← Back
Two stories - detached, small or mid-size
82-32 215 STREET
QUEENS · BIN 4165140
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R2AZoning
2,300 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,500 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 7 docs
Floor 2Under Construction7p · 1 filing · 20 docs
Floor 1Under Construction4p · 1 filing · 20 docs
CellarUnder Construction4p · 1 filing · 20 docs
1 job · most recent 10/03/2024
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/03/2024Signed-offJGR GROUP INCHeating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-FS06NA 400,000 BTU · Split System ×3
Heating
Mitsubishi Electric MSZ-FS06NA 400,000 BTU ×3
Ventilation
Mitsubishi Electric MXZ-4C36NA2 400,000 BTU · Heat Pump Outdoor ×3
2 jobs · most recent 11/23/2025
General Wiring
FiledStatusContractorScope
11/23/2025Permit IssuedDAVRY ELECTRIC INCGeneral Wiring
10/30/2025CompleteVILLAGE ELECTL CONTRS INC—
1 job · most recent 10/03/2024
Wood
FiledStatusContractorScope
10/03/2024Permit IssuedGOLDS PLUMBING CORPWood
Building Lifecycle
All (76)Filed (4)Permit Issued (5)Signed Off (1)Violation (2)Inspection (2)Objection (32)Special Inspection (30)
07/17/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2026
Violation issued (ECB, open)
Construction
06/11/2026
Violation issued (ECB, open)
Construction
01/27/2026
Permit issued — Solar
Q01319042-I1-SL
12/11/2025
Permit issued — Plumbing
Q01095232-S1-PL
12/08/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01319042-I1
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
11/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
11/13/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
11/13/2025
Special inspection requirement — Final
RICHARD MUESCH JR.
11/13/2025
Special inspection requirement — Air barrier - visual inspection
William Alicea
07/11/2025
Signed off — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION IN THE REAR OF AN EXSITING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOIR WORK AND TO OBTAIN A LETTER OF COMPLETEION. NO CHANGE TO USE OCCUPANCY OR EGRESS. PLUMBING WORK FILED SUBSEQUENTLY.
Q01095232-I1
11/20/2024
Permit issued — Foundation
Q01095232-I1-GC-CX
10/10/2024
Permit issued — Earth Work
Q01095232-I1-GC-CX
10/03/2024
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION IN THE REAR OF AN EXSITING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOIR WORK AND TO OBTAIN A LETTER OF COMPLETEION. NO CHANGE TO USE OCCUPANCY OR EGRESS. PLUMBING WORK FILED SUBSEQUENTLY.
Q01095232-S1
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
10/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
10/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
10/03/2024
Special inspection requirement — Permanent certificate
Younes Abouyaala
10/03/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
10/02/2024
Objection raised — Other
10/02/2024
Objection resolved — Addressed
09/27/2024
Objection resolved — Addressed
09/27/2024
Objection resolved — Addressed
09/27/2024
Objection resolved — Addressed
09/27/2024
Objection resolved — Addressed
09/27/2024
Objection resolved — Addressed
09/25/2024
Objection raised — Other
09/25/2024
Objection raised — Other
09/25/2024
Objection raised — Other
09/25/2024
Objection raised — Other
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
09/17/2024
Objection resolved — Addressed
09/13/2024
Objection resolved — Addressed
09/13/2024
Objection resolved — Addressed
09/13/2024
Objection resolved — Addressed
09/13/2024
Objection resolved — Addressed
08/28/2024
Objection raised — Other
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Other
08/28/2024
Objection raised — Structural
08/28/2024
Objection raised — Energy
08/28/2024
Objection raised — Zoning
08/28/2024
Objection raised — Other
08/28/2024
Objection raised — Other
08/16/2024
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO A HORIZONTAL EXTENSION IN THE REAR OF AN EXSITING TWO STORY ONE FAMILY DWELLING, TO DO INTERIOIR WORK AND TO OBTAIN A LETTER OF COMPLETEION. NO CHANGE TO USE OCCUPANCY OR EGRESS. PLUMBING WORK FILED SUBSEQUENTLY.
Q01095232-I1
08/12/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
08/12/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
08/12/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
08/12/2024
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
Latest 60 of 76 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KS RENOVATION GROUP803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/26/2024$1.4M—Private party → Private party$609/sf building
03/20/2014$748K—— → —$325/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RMM DESIGN STUDIO112/08/2025
AA BLDG & INSP SVC LLC310/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EBC CONSULTING203/21/2026
DMCONSULTING6860603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JGR GROUP INCGeneral Contractor603/21/2026
KC EXPEDITING INCGeneral Contractor104/09/2026
HUDSON PLMBING & MCH, LLCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323112/08/2025
AA BUILDING & INSPECTION1519210/03/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedKC EXPEDITING INC01/27/2026
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC12/11/2025
DOB NOWFoundationSigned-offJGR GROUP11/20/2024
DOB NOWEarth WorkSigned-offJGR GROUP10/10/2024
DOB NOWConstruction FencePermit IssuedJGR GROUP08/07/2024
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/17/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
11/13/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
11/13/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
11/13/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
11/13/2025FinalRICHARD MUESCH JR.progress
11/13/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
10/03/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/03/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/03/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
10/03/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
10/03/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
10/03/2024Permanent certificateYounes Abouyaalaenergy_progress
10/03/2024Maintenance informationYounes Abouyaalaenergy_progress
08/12/2024Fenestration air leakageYounes Abouyaalaenergy_progress
08/12/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/12/2024Interior lighting powerYounes Abouyaalaenergy_progress
08/12/2024Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
08/12/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/12/2024Lighting controlsYounes Abouyaalaenergy_progress
08/12/2024Air barrier continuity plan testingYounes Abouyaalaenergy_progress
08/12/2024Maintenance informationYounes Abouyaalaenergy_progress
08/12/2024Permanent certificateYounes Abouyaalaenergy_progress
08/12/2024Fenestration areasYounes Abouyaalaenergy_progress
08/12/2024Mechanical SystemsYounes Abouyaalaspecial
08/12/2024Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
08/12/2024Concrete - Cast-In-PlaceYounes Abouyaalaspecial
Latest 25 of 33.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026Q01088989-I1Request digital key ↗
08/21/2026Q01095232-I1Request digital key ↗
08/21/2026Q01095232-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q01095232-S1Open ↗
08/13/2026Q01095232-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01095232-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q01095232-I1Open ↗
09/01/2026Q01095232-I1Open ↗
09/01/2026Q01095232-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q01095232-I1Open ↗
09/01/2026Q01095232-I1Open ↗
09/01/2026Q01095232-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026Q01088989-I1Open ↗
08/18/2026Q01319042-I1Open ↗
08/13/2026Q01095232-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026Q01319042-I1Open ↗
08/13/2026Q01095232-I1Open ↗
08/13/2026Q01095232-S1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q01095232-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01095232-I1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026Q01095232-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01095232-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01095232-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01095232-I1Open ↗