← Back
Two stories - detached, small or mid-size
80-47 188 STREET
QUEENS · BIN 4156327
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,836 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,150 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 1 filing · 20 docs
Floor 2Under Construction17p · 1 filing · 20 docs
Floor 1Under Construction17p · 1 filing · 20 docs
CellarUnder Construction17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIIC BUILDERS908/07/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS302/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFE ASSURE CONSTRUCTIONGeneral Contractor208/05/2026
BT'S PLUMBING AND HEATINGPlumbing108/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519202/19/2026
Building Lifecycle
All (37)Filed (3)Permit Issued (3)Violation (1)Special Inspection (30)
08/12/2026
Violation issued (ECB, open)
Construction
08/06/2026
Permit issued — Plumbing
Q01347724-S2-PL
08/04/2026
Permit issued — General Construction
Q01347724-I1-GC-CX
07/15/2026
Permit issued — Construction Fence
Q01347724-S1-FN
02/19/2026
Filed — Alteration
Q01347724-S2
02/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
02/17/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
02/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
02/17/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/26/2026
Filed — Alteration
Q01347724-S1
01/20/2026
Filed — Alteration
Q01347724-I1
01/20/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
01/20/2026
Special inspection requirement — Fireplaces
Younes Abouyaala
01/20/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
01/16/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
01/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/16/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
01/16/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
01/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
01/16/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
01/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/16/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
01/16/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
01/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/16/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
01/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
01/16/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/16/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/16/2026
Special inspection requirement — Final
NAVEEN KUMAR
01/16/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
01/16/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
01/16/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
01/16/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING08/06/2026
DOB NOWGeneral ConstructionPermit IssuedSAFE ASSURE CONSTRUCTION08/04/2026
DOB NOWConstruction FencePermit IssuedSAFE ASSURE CONSTRUCTION07/15/2026
1 project · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedKAYLEE ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
02/17/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
02/17/2026Permanent certificateYounes Abouyaalaenergy_progress
02/17/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
02/17/2026Maintenance informationYounes Abouyaalaenergy_progress
02/17/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/17/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/17/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/20/2026Permanent certificateYounes Abouyaalaenergy_progress
01/20/2026FireplacesYounes Abouyaalaenergy_progress
01/20/2026Air barrier — testing Younes Abouyaalaenergy_progress
01/16/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
01/16/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
01/16/2026Fenestration air leakageYounes Abouyaalaenergy_progress
01/16/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
01/16/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
01/16/2026Mechanical SystemsYounes Abouyaalaspecial
01/16/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
01/16/2026Maintenance informationYounes Abouyaalaenergy_progress
01/16/2026Lighting controlsYounes Abouyaalaenergy_progress
01/16/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
01/16/2026Interior lighting powerYounes Abouyaalaenergy_progress
01/16/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
01/16/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/16/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
01/16/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 30.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01347724-I1Request digital key ↗
08/17/2026Q01347724-S1Request digital key ↗
08/17/2026Q01347724-S2Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01347724-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature7
08/26/2026Q01347724-I1Open ↗
08/26/2026Q01347724-I1Open ↗
08/26/2026Q01347724-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026Q01347724-I1Open ↗
08/26/2026Q01347724-I1Open ↗
08/26/2026Q01347724-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026Q01347724-S1Open ↗
08/17/2026Q01347724-S2Open ↗
08/17/2026Q01347724-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01347724-S2Open ↗
08/17/2026Q01347724-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01347724-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026Q01347724-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01347724-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026Q01347724-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01347724-I1Open ↗