← Back
Two stories - detached, small or mid-size
82-10 214 STREET
QUEENS · Oakland Gardens-Hollis Hills · BIN 4165114
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R2AZoning
1,632 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,000 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 10 docs
Cellar2p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS308/22/2026
Building Lifecycle
All (49)Filed (3)Objection (20)Special Inspection (26)
08/22/2026
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, AS PER C OF O NUMBER COQ 63029(NB5309-49) TO ERECT INTERIOR RENOVATIONS PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS
Q01429625-S2
08/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SHAHRIAR QUAYYUM
08/22/2026
Special inspection requirement — Energy Code Compliance Inspections
08/13/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Structural
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
07/30/2026
Objection resolved — Addressed
07/28/2026
Objection raised — Other
07/20/2026
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, AS PER C OF O NUMBER COQ 63029(NB5309-49) TO ERECT INTERIOR RENOVATIONS PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS
Q01429625-S1
07/20/2026
Filed — Alteration
HEREWITH FILE ALTERATION TO DO A EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING, AS PER C OF O NUMBER COQ 63029(NB5309-49) TO ERECT INTERIOR RENOVATIONS PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS
Q01429625-I1
07/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/11/2026
Special inspection requirement — Mechanical Systems
07/11/2026
Special inspection requirement — Concrete - Cast-In-Place
07/11/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/11/2026
Special inspection requirement — Heating Systems
07/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/11/2026
Special inspection requirement — Final
07/11/2026
Special inspection requirement — Footing and Foundation
07/11/2026
Special inspection requirement — Energy Code Compliance Inspections
07/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/11/2026
Special inspection requirement — Structural Wood Frame
07/11/2026
Special inspection requirement — Air barrier - visual inspection
07/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/11/2026
Special inspection requirement — Fenestration air leakage
07/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/11/2026
Special inspection requirement — Fenestration areas
07/11/2026
Special inspection requirement — Interior lighting power
07/11/2026
Special inspection requirement — Lighting controls
07/11/2026
Special inspection requirement — Permanent certificate
07/11/2026
Special inspection requirement — Metering
Nothing on file for this building.
1 project · most recent 08/22/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/22/2026——Air Conditioning Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
Heating
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
Ventilation
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×3
1 project · most recent 08/22/2026
Wood
FiledStatusContractorScope
08/22/2026——Wood
1 project · most recent 08/22/2026
Fence
FiledStatusContractorScope
08/22/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/22/2026Fire-Resistant Penetrations and Joints—special
08/22/2026Subsurface Investigations (Borings/Test Pits)SHAHRIAR QUAYYUMspecial
08/22/2026Energy Code Compliance Inspections—progress
07/11/2026Structural Stability – Alterations of existing buildings—special
07/11/2026Mechanical Systems—special
07/11/2026Concrete - Cast-In-Place—special
07/11/2026Exterior Insulation and Finish Systems (EIFS)—special
07/11/2026Fire-Resistant Penetrations and Joints—special
07/11/2026Heating Systems—special
07/11/2026Subsurface Investigations (Borings/Test Pits)—special
07/11/2026Final—progress
07/11/2026Footing and Foundation—progress
07/11/2026Energy Code Compliance Inspections—progress
07/11/2026Fire-Resistance Rated Construction—progress
07/11/2026Structural Wood Frame—progress
07/11/2026Air barrier - visual inspection—energy_progress
07/11/2026HVAC-R and service water heating equipment—energy_progress
07/11/2026HVAC-R and service water heating system controls—energy_progress
07/11/2026Fenestration air leakage—energy_progress
07/11/2026Fenestration and door U-factor and product ratings—energy_progress
07/11/2026HVAC-R and service water piping design and insulation—energy_progress
07/11/2026Fenestration areas—energy_progress
07/11/2026Interior lighting power—energy_progress
07/11/2026Lighting controls—energy_progress
07/11/2026Permanent certificate—energy_progress
Latest 25 of 26.
▾Documents — 1 on file (BIS + DOB NOW)
▸Seals & Professional Certifications1
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01429625-S2Open ↗