← Back
Two stories - detached, small or mid-size
80-23 208 STREET
QUEENS · BIN 4164526
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,998 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 2Under Construction13p · 1 filing · 20 docs
Floor 1Under Construction12p · 1 filing · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS507/10/2026
TOM PETERSEN101/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING6860603/21/2026
GERALD J. CALIENDO R.A., P.C.103/21/2026
GERALD J CALIENDO R A P C103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AT HOME CONSTRUCTION LLCGeneral Contractor507/08/2026
ZONE PLUMBING & HEATING CPlumbing208/11/2026
SOLARBLOCKS ENERGY LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519307/10/2026
THOMAS PETERSEN ARCHITECT7854101/08/2026
Building Lifecycle
All (73)Filed (6)Permit Issued (8)Signed Off (1)Violation (3)Inspection (9)Objection (16)Special Inspection (30)
08/14/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/10/2026
Permit issued — Plumbing
Q01188696-S2-PL
08/07/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/10/2026
Signed off — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR EXTENSION IN AN EXISTING TWO-STORY ONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO THE USE, OCCUPANCY, OR EGRESS.
Q01188696-S1
07/10/2026
Filed — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR EXTENSION IN AN EXISTING TWO-STORY ONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO THE USE, OCCUPANCY, OR EGRESS.
Q01188696-P2
05/13/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/27/2026
Permit issued — Construction Fence
Q01188696-S1-FN
04/27/2026
Permit issued — Curb Cut
Q01227675-I1-CC
04/27/2026
Permit issued — Foundation
Q01188696-I1-GC-CX
04/17/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/17/2026
Special inspection requirement — Final
NAVEEN KUMAR
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/17/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
04/17/2026
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
04/17/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/17/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
04/17/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/17/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
04/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/17/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
04/17/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
04/17/2026
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
04/17/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/17/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
04/17/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
04/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
04/17/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/17/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/02/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/28/2026
Objection resolved — Addressed
01/12/2026
Permit issued — Solar
Q01344168-I1-SL
01/08/2026
Filed — Alteration
Q01344168-I1
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2025
Permit issued — Plumbing
Q01188696-S2-PL
06/02/2025
Objection raised — Scope
05/17/2025
Filed — Alteration
FILING NEW CURB CUT APPLICATION IN CONJUNCTION WITH JOB NUMBER Q01188696-I1
Q01227675-I1
05/16/2025
Permit issued — Construction Fence
Q01188696-S1-FN
05/16/2025
Permit issued — General Construction
Q01188696-I1-GC-CX
05/04/2025
Objection resolved — Addressed
05/04/2025
Objection resolved — Addressed
05/01/2025
Objection raised — Plumbing
05/01/2025
Objection raised — Admin
05/01/2025
Objection resolved — Addressed
04/21/2025
Filed — Alteration
HEREWITH FILE AN ALTERATION TO DO A REAR EXTENSION IN AN EXISTING TWO-STORY ONE-FAMILY DWELLING, TO ERECT INTERIOR PARTITIONS AND PLUMBING TO BE FILED SUBSEQUENTLY, AND TO OBTAIN A LETTER OF COMPLETION. NO CHANGE TO THE USE, OCCUPANCY, OR EGRESS.
Q01188696-S2
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
04/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/21/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/19/2025
Objection resolved — Addressed
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C08/10/2026
DOB NOWConstruction FenceSigned-offAT HOME CONSTRUCTION LLC04/27/2026
DOB NOWCurb CutPermit IssuedAT HOME CONSTRUCTION LLC04/27/2026
DOB NOWFoundationPermit IssuedAT HOME CONSTRUCTION LLC04/27/2026
DOB NOWSolarSigned-offSOLARBLOCKS ENERGY LLC01/12/2026
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C07/11/2025
DOB NOWConstruction FenceSigned-offAT HOME CONSTRUCTION LLC05/16/2025
DOB NOWGeneral ConstructionPermit IssuedAT HOME CONSTRUCTION LLC05/16/2025
BISPLISSUEDWOODHAVEN PLUMBING & HEATING06/17/1992
BIS—ISSUEDDESIGN BATH&TILE OF LONG ISLAND05/29/1992
1 project · most recent 07/10/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2026Permit IssuedAT HOME CONSTRUCTION LLCVentilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×6
Heating
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×6
Ventilation
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×6
1 project · most recent 07/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/10/2026Permit Issued5 BORO'S PLUMBING INCGas, Storm, Water/Sanitary
3 projects · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026CompleteMDC SECURITY AND ELEC'L—
01/01/2026Permit IssuedELECTRICIAN NYC LLCGeneral Wiring
08/04/2025Permit IssuedLENS ELECTRIC, INCGeneral Wiring
1 project · most recent 07/10/2026
Wood
FiledStatusContractorScope
07/10/2026Permit Issued5 BORO'S PLUMBING INCWood
1 project · most recent 07/10/2026
Fence
FiledStatusContractorScope
07/10/2026Permit Issued5 BORO'S PLUMBING INCFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/07/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/13/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/02/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/17/2026Fenestration air leakageYounes Abouyaalaenergy_progress
04/17/2026FinalNAVEEN KUMARprogress
04/17/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/17/2026Footing and FoundationYounes Abouyaalaprogress
04/17/2026Structural Wood FrameYounes Abouyaalaprogress
04/17/2026Interior lighting powerYounes Abouyaalaenergy_progress
04/17/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/17/2026Exterior lighting powerYounes Abouyaalaenergy_progress
04/17/2026Fenestration areasYounes Abouyaalaenergy_progress
04/17/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
04/17/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/17/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/17/2026Lighting controlsYounes Abouyaalaenergy_progress
04/17/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
04/17/2026Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
04/17/2026Permanent certificateYounes Abouyaalaenergy_progress
04/17/2026Shutoff dampersYounes Abouyaalaenergy_progress
04/17/2026Maintenance informationYounes Abouyaalaenergy_progress
04/17/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/17/2026Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/17/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
04/17/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/17/2026Mechanical SystemsYounes Abouyaalaspecial
04/17/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/17/2026Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
Latest 25 of 44.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01188696-S1Request digital key ↗
08/20/2026Q01188696-P2Request digital key ↗
08/20/2026Q01188696-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/31/2025401996818Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 13
08/20/2026Q01188696-P2Open ↗
08/13/2026Q01188696-S2Open ↗
08/13/2026Q01188696-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026Q01188696-P2Open ↗
08/13/2026Q01188696-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026Q01188696-P2Open ↗
08/13/2026Q01188696-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026Q01188696-S2Open ↗
08/25/2026Q01188696-P2Open ↗
08/25/2026Q01188696-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026Q01188696-S2Open ↗
08/28/2026Q01188696-S2Open ↗
08/25/2026Q01188696-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01188696-S2Open ↗
08/20/2026Q01188696-S1Open ↗
08/20/2026Q01188696-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01188696-S2Open ↗
08/20/2026Q01188696-I1Open ↗
08/20/2026Q01188696-P2Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026Q01188696-P2Open ↗
08/13/2026Q01188696-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01188696-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01344168-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/20/2026Q01188696-P2Open ↗
08/13/2026Q01188696-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026Q01188696-P2Open ↗
08/13/2026Q01188696-I1Open ↗
▸DOB NOWPlot Diagram2
08/20/2026Q01188696-P2Open ↗
08/13/2026Q01188696-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01188696-I1Open ↗