← Back
Two stories - detached, small or mid-size
80-55 188 STREET
QUEENS · BIN 4156325
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,784 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,150 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 09/30/2025
FiledStatusContractorScope
09/30/2025CompleteBRANDL ELECTRIC INC.1 meters, 1 new_meters
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Signed Off (1)Violation (3)Special Inspection (5)
03/05/2026
Signed off — Alteration
Q01300716-I1
12/19/2025
Permit issued — Solar
Q01300716-I1-SL
12/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BORIS BALKHIYEV
10/20/2025
Filed — Alteration
Q01300716-I1
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BORIS BALKHIYEV
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
BORIS BALKHIYEV
10/09/2025
Special inspection requirement — Final
BORIS BALKHIYEV
10/09/2025
Special inspection requirement — Air barrier - visual inspection
BORIS BALKHIYEV
08/13/2024
Violation issued (ECB, open)
Zoning
05/07/2024
Violation issued (ECB, open)
Construction
07/24/2023
Violation issued (ECB, open)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BORIS BALKHIYEV, PE110/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Solar Solutions103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADVANCED SOLAR SOLUTIONSGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MB INSPECTIONS, CORP.8703110/20/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offADVANCED SOLAR SOLUTIONS12/19/2025
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/04/2025Structural Stability – Alterations of existing buildingsBORIS BALKHIYEVspecial
10/09/2025Fire-Resistant Penetrations and JointsBORIS BALKHIYEVspecial
10/09/2025Energy Code Compliance InspectionsBORIS BALKHIYEVprogress
10/09/2025FinalBORIS BALKHIYEVprogress
10/09/2025Air barrier - visual inspectionBORIS BALKHIYEVenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026Q01300716-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01300716-I1Open ↗
09/01/2026Q01300716-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01300716-I1Open ↗
09/01/2026Q01300716-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01300716-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01300716-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01300716-I1Open ↗