← Back
Two stories - detached, small or mid-size
217-12 PECK AVENUE
QUEENS · BIN 4164790
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
1,800 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,168 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction16p · 1 filing · 18 docs
Floor 1Under Construction20p · 1 filing · 18 docs
CellarUnder Construction20p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JUST CONSULTING ENGINEERING208/20/2026
GERALD CALIENDO ARCHITECTS407/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN R US INCGeneral Contractor307/30/2026
FOUR POINTS P & H CORPPlumbing108/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616508/20/2026
Building Lifecycle
All (72)Filed (6)Permit Issued (4)Objection (36)Special Inspection (26)
08/20/2026
Filed — Alteration CO
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01342346-P2
08/20/2026
Permit issued — Plumbing
Q01342346-S2-PL
07/29/2026
Permit issued — Structural
Q01342346-S3-GC-CX
07/28/2026
Filed — Alteration CO
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01342346-P1
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Permanent certificate
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Electric vehicle service equipment requirements
SHAHRIAR QUAYYUM
07/23/2026
Permit issued — General Construction
Q01342346-I1-GC
07/17/2026
Permit issued — Construction Fence
Q01342346-S1-FN
04/24/2026
Objection resolved — Addressed
04/14/2026
Objection raised — Energy
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
04/03/2026
Special inspection requirement — Wood – Seismic Resistance
SHAHRIAR QUAYYUM
04/03/2026
Special inspection requirement — Structural Wood Frame
SHAHRIAR QUAYYUM
03/17/2026
Objection resolved — Addressed
02/19/2026
Objection raised — Structural
02/19/2026
Objection raised — Structural
02/19/2026
Objection raised — Structural
02/19/2026
Objection raised — Structural
02/19/2026
Objection raised — Cost
02/19/2026
Objection raised — Structural
02/19/2026
Objection raised — Structural
02/19/2026
Objection raised — Structural
02/13/2026
Objection raised — Energy
01/30/2026
Filed — Alteration CO
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01342346-S3
01/28/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
01/28/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
01/27/2026
Objection raised — Plumbing
01/27/2026
Objection raised — Cost
01/27/2026
Objection raised — Plumbing
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/26/2026
Objection raised — Scope
01/26/2026
Objection raised — Admin
01/26/2026
Objection raised — Zoning
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP08/20/2026
DOB NOWStructuralPermit IssuedDESIGN R US INC07/29/2026
DOB NOWGeneral ConstructionPermit IssuedDESIGN R US INC07/23/2026
DOB NOWConstruction FencePermit IssuedDESIGN R US INC07/17/2026
BISOTISSUEDLAL CONSTRUCTION03/11/2005
BISOTISSUEDN/A06/11/1997
1 project · most recent 08/20/2026
Water/Sanitary
FiledStatusContractorScope
08/20/2026Permit IssuedFOUR POINTS P & H CORPWater/Sanitary
1 project · most recent 08/20/2026
Steel Wood
FiledStatusContractorScope
08/20/2026Permit IssuedFOUR POINTS P & H CORPSteel, Wood
1 project · most recent 08/20/2026
Fence
FiledStatusContractorScope
08/20/2026Permit IssuedFOUR POINTS P & H CORPFence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/28/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
07/28/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/28/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
07/28/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
07/28/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
07/28/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
07/28/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
07/28/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
07/28/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
07/28/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
07/28/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
07/28/2026Permanent certificateSHAHRIAR QUAYYUMenergy_progress
07/28/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
07/28/2026Electric vehicle service equipment requirementsSHAHRIAR QUAYYUMenergy_progress
04/03/2026Wood – Seismic ResistanceSHAHRIAR QUAYYUMspecial
04/03/2026Structural Wood FrameSHAHRIAR QUAYYUMprogress
01/28/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
01/28/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
01/28/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
01/09/2026Footing and FoundationSHAHRIAR QUAYYUMprogress
01/09/2026FinalSHAHRIAR QUAYYUMprogress
01/09/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
01/09/2026Structural Stability – Alterations of existing buildingsSHAHRIAR QUAYYUMspecial
01/09/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
Latest 25 of 26.
▾Documents — 23 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01342346-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01342346-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026Q01342346-S2Open ↗
08/29/2026Q01342346-P1Open ↗
08/24/2026Q01342346-S3Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026Q01342346-S2Open ↗
08/29/2026Q01342346-P1Open ↗
08/24/2026Q01342346-S3Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026Q01342346-P2Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/22/2026Q01342346-P2Open ↗
08/13/2026Q01342346-I1Open ↗
08/13/2026Q01342346-S3Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026Q01342346-P2Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01342346-S3Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/22/2026Q01342346-P2Open ↗
08/13/2026Q01342346-I1Open ↗
08/13/2026Q01342346-S3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/22/2026Q01342346-P2Open ↗
08/13/2026Q01342346-S3Open ↗
08/13/2026Q01342346-I1Open ↗
▸DOB NOWPlot Diagram3
08/22/2026Q01342346-P2Open ↗
08/13/2026Q01342346-S3Open ↗
08/13/2026Q01342346-I1Open ↗