← Back
Two stories - detached, small or mid-size
58-56 OCEANIA STREET
QUEENS · BIN 4160627
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2AZoning
2,297 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Floor 212p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
Basement1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS KIM ENGINEERING PC110/10/2025
VATCHE GHAZARIAN, PE610/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G&G BEST CONSTRUCTION CORGeneral Contractor407/08/2026
SUNATION SOLAR SYSTEMSGeneral Contractor303/21/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARUN CORP8842110/10/2025
AA BUILDING & INSPECTION1519510/20/2023
Building Lifecycle
All (71)Filed (7)Permit Issued (4)Signed Off (3)Inspection (2)Objection (25)Special Inspection (30)
01/06/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01298862-I1
10/20/2025
Permit issued — Solar
Q01298862-I1-SL
10/10/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01298862-I1
10/23/2023
Objection raised — Scope
10/20/2023
Filed — Alteration CO
NEW 3-PIECE BATHROOM, NEW WASHER ON SECOND FLOOR, BASEBOARD HOT WATER HEATING, IN CONJUNCTION WITH DOB NOW ALT1 APPLICATION JOB NO Q00768659-I1
Q00768659-P4
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/20/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
10/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Vatche Ghazarian
10/20/2023
Special inspection requirement — Final
Vatche Ghazarian
10/20/2023
Special inspection requirement — Structural Wood Frame
Vatche Ghazarian
10/20/2023
Special inspection requirement — Interior lighting power
Vatche Ghazarian
10/20/2023
Special inspection requirement — Fenestration areas
Vatche Ghazarian
10/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Vatche Ghazarian
10/20/2023
Special inspection requirement — Insulation placement and R values
Vatche Ghazarian
10/20/2023
Special inspection requirement — Fenestration air leakage
Vatche Ghazarian
10/20/2023
Special inspection requirement — Air barrier - visual inspection
Vatche Ghazarian
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/02/2023
Special inspection requirement — Insulation placement and R values
Vatche Ghazarian
10/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Vatche Ghazarian
10/02/2023
Special inspection requirement — Fenestration areas
Vatche Ghazarian
10/02/2023
Special inspection requirement — Air barrier - visual inspection
Vatche Ghazarian
10/02/2023
Special inspection requirement — Fenestration air leakage
Vatche Ghazarian
10/02/2023
Special inspection requirement — Interior lighting power
Vatche Ghazarian
10/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Vatche Ghazarian
10/02/2023
Special inspection requirement — Final
Vatche Ghazarian
10/02/2023
Special inspection requirement — Structural Wood Frame
Vatche Ghazarian
10/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/02/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
09/13/2023
Filed — Alteration CO
NEW 3-PIECE BATHROOM, NEW WASHER ON SECOND FLOOR, BASEBOARD HOT WATER HEATING, IN CONJUNCTION WITH DOB NOW ALT1 APPLICATION JOB NO Q00768659-I1
Q00768659-P3
09/13/2023
Special inspection requirement — Air barrier - visual inspection
Vatche Ghazarian
09/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/13/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
09/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Vatche Ghazarian
09/13/2023
Special inspection requirement — Final
Vatche Ghazarian
05/08/2023
Signed off — Alteration CO
NEW 3-PIECE BATHROOM, NEW WASHER ON SECOND FLOOR, BASEBOARD HOT WATER HEATING, IN CONJUNCTION WITH DOB NOW ALT1 APPLICATION JOB NO Q00768659-I1
Q00768659-S1
04/20/2023
Signed off — Alteration
Q08006699-I1
02/21/2023
Objection resolved — Addressed
02/20/2023
Objection resolved — Addressed
02/18/2023
Objection raised — Zoning
02/18/2023
Objection raised — Fire_Protection
02/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/14/2023
Objection resolved — Addressed
02/14/2023
Objection resolved — Addressed
01/09/2023
Objection raised — Other
01/09/2023
Objection raised — Other
01/04/2023
Filed — Alteration CO
NEW 3-PIECE BATHROOM, NEW WASHER ON SECOND FLOOR, BASEBOARD HOT WATER HEATING, IN CONJUNCTION WITH DOB NOW ALT1 APPLICATION JOB NO Q00768659-I1
Q00768659-P2
11/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2022
Permit issued — Plumbing
Q00768659-S1-PL
11/01/2022
Permit issued — General Construction
Q00768659-I1-GC-CX
10/26/2022
Permit issued — Construction Fence
Q08006699-I1-FN
09/20/2022
Filed — Alteration
Q08006699-I1
09/02/2022
Objection raised — Scope
09/02/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Scope
08/29/2022
Objection resolved — Addressed
08/25/2022
Filed — Alteration CO
NEW 3-PIECE BATHROOM, NEW WASHER ON SECOND FLOOR, BASEBOARD HOT WATER HEATING, IN CONJUNCTION WITH DOB NOW ALT1 APPLICATION JOB NO Q00768659-I1
