← Back
Large suburban residence
113 WARWICK AVENUE
QUEENS · BIN 4168057
💬 Discuss this project
1930Year Built
2.5Stories
A3Building Class
R1-2Zoning
2,924 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 8,000 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction34p · 1 filing · 20 docs
Floor 1Under Construction37p · 1 filing · 20 docs
CellarUnder Construction35p · 1 filing · 20 docs
1 job · most recent 01/02/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/02/2026Permit IssuedPAL-MAR PLBG & HTG INCGas, Storm, Water/Sanitary
1 job · most recent 02/11/2025
General Wiring
FiledStatusContractorScope
02/11/2025Permit IssuedPERFECTION ELECTRIC, LLCGeneral Wiring
1 job · most recent 01/02/2026
FiledStatusContractorScope
01/02/2026Permit IssuedHEIRLOOM WOODWORKING INC3 scope_items
1 job · most recent 03/31/2022
Fence
FiledStatusContractorScope
03/31/2022Signed-offHEIRLOOM WOODWORKING INCFence
Building Lifecycle
All (74)Filed (6)Permit Issued (8)Signed Off (1)Violation (2)Inspection (4)Objection (23)Special Inspection (30)
07/27/2026
Signed off — Alteration
ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY IN CONJUNCTION WITH ALT Q00709160. NO CHANGE TO THE USE, EGRESS, AND OCCUPANCY
Q00709864-I1
02/13/2026
Permit issued — General Construction
Q00709160-I1-GC
02/10/2026
Objection raised — Admin
01/02/2026
Filed — Alteration CO
NEW VERTICAL & HORIZONTAL ENLARGEMENT TO EXISTING 2 1/2 STORY 1-FAMILY BUILDING. INTERIOR GUT RENOVATION AT CELLAR, FIRST, SECOND AND ATTIC FLOOR. NEW PARTITIONS, WINDOWS & FINISHES, HVAC AS PER PLANS
Q00709160-P2
10/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ELIAS RASABI
09/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
09/12/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
08/18/2025
Filed — Alteration CO
NEW VERTICAL & HORIZONTAL ENLARGEMENT TO EXISTING 2 1/2 STORY 1-FAMILY BUILDING. INTERIOR GUT RENOVATION AT CELLAR, FIRST, SECOND AND ATTIC FLOOR. NEW PARTITIONS, WINDOWS & FINISHES, HVAC AS PER PLANS
Q00709160-P3
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
08/15/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
08/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ELIAS RASABI
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
06/16/2025
Permit issued — Construction Fence
Q00709864-I1-FN
05/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2025
Permit issued — Plumbing
Q00709160-S1-PL
01/29/2025
Permit issued — Foundation
Q00709160-I1-FO
01/15/2025
Permit issued — Foundation
Q00709160-I1-GC
12/10/2024
Special inspection requirement — Final
ELIAS RASABI
12/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
12/10/2024
Special inspection requirement — Footing and Foundation
ELIAS RASABI
12/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
12/10/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
12/10/2024
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
12/10/2024
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
12/10/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
12/10/2024
Special inspection requirement — Structural Steel - Details
ELIAS RASABI
12/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ELIAS RASABI
11/22/2024
Filed — Alteration CO
NEW VERTICAL & HORIZONTAL ENLARGEMENT TO EXISTING 2 1/2 STORY 1-FAMILY BUILDING. INTERIOR GUT RENOVATION AT CELLAR, FIRST, SECOND AND ATTIC FLOOR. NEW PARTITIONS, WINDOWS & FINISHES, HVAC AS PER PLANS
Q00709160-P1
11/08/2024
Special inspection requirement — Final
ELIAS RASABI
11/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
11/08/2024
Special inspection requirement — Footing and Foundation
ELIAS RASABI
11/08/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
11/08/2024
Special inspection requirement — Subgrade Inspections
ELIAS RASABI
11/08/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ELIAS RASABI
11/08/2024
Special inspection requirement — Structural Steel - Details
ELIAS RASABI
11/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
11/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
11/08/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ELIAS RASABI
11/08/2024
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
09/18/2024
Violation issued (ECB, closed)
Unknown
09/18/2024
Violation issued (ECB, closed)
Unknown
06/28/2024
Permit issued — Construction Fence
Q00709864-I1-FN
06/27/2024
Permit issued — General Construction
Q00709160-I1-GC
06/27/2024
Permit issued — General Construction
Q00709160-I1-FO
03/24/2023
Objection resolved — Addressed
03/16/2023
Objection resolved — Addressed
03/15/2023
Objection resolved — Addressed
03/15/2023
Objection resolved — Addressed
03/15/2023
