Finish Systems (EIFS)ANTHONY CUCICHspecial
12/15/2025Fire-Resistant Penetrations and JointsANTHONY CUCICHspecial
12/15/2025MasonryANTHONY CUCICHspecial
12/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationANTHONY CUCICHspecial
12/15/2025Subgrade InspectionsANTHONY CUCICHspecial
12/15/2025MeteringANTHONY CUCICHenergy_progress
12/15/2025Electric vehicle service equipment requirementsANTHONY CUCICHenergy_progress
12/15/2025Interior lighting powerANTHONY CUCICHenergy_progress
12/15/2025Maintenance informationANTHONY CUCICHenergy_progress
12/15/2025Fenestration air leakageANTHONY CUCICHenergy_progress
12/15/2025Permanent certificateANTHONY CUCICHenergy_progress
12/15/2025Fenestration and door U-factor and product ratingsANTHONY CUCICHenergy_progress
12/15/2025Insulation placement and R valuesANTHONY CUCICHenergy_progress
12/15/2025Air barrier - visual inspectionANTHONY CUCICHenergy_progress
12/15/2025Fenestration areasANTHONY CUCICHenergy_progress
12/15/2025Protection of exposed foundation insulationANTHONY CUCICHenergy_progress
12/12/2025Footing and Foundation—progress
12/12/2025Structural Stability – Alterations of existing buildings—special
12/12/2025Final—progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01314197-I1Request digital key ↗
08/18/2026Q01332990-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026Q01332990-I1Open ↗
08/13/2026Q01332990-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01332990-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026Q01314197-I1Open ↗
08/18/2026Q01332990-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01332990-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/18/2026Q01332990-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01332990-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01332990-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/18/2026Q01332990-I1Open ↗