Q00768659-S1
08/23/2022
Objection raised — Zoning
08/23/2022
Objection resolved — Addressed
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS10/20/2025
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC11/18/2022
DOB NOWGeneral ConstructionPermit IssuedG&G BEST CONSTRUCTION COR11/01/2022
DOB NOWConstruction FenceSigned-offG&G BEST CONSTRUCTION COR10/26/2022
1 project · most recent 10/20/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2023Permit IssuedG&G BEST CONSTRUCTION CORAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric Mitsubishi - 36k BTU - M-Series H2i Outdoor Condenser MODEL : MXZ-SM36NAMHZ 36,000 BTU · Vrf Outdoor ×3
Thermocore T3-OS209-EW 36,000 BTU ×1
Heating
Williamson Williamson GWA-100-N-T-S2-W GWA 100,000 BTU · Furnace ×3
Weil-Mclain WEIL McLAIN EG45-PI 100,000 BTU · Furnace ×1
Ventilation
Broan BROAN- NuTone 80 CFM 0.8 SONE CEILING model# 655-c/655f-c 80 CFM · Exhaust Fan ×3
BROAN 80 CFM 0.8 SONE CEILING 80 CFM · Exhaust Fan ×1
1 project · most recent 10/20/2023
Water/Sanitary
FiledStatusContractorScope
10/20/2023Signed-offAMM GEN'L CONTRACTING INCWater/Sanitary
2 projects · most recent 10/03/2025
General Wiring
FiledStatusContractorScope
10/03/2025CompleteGALLANT ELEC'L CONST, INC—
03/11/2023CompleteRIVIERA ELECTRIC CORPGeneral Wiring
1 project · most recent 10/20/2023
Wood
FiledStatusContractorScope
10/20/2023Signed-offAMM GEN'L CONTRACTING INCWood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
10/20/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/20/2023Mechanical SystemsYounes Abouyaalaspecial
10/20/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/20/2023Energy Code Compliance InspectionsVatche Ghazarianprogress
10/20/2023FinalVatche Ghazarianprogress
10/20/2023Structural Wood FrameVatche Ghazarianprogress
10/20/2023Interior lighting powerVatche Ghazarianenergy_progress
10/20/2023Fenestration areasVatche Ghazarianenergy_progress
10/20/2023Fenestration and door U-factor and product ratingsVatche Ghazarianenergy_progress
10/20/2023Insulation placement and R valuesVatche Ghazarianenergy_progress
10/20/2023Fenestration air leakageVatche Ghazarianenergy_progress
10/20/2023Air barrier - visual inspectionVatche Ghazarianenergy_progress
10/02/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/02/2023Insulation placement and R valuesVatche Ghazarianenergy_progress
10/02/2023Fenestration and door U-factor and product ratingsVatche Ghazarianenergy_progress
10/02/2023Fenestration areasVatche Ghazarianenergy_progress
10/02/2023Air barrier - visual inspectionVatche Ghazarianenergy_progress
10/02/2023Fenestration air leakageVatche Ghazarianenergy_progress
10/02/2023Interior lighting powerVatche Ghazarianenergy_progress
10/02/2023Energy Code Compliance InspectionsVatche Ghazarianprogress
10/02/2023FinalVatche Ghazarianprogress
10/02/2023Structural Wood FrameVatche Ghazarianprogress
10/02/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/02/2023Mechanical SystemsYounes Abouyaalaspecial
09/13/2023Air barrier - visual inspectionVatche Ghazarianenergy_progress
Latest 25 of 52.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q08006699-I1Request digital key ↗
08/24/2026Q00768659-P3Request digital key ↗
08/18/2026Q01298862-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00768659-P3Open ↗
08/13/2026Q00768659-P2Open ↗
08/13/2026Q00768659-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00768659-I1Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature39
08/25/2026Q00768659-I1Open ↗
08/25/2026Q00768659-I1Open ↗
08/25/2026Q00768659-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00768659-I1Open ↗
08/24/2026Q00768659-S1Open ↗
08/24/2026Q00768659-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/25/2026Q00768659-I1Open ↗
08/25/2026Q00768659-S1Open ↗
08/25/2026Q00768659-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00768659-P2Open ↗
08/13/2026Q00768659-I1Open ↗
08/13/2026Q00768659-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00768659-P3Open ↗
08/14/2026Q00768659-I1Open ↗
08/14/2026Q00768659-S1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00768659-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01298862-I1Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial4
08/13/2026Q00768659-P4Open ↗
08/13/2026Q00768659-P2Open ↗
08/13/2026Q00768659-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00768659-P4Open ↗
08/13/2026Q00768659-P3Open ↗
08/13/2026Q00768659-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00768659-P3Open ↗
08/13/2026Q00768659-P4Open ↗
08/13/2026Q00768659-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026Q00768659-P3Open ↗
08/14/2026Q00768659-I1Open ↗
08/14/2026Q00768659-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00768659-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00768659-I1Open ↗