Objection resolved — Addressed
03/15/2023
Objection resolved — Addressed
03/15/2023
Objection resolved — Addressed
03/15/2023
Objection resolved — Addressed
03/15/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Energy
03/10/2023
Objection raised — Structural
Latest 60 of 74 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/20/2020$1.3M—Private party → Private party$443/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C601/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HEIRLOOM WOODWORKING INCGeneral Contractor1207/08/2026
PAL-MAR PLBG & HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416501/02/2026
BRIAN E. FLYNN, PE, PC2837208/18/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHEIRLOOM WOODWORKING INC02/13/2026
DOB NOWConstruction FenceSigned-offHEIRLOOM WOODWORKING INC06/16/2025
DOB NOWPlumbingPermit IssuedPAL-MAR PLBG & HTG INC04/03/2025
DOB NOWFoundationPermit IssuedHEIRLOOM WOODWORKING INC01/29/2025
DOB NOWFoundationPermit IssuedHEIRLOOM WOODWORKING INC01/15/2025
DOB NOWConstruction FenceSigned-offHEIRLOOM WOODWORKING INC06/28/2024
DOB NOWGeneral ConstructionPermit IssuedHEIRLOOM WOODWORKING INC06/27/2024
DOB NOWGeneral ConstructionPermit IssuedHEIRLOOM WOODWORKING INC06/27/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
09/12/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationELIAS RASABIspecial
09/12/2025HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
09/12/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
09/12/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
08/15/2025HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
08/15/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
08/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationELIAS RASABIspecial
08/15/2025Fire-Resistant Penetrations and JointsELIAS RASABIspecial
12/10/2024FinalELIAS RASABIprogress
12/10/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
12/10/2024Footing and FoundationELIAS RASABIprogress
12/10/2024Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
12/10/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
12/10/2024Excavations - Sheeting, Shoring, and BracingELIAS RASABIspecial
12/10/2024Concrete - Cast-In-PlaceELIAS RASABIspecial
12/10/2024Subgrade InspectionsELIAS RASABIspecial
12/10/2024Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
12/10/2024Structural Steel - DetailsELIAS RASABIspecial
12/10/2024Structural Steel - High Strength BoltingELIAS RASABIspecial
11/08/2024FinalELIAS RASABIprogress
11/08/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
11/08/2024Footing and FoundationELIAS RASABIprogress
11/08/2024Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
11/08/2024Subgrade InspectionsELIAS RASABIspecial
11/08/2024Structural Steel - High Strength BoltingELIAS RASABIspecial
Latest 25 of 30.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00709864-I1Request digital key ↗
08/17/2026Q00709160-P1Request digital key ↗
08/17/2026Q00709160-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/13/2026Q00709160-S1Open ↗
08/13/2026Q00709160-I1Open ↗
08/13/2026Q00709160-P1Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00709160-P2Open ↗
08/13/2026Q00709160-P1Open ↗
08/13/2026Q00709160-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00709160-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00709160-S1Open ↗
09/01/2026Q00709160-S1Open ↗
08/26/2026Q00709160-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q00709160-P1Open ↗
08/17/2026Q00709160-P3Open ↗
08/17/2026Q00709160-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00709160-S1Open ↗
08/26/2026Q00709160-P3Open ↗
08/25/2026Q00709160-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/17/2026Q00709160-P1Open ↗
08/15/2026Q00709160-P2Open ↗
08/14/2026Q00709160-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026Q00709160-P3Open ↗
08/17/2026Q00709160-P1Open ↗
08/17/2026Q00709160-S1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00709160-I1Open ↗
08/13/2026Q00709160-P2Open ↗
08/13/2026Q00709160-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00709160-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00709160-I1Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/13/2026Q00709160-I1Open ↗
08/13/2026Q00709160-P1Open ↗
08/13/2026Q00709160-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00709160-P2Open ↗
08/13/2026Q00709160-P1Open ↗
08/13/2026Q00709160-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00709160-P2Open ↗
08/13/2026Q00709160-I1Open ↗
08/13/2026Q00709160-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026Q00709160-P1Open ↗
08/15/2026Q00709160-P2Open ↗
08/14/2026Q00709160-I1Open ↗