← Back
Professional building / stand-alone funeral home
167-20 UNION TURNPIKE
QUEENS · BIN 4152095
💬 Discuss this project
1985Year Built
2Stories
O7Building Class
R3-2Zoning
7,000 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: CYT UNION LLC · 4,402 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
Mechanical
Roof2p · 2 filings · 12 docs
Floor 11p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUEENS MANAGEMENT SERVICES403/21/2026
QNS MRI ASSOC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC206/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SYSTEMATIC CONTROL CORPGeneral Contractor203/21/2026
SAV-MOR MECHANICAL, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLM ENGINEERING PLLC6913306/25/2024
Building Lifecycle
All (21)Filed (2)Permit Issued (2)Signed Off (2)Violation (8)Special Inspection (7)
10/24/2024
Signed off — Alteration
Replacement of existing process air cooling chiller for MRI machine cooling system on the roof with related condensing units previously filed under #421741495 as per plans filed herewith.
Q01033277-I1
10/22/2024
Permit issued — Mechanical Systems
Q01033277-I1-MS
06/25/2024
Filed — Alteration
Replacement of existing process air cooling chiller for MRI machine cooling system on the roof with related condensing units previously filed under #421741495 as per plans filed herewith.
Q01033277-I1
08/24/2023
Violation issued (FDNY_NOV, closed)
01/31/2023
Signed off — Alteration
Replacing existing two roof top condensing units with related indoor air handler units as per plans filed herewith.
Q08040830-I1
01/26/2023
Permit issued — Mechanical Systems
Q08040830-I1-MS
11/18/2022
Filed — Alteration
Replacing existing two roof top condensing units with related indoor air handler units as per plans filed herewith.
Q08040830-I1
11/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
11/18/2022
Special inspection requirement — Tenant Protection Plan Compliance
Ronald Merhige
11/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Merhige
11/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
11/18/2022
Special inspection requirement — Maintenance information
Ronald Merhige
11/16/2022
Special inspection requirement — Final
Ronald Merhige
11/16/2022
Special inspection requirement — Mechanical Systems
Ronald Merhige
06/22/2022
Violation issued (FDNY_NOV, closed)
08/11/2015
Violation issued (FDNY_NOV, closed)
02/03/2010
Violation issued (FDNY_NOV, closed)
09/05/1990
Violation issued (ECB, closed)
Construction
11/08/1989
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1988
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSYSTEMATIC CONTROL CORP10/22/2024
DOB NOWMechanical SystemsSigned-offSAV-MOR MECHANICAL, INC01/26/2023
BISMHISSUEDCONSOLIDATION COMFORT INC03/18/2004
BISOTISSUEDARIS CONSTRUCTION10/22/2003
BISOTISSUEDARIS CONSTRUCTION CO08/12/2003
BIS—ISSUEDMIZZI & BRANCACCIO07/15/1991
BIS—ISSUEDASI/ NEW YORK SIGN SYSTEMS INC10/17/1990
BISPLISSUEDLAKESIDE TECHNICAL PLUMBING & HE04/23/1990
BIS—ISSUEDPALADIUM BUILDERS INC04/11/1990
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
11/18/2022Energy Code Compliance InspectionsRonald Merhigeprogress
11/18/2022Tenant Protection Plan ComplianceRonald Merhigespecial
11/18/2022HVAC-R and service water heating system controlsRonald Merhigeenergy_progress
11/18/2022HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
11/18/2022Maintenance informationRonald Merhigeenergy_progress
11/16/2022FinalRonald Merhigeprogress
11/16/2022Mechanical SystemsRonald Merhigespecial
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q08040830-I1Request digital key ↗
08/22/2026Q01033277-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026Q08040830-I1Open ↗
08/25/2026Q08040830-I1Open ↗
08/25/2026Q08040830-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q08040830-I1Open ↗
08/13/2026Q01033277-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q08040830-I1Open ↗
08/25/2026Q08040830-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q08040830-I1Open ↗