← Back
One story - permanent living quarter
73-32 195 STREET
QUEENS · BIN 4154331
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R2AZoning
1,418 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 15 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2021$840K—— → —$592/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC504/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC PLBG AND HTG INCPlumbing307/08/2026
RONG MAINTENANCE INCGeneral Contractor206/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG ENGINEERING PLLC8512404/04/2025
OFFICE OF XIAO YE ZHENG,7471109/06/2022
Building Lifecycle
All (45)Filed (5)Permit Issued (5)Signed Off (2)Inspection (5)Special Inspection (28)
07/24/2026
Signed off — Alteration
INTERIOR PLUMBING WORK AT CELLAR OF EXISTING ONE-FAMILY BUILDING. TO CONVERT EXISTING OIL BOILER TO GAS BOILER AND TO INSTALL NEW GAS HOT WATER HEATER. PROPOSED 3-PIECE BATHROOM AT CELLAR. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00743175-I1
07/24/2026
Signed off — Alteration
INTERIOR CELLAR RENOVATION OF EXISTING ONE-FAMILY BUILDING WITH PARTITION WALL WORK. CELLAR BOILER ROOM AND BATHROOM WORK. WORK AT FRONT PORCH AND REAR STAIR. ALL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00743171-I1
06/23/2026
Permit issued — General Construction
Q00743171-I1-GC
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
04/21/2025
Special inspection requirement — Maintenance information
XIAO ZHENG
04/21/2025
Special inspection requirement — Permanent certificate
XIAO ZHENG
04/21/2025
Special inspection requirement — Metering
XIAO ZHENG
04/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
04/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
04/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
04/04/2025
Filed — Alteration
INTERIOR PLUMBING WORK AT CELLAR OF EXISTING ONE-FAMILY BUILDING. TO CONVERT EXISTING OIL BOILER TO GAS BOILER AND TO INSTALL NEW GAS HOT WATER HEATER. PROPOSED 3-PIECE BATHROOM AT CELLAR. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00743175-P1
04/04/2025
Filed — Alteration
INTERIOR CELLAR RENOVATION OF EXISTING ONE-FAMILY BUILDING WITH PARTITION WALL WORK. CELLAR BOILER ROOM AND BATHROOM WORK. WORK AT FRONT PORCH AND REAR STAIR. ALL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00743171-P2
12/05/2024
Special inspection requirement — Metering
XIAO ZHENG
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
12/05/2024
Special inspection requirement — Maintenance information
XIAO ZHENG
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
12/05/2024
Special inspection requirement — Permanent certificate
XIAO ZHENG
10/25/2024
Permit issued — Plumbing
Q00743175-I1-PL
10/24/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/12/2023
Permit issued — Plumbing
Q00743175-I1-PL
09/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/07/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/06/2022
Filed — Alteration
INTERIOR CELLAR RENOVATION OF EXISTING ONE-FAMILY BUILDING WITH PARTITION WALL WORK. CELLAR BOILER ROOM AND BATHROOM WORK. WORK AT FRONT PORCH AND REAR STAIR. ALL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00743171-P1
09/06/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
09/06/2022
Special inspection requirement — Masonry
XIAO ZHENG
09/06/2022
Special inspection requirement — Subgrade Inspections
XIAO ZHENG
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
09/06/2022
Special inspection requirement — Concrete - Cast-In-Place
XIAO ZHENG
09/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIAO ZHENG
09/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIAO ZHENG
09/06/2022
Special inspection requirement — Maintenance information
XIAO ZHENG
09/06/2022
Special inspection requirement — Metering
XIAO ZHENG
09/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
09/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
09/06/2022
Special inspection requirement — Final
XIAO ZHENG
07/12/2022
Permit issued — Plumbing
Q00743175-I1-PL
07/07/2022
Permit issued — General Construction
Q00743171-I1-GC
05/22/2022
Filed — Alteration
INTERIOR PLUMBING WORK AT CELLAR OF EXISTING ONE-FAMILY BUILDING. TO CONVERT EXISTING OIL BOILER TO GAS BOILER AND TO INSTALL NEW GAS HOT WATER HEATER. PROPOSED 3-PIECE BATHROOM AT CELLAR. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00743175-I1
05/22/2022
Filed — Alteration
INTERIOR CELLAR RENOVATION OF EXISTING ONE-FAMILY BUILDING WITH PARTITION WALL WORK. CELLAR BOILER ROOM AND BATHROOM WORK. WORK AT FRONT PORCH AND REAR STAIR. ALL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00743171-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC06/23/2026
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC10/25/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC10/12/2023
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC07/12/2022
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC07/07/2022
1 project · most recent 04/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2025Signed-offXH&RC PLBG AND HTG INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/24/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/21/2025Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
04/21/2025Maintenance informationXIAO ZHENGenergy_progress
04/21/2025Permanent certificateXIAO ZHENGenergy_progress
04/21/2025MeteringXIAO ZHENGenergy_progress
04/21/2025HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
04/21/2025HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
04/21/2025HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
04/21/2025Energy Code Compliance InspectionsXIAO ZHENGprogress
12/05/2024MeteringXIAO ZHENGenergy_progress
12/05/2024Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
12/05/2024Energy Code Compliance InspectionsXIAO ZHENGprogress
12/05/2024HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
12/05/2024HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
12/05/2024Maintenance informationXIAO ZHENGenergy_progress
12/05/2024HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
12/05/2024Permanent certificateXIAO ZHENGenergy_progress
09/06/2022Energy Code Compliance InspectionsXIAO ZHENGprogress
09/06/2022MasonryXIAO ZHENGspecial
09/06/2022Subgrade InspectionsXIAO ZHENGspecial
09/06/2022Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
09/06/2022Concrete - Cast-In-PlaceXIAO ZHENGspecial
09/06/2022HVAC-R and service water heating system controlsXIAO ZHENGenergy_progress
09/06/2022HVAC-R and service water heating equipmentXIAO ZHENGenergy_progress
09/06/2022Maintenance informationXIAO ZHENGenergy_progress
09/06/2022MeteringXIAO ZHENGenergy_progress
Latest 25 of 28.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00743175-P1Request digital key ↗
08/26/2026Q00743175-I1Request digital key ↗
08/20/2026Q00743171-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/26/2026Q00743175-I1Open ↗
08/20/2026Q00743171-P1Open ↗
08/20/2026Q00743171-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature12
08/24/2026Q00743171-P1Open ↗
08/24/2026Q00743171-P1Open ↗
08/24/2026Q00743171-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/24/2026Q00743171-P1Open ↗
08/24/2026Q00743171-P1Open ↗
08/24/2026Q00743171-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00743175-I1Open ↗
08/20/2026Q00743171-I1Open ↗
08/13/2026Q00743171-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00743175-I1Open ↗
08/20/2026Q00743171-I1Open ↗
08/20/2026Q00743171-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/26/2026Q00743175-I1Open ↗
08/20/2026Q00743171-I1Open ↗