← Back
One story - permanent living quarter
80-07 215 STREET
QUEENS · BIN 4164755
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R2AZoning
1,200 sfGross Floor Area
1Units
One story - permanent living quarter · 5,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof3p · 1 filing · 11 docs
Cellar4p · 1 filing · 11 docs
1 job · most recent 07/31/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/31/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-N48LCU-230VO 48,000 BTU · Condensing Unit ×1
CH-N60LCU-230VO 60,000 BTU · Condensing Unit ×1
Heating
Cooper & Hunter CH-48AHU 48,000 BTU · Ahu ×1
CH-60AHU 60,000 BTU · Ahu ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 job · most recent 07/31/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/31/2026——Gas, Storm, Water/Sanitary
1 job · most recent 07/31/2026
Steel Wood
FiledStatusContractorScope
07/31/2026——Steel, Wood
1 job · most recent 07/31/2026
Fence
FiledStatusContractorScope
07/31/2026——Fence
Building Lifecycle
All (33)Filed (3)Special Inspection (30)
07/31/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION #Q01415322-I1.
Q01415322-S2
07/31/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION #Q01415322-I1.
Q01415322-I1
07/31/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION #Q01415322-I1.
Q01415322-S1
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/30/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/30/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
07/30/2026
Special inspection requirement — Energy Code Compliance Inspections
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/30/2026
Special inspection requirement — Maintenance information
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/29/2026
Special inspection requirement — Ventilation and air distribution system
07/29/2026
Special inspection requirement — Fenestration areas
07/29/2026
Special inspection requirement — Air barrier — testing
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/29/2026
Special inspection requirement — Air barrier - visual inspection
07/29/2026
Special inspection requirement — Insulation placement and R values
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/29/2026
Special inspection requirement — Fenestration air leakage
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/29/2026
Special inspection requirement — Permanent certificate
06/10/2026
Special inspection requirement — Subgrade Inspections
06/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/10/2026
Special inspection requirement — Final
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
06/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/10/2026
Special inspection requirement — Structural Wood Frame
06/10/2026
Special inspection requirement — Footing and Foundation
06/10/2026
Special inspection requirement — Interior lighting power
06/10/2026
Special inspection requirement — Electric vehicle service equipment requirements
06/10/2026
Special inspection requirement — Metering
06/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM ENGINEERING PLLC207/31/2026
PETER CHO ARCHITECTS, PLLC107/31/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
07/30/2026Fire-Resistant Penetrations and Joints—special
07/30/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/30/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
07/30/2026Energy Code Compliance Inspections—progress
07/30/2026HVAC-R and service water piping design and insulation—energy_progress
07/30/2026HVAC-R and service water heating equipment—energy_progress
07/30/2026Maintenance information—energy_progress
07/30/2026HVAC-R and service water heating system controls—energy_progress
07/29/2026Ventilation and air distribution system—energy_progress
07/29/2026Fenestration areas—energy_progress
07/29/2026Air barrier — testing —energy_progress
07/29/2026HVAC-R and service water heating equipment—energy_progress
07/29/2026Air barrier - visual inspection—energy_progress
07/29/2026Insulation placement and R values—energy_progress
07/29/2026HVAC-R and service water heating system controls—energy_progress
07/29/2026Fenestration air leakage—energy_progress
07/29/2026HVAC-R and service water piping design and insulation—energy_progress
07/29/2026Fenestration and door U-factor and product ratings—energy_progress
07/29/2026Permanent certificate—energy_progress
06/10/2026Subgrade Inspections—special
06/10/2026Subsurface Investigations (Borings/Test Pits)—special
06/10/2026Final—progress
06/10/2026Energy Code Compliance Inspections—progress
06/10/2026Fire-Resistance Rated Construction—progress
06/10/2026Structural Wood Frame—progress
Latest 25 of 41.
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01415322-S2Request digital key ↗
08/16/2026Q01415322-I1Request digital key ↗
08/16/2026Q01415322-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01415322-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01415322-S2Open ↗
08/16/2026Q01415322-I1Open ↗
08/16/2026Q01415322-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026Q01415322-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01415322-S2Open ↗
08/16/2026Q01415322-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/16/2026Q01415322-I1Open ↗