← Back
Two stories - detached, small or mid-size
217-54 54 AVENUE
QUEENS · BIN 4159218
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,674 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,200 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction11p · 1 filing · 20 docs
CellarUnder Construction12p · 1 filing · 20 docs
1 job · most recent 06/26/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Heating Systems
Heating
A.O. Smith PROPE50 M2 RH92 CS 40,000 BTU · Water Heater ×2
1 job · most recent 06/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/26/2026Signed-offWATSON'S PLBG, HTG, & BDGStorm, Water/Sanitary
1 job · most recent 09/03/2026
General Wiring
FiledStatusContractorScope
09/03/2026CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 job · most recent 06/26/2026
Steel Masonry Wood
FiledStatusContractorScope
06/26/2026Permit IssuedSTREAM ROCK CONTSRUCTION*Steel, Masonry, Wood
Building Lifecycle
All (69)Filed (5)Permit Issued (9)Signed Off (1)Inspection (4)Objection (20)Special Inspection (30)
08/03/2026
Objection resolved — Resolved
07/31/2026
Objection raised — Admin
06/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE PLUMBING PERMIT FOR OSP ONLYIN CONJUNCTION WITH JOB#Q01035541
Q01035541-P1
06/25/2026
Special inspection requirement — Air barrier — testing
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Fenestration air leakage
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Ventilation and air distribution system
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Air barrier - visual inspection
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Masonry
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Structural Steel - Details
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Final
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Structural Wood Frame
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Fenestration areas
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
03/02/2026
Permit issued — Mechanical Systems
Q01035541-I1-GC
02/16/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
FILE PLUMBING PERMIT FOR OSP ONLYIN CONJUNCTION WITH JOB#Q01035541
Q01035541-S1
05/14/2025
Permit issued — Structural
Q01035541-I1-GC
05/14/2025
Permit issued — Construction Fence
Q01035541-S1-FN
02/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE PLUMBING PERMIT FOR OSP ONLYIN CONJUNCTION WITH JOB#Q01035541
Q01035541-S3
09/16/2024
Permit issued — Plumbing
Q01035541-S2-PL
08/21/2024
Objection resolved — Addressed
08/13/2024
Permit issued — General Construction
Q01035541-I1-GC
08/12/2024
Permit issued — Foundation
Q01035541-I1-MS
08/12/2024
Permit issued — Construction Fence
Q01035541-S1-FN
08/12/2024
Permit issued — Structural
Q01035541-I1-ST
08/12/2024
Permit issued — General Construction
Q01035541-I1-FO-EA
06/17/2024
Objection resolved — Addressed
06/17/2024
Objection resolved — Addressed
06/14/2024
Objection raised — Admin
06/07/2024
Objection raised — Other
06/07/2024
Objection resolved — Addressed
06/07/2024
Objection resolved — Addressed
06/05/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
FILE PLUMBING PERMIT FOR OSP ONLYIN CONJUNCTION WITH JOB#Q01035541
Q01035541-S2
05/31/2024
Objection raised — Other
05/31/2024
Objection resolved — Addressed
05/31/2024
Objection raised — Other
05/31/2024
Objection resolved — Addressed
Latest 60 of 69 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC506/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THC CONSTRUCTION INCGeneral Contractor1307/08/2026
STREAM ROCK CONTSRUCTION*General Contractor104/09/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506406/26/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSTREAM ROCK CONTSRUCTION*03/02/2026
DOB NOWStructuralPermit IssuedTHC CONSTRUCTION INC05/14/2025
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC05/14/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG09/16/2024
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC08/13/2024
DOB NOWFoundationPermit IssuedTHC CONSTRUCTION INC08/12/2024
DOB NOWConstruction FenceSigned-offTHC CONSTRUCTION INC08/12/2024
DOB NOWStructuralPermit IssuedTHC CONSTRUCTION INC08/12/2024
DOB NOWGeneral ConstructionPermit IssuedTHC CONSTRUCTION INC08/12/2024
BISOTISSUEDPHILIP TOSCANO05/27/2011
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/25/2026Air barrier — testing XIAOHONG ZHAOenergy_progress
06/25/2026Fenestration air leakageXIAOHONG ZHAOenergy_progress
06/25/2026Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
06/25/2026Maintenance informationXIAOHONG ZHAOenergy_progress
06/25/2026Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
06/25/2026Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
06/25/2026Interior lighting powerXIAOHONG ZHAOenergy_progress
06/25/2026Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
06/25/2026Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
06/25/2026Permanent certificateXIAOHONG ZHAOenergy_progress
06/25/2026Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
06/25/2026Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
06/25/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
06/25/2026Heating SystemsXIAOHONG ZHAOspecial
06/25/2026MasonryXIAOHONG ZHAOspecial
06/25/2026Mechanical SystemsXIAOHONG ZHAOspecial
06/25/2026Structural Stability – Alterations of existing buildingsXIAOHONG ZHAOspecial
06/25/2026Structural Steel - DetailsXIAOHONG ZHAOspecial
06/25/2026Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
06/25/2026Structural Steel - WeldingXIAOHONG ZHAOspecial
06/25/2026Subgrade InspectionsXIAOHONG ZHAOspecial
06/25/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
06/25/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
06/25/2026FinalXIAOHONG ZHAOprogress
06/25/2026Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
Latest 25 of 41.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01035541-S3Request digital key ↗
08/21/2026Q01035541-S1Request digital key ↗
08/21/2026Q01035541-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
11/05/2025440826064Open ↗
04/20/2011420345585Open ↗
▸BISWORK PERMIT APPLICATION1
05/31/2011420345585Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/20/2025440826064Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026Q01035541-P1Open ↗
08/13/2026Q01035541-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026Q01035541-P1Open ↗
08/13/2026Q01035541-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01035541-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature7
08/27/2026Q01035541-S2Open ↗
08/27/2026Q01035541-S2Open ↗
08/27/2026Q01035541-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01035541-P1Open ↗
08/13/2026Q01035541-S1Open ↗
08/13/2026Q01035541-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q01035541-S2Open ↗
08/23/2026Q01035541-S3Open ↗
08/22/2026Q01035541-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/16/2011420345585Open ↗
05/31/2011420345585Open ↗
04/20/2011420345585Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/05/2025440826064Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/05/2025440826064Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026Q01035541-P1Open ↗
08/13/2026Q01035541-I1Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
11/20/2025440826064Open ↗
11/05/2025440826064Open ↗
04/20/2011420345585Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/20/2025440826064Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/20/2011420345585Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/14/2026Q01035541-P1Open ↗
08/13/2026Q01035541-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01035541-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/16/2011420345585Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/16/2011420345585Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/20/2011420345585Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/16/2011420345585Open ↗
04/20/2011420345585Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/05/2025440826064Open ↗
▸BISEFILING COVER SHEET1
04/20/2011420345585Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/20/2025440826064Open ↗
▸Other Documents13
▸DOB NOWProperty Ownership Certification2
08/14/2026Q01035541-P1Open ↗
08/13/2026Q01035541-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026Q01035541-P1Open ↗
08/13/2026Q01035541-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026Q01035541-P1Open ↗
08/13/2026Q01035541-I1Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
11/20/2025440826064Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
11/20/2025440826064Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/20/2025440826064Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/20/2025440826064Open ↗
▸BISBPP: GRADE STUDY1
11/20/2025440826064Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/05/2025440826064Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01035541-I1Open ↗