← Back
Two stories - detached, small or mid-size
75-24 179 STREET
QUEENS · BIN 4154665
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,128 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 11/12/2025
Fence
FiledStatusContractorScope
11/12/2025——Fence
Building Lifecycle
All (39)Filed (2)Objection (15)Special Inspection (22)
06/26/2026
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/26/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Zoning
12/05/2025
Objection raised — Other
12/05/2025
Objection raised — Zoning
12/05/2025
Objection raised — Zoning
12/05/2025
Objection raised — Zoning
12/05/2025
Objection raised — Inspections
12/05/2025
Objection raised — Structural
12/05/2025
Objection raised — Admin
12/05/2025
Objection raised — Scope
11/12/2025
Filed — Alteration
8-'0" TEMPORARY CONSTRUCTION WOOD FENCE
Q01306928-I1
10/15/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01301691-I1
10/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/13/2025
Special inspection requirement — Concrete - Cast-In-Place
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Masonry
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Subgrade Inspections
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Final
10/13/2025
Special inspection requirement — Footing and Foundation
10/13/2025
Special inspection requirement — Air barrier - visual inspection
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Electric vehicle service equipment requirements
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Interior lighting power
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Maintenance information
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Insulation placement and R values
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Protection of exposed foundation insulation
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Fenestration areas
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Metering
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Fenestration air leakage
ANTHONY CUCICH
10/13/2025
Special inspection requirement — Permanent certificate
ANTHONY CUCICH
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2025$1.4M—Private party → Private party$1,230/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANTHONY CUCICH ARCHITECT211/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANTHONY CUCICH ARCHITECT203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANTHONY CUCICH ARCHITECT6081110/15/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
10/13/2025Structural Stability – Alterations of existing buildings—special
10/13/2025Concrete - Cast-In-PlaceANTHONY CUCICHspecial
10/13/2025Excavations - Sheeting, Shoring, and BracingANTHONY CUCICHspecial
10/13/2025Exterior Insulation and Finish Systems (EIFS)ANTHONY CUCICHspecial
10/13/2025Fire-Resistant Penetrations and JointsANTHONY CUCICHspecial
10/13/2025MasonryANTHONY CUCICHspecial
10/13/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationANTHONY CUCICHspecial
10/13/2025Subgrade InspectionsANTHONY CUCICHspecial
10/13/2025Energy Code Compliance InspectionsANTHONY CUCICHprogress
10/13/2025Final—progress
10/13/2025Footing and Foundation—progress
10/13/2025Air barrier - visual inspectionANTHONY CUCICHenergy_progress
10/13/2025Electric vehicle service equipment requirementsANTHONY CUCICHenergy_progress
10/13/2025Interior lighting powerANTHONY CUCICHenergy_progress
10/13/2025Fenestration and door U-factor and product ratingsANTHONY CUCICHenergy_progress
10/13/2025Maintenance informationANTHONY CUCICHenergy_progress
10/13/2025Insulation placement and R valuesANTHONY CUCICHenergy_progress
10/13/2025Protection of exposed foundation insulationANTHONY CUCICHenergy_progress
10/13/2025Fenestration areasANTHONY CUCICHenergy_progress
10/13/2025MeteringANTHONY CUCICHenergy_progress
10/13/2025Fenestration air leakageANTHONY CUCICHenergy_progress
10/13/2025Permanent certificateANTHONY CUCICHenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01306928-I1Request digital key ↗
08/15/2026Q01301691-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026Q01301691-I1Open ↗
08/13/2026Q01306928-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026Q01301691-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01301691-I1Open ↗