← Back
Two stories - detached, small or mid-size
38-14 LITTLE NECK PARKWAY
QUEENS · BIN 4169871
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R2AZoning
2,090 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,704 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 29p · 2 filings · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT206/11/2025
ZHENG & ASSOCIATES LLC604/15/2025
ADEL SAGEER ARCHITECT, PLLC109/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2022 A N J CONSTRUCTION *General Contractor307/08/2026
AMERGY SOLAR INCGeneral Contractor303/21/2026
PLUMBING NYC INCPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802206/11/2025
ZHENG & ASSOCIATES LLC7330404/15/2025
TRIANGLE INSPECTION & TES7495204/14/2025
Building Lifecycle
All (74)Filed (9)Permit Issued (6)Signed Off (6)Violation (1)Inspection (12)Objection (10)Special Inspection (30)
06/26/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL EXTENSON FOR EXISTINGN ONE FAMILY DWELLING UNIT. OBTAIN A NEW C. OF O.
Q00877416-I1
05/11/2026
Signed off — Alteration
PLUMBING WORK FOR EXISTING ONE FAMILY DWELLING AND CAR GARAGE. NO CHANGE IN USE, EGRESS AND OCCUPANCY
Q00913674-I1
05/08/2026
Signed off — Alteration
PLUMBING WORK FOR EXISTING ONE FAMILY DWELLING AND CAR GARAGE. NO CHANGE IN USE, EGRESS AND OCCUPANCY
Q00913674-S1
05/08/2026
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00913684-I1
04/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Signed off — Alteration
Q01107485-I1
03/30/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/28/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/02/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/17/2025
Permit issued — Curb Cut
Q01107485-I1-CC
09/04/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Jinfar Liu
06/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
06/17/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jinfar Liu
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/17/2025
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
Jinfar Liu
06/17/2025
Special inspection requirement — Final
Jinfar Liu
06/17/2025
Special inspection requirement — Structural Steel - Details
Jinfar Liu
06/17/2025
Special inspection requirement — Structural Wood Frame
Jinfar Liu
06/17/2025
Special inspection requirement — Lowest Floor Elevation
Jinfar Liu
06/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
06/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
06/17/2025
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
06/17/2025
Special inspection requirement — Air barrier — testing
Jinfar Liu
06/17/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
06/17/2025
Special inspection requirement — Electric vehicle service equipment requirements
Jinfar Liu
06/17/2025
Special inspection requirement — Fenestration areas
Jinfar Liu
06/17/2025
Special inspection requirement — Insulation placement and R values
Jinfar Liu
06/17/2025
Special inspection requirement — Fenestration air leakage
Jinfar Liu
06/17/2025
Special inspection requirement — Air barrier - visual inspection
Jinfar Liu
06/17/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
06/17/2025
Special inspection requirement — Permanent certificate
Jinfar Liu
06/17/2025
Special inspection requirement — Maintenance information
Jinfar Liu
06/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Jinfar Liu
06/17/2025
Special inspection requirement — Metering
Jinfar Liu
06/17/2025
Special inspection requirement — Footing and Foundation
Jinfar Liu
06/13/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01153376-I1
06/11/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01153376-P1
06/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chun Feng
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
06/11/2025
Special inspection requirement — Final
Chun Feng
06/11/2025
Special inspection requirement — Air barrier - visual inspection
Chun Feng
04/15/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HORIZONTAL EXTENSON FOR EXISTINGN ONE FAMILY DWELLING UNIT. OBTAIN A NEW C. OF O.
Q00877416-P1
04/14/2025
Filed — Alteration
PLUMBING WORK FOR EXISTING ONE FAMILY DWELLING AND CAR GARAGE. NO CHANGE IN USE, EGRESS AND OCCUPANCY
Q00913674-P2
03/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/23/2025
Permit issued — Plumbing
Q00913674-S1-PL
12/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/17/2024
Permit issued — Solar
Q01153376-I1-SL
12/16/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01153376-I1
12/16/2024
Permit issued — Plumbing
Q00913674-I1-PL
10/21/2024
Permit issued — General Construction
Q00877416-I1-GC-CX
10/10/2024
Filed — Alteration
PLUMBING WORK FOR EXISTING ONE FAMILY DWELLING AND CAR GARAGE. NO CHANGE IN USE, EGRESS AND OCCUPANCY
Q00913674-S1
09/07/2024
Filed — Alteration
Q01107485-I1
06/14/2024
Permit issued — Construction Fence
Q00913684-I1-FN
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-off2022 A N J CONSTRUCTION09/17/2025
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC01/23/2025
DOB NOWSolarSigned-offAMERGY SOLAR INC12/17/2024
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC12/16/2024
DOB NOWGeneral ConstructionPermit Issued2022 A N J CONSTRUCTION10/21/2024
DOB NOWConstruction FenceSigned-off2022 A N J CONSTRUCTION06/14/2024
BISOTISSUEDN/A05/02/1996
1 project · most recent 04/14/2025
Storm Water/Sanitary
FiledStatusContractorScope
04/14/2025Signed-offPLUMBING NYC INCStorm, Water/Sanitary
2 projects · most recent 12/11/2024
General Wiring
FiledStatusContractorScope
12/11/2024CompleteKJK ELECTRIC INCGeneral Wiring
12/11/2024CompleteI.P. ELECTRIC INC—
1 project · most recent 04/15/2025
Wood
FiledStatusContractorScope
04/15/2025Permit Issued2022 A N J CONSTRUCTION *Wood
1 project · most recent 04/10/2024
Fence
FiledStatusContractorScope
04/10/2024Signed-off2022 A N J CONSTRUCTION *Fence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/28/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/02/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/04/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
06/17/2025Structural Stability – Alterations of existing buildingsJinfar Liuspecial
06/17/2025Structural Steel - DetailsJinfar Liuspecial
06/17/2025Structural Wood FrameJinfar Liuprogress
06/17/2025Lowest Floor ElevationJinfar Liuprogress
06/17/2025Fire-Resistance Rated ConstructionJinfar Liuprogress
06/17/2025Energy Code Compliance InspectionsJinfar Liuprogress
06/17/2025Footing and FoundationJinfar Liuprogress
06/17/2025FinalJinfar Liuprogress
06/17/2025Air barrier — testing Jinfar Liuenergy_progress
06/17/2025Electric vehicle service equipment requirementsJinfar Liuenergy_progress
06/17/2025Fenestration areasJinfar Liuenergy_progress
06/17/2025Insulation placement and R valuesJinfar Liuenergy_progress
06/17/2025Fenestration air leakageJinfar Liuenergy_progress
06/17/2025Air barrier - visual inspectionJinfar Liuenergy_progress
06/17/2025Interior lighting powerJinfar Liuenergy_progress
06/17/2025Permanent certificateJinfar Liuenergy_progress
06/17/2025Maintenance informationJinfar Liuenergy_progress
06/17/2025Fenestration and door U-factor and product ratingsJinfar Liuenergy_progress
06/17/2025MeteringJinfar Liuenergy_progress
06/17/2025Wood – Metal-Plate-Connected TrussesJinfar Liuspecial
06/17/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJinfar Liuspecial
06/17/2025Concrete - Cast-In-PlaceJinfar Liuspecial
06/17/2025Excavations - Sheeting, Shoring, and BracingJinfar Liuspecial
06/17/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
06/17/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 69.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026Q00913684-I1Request digital key ↗
08/21/2026Q01107485-I1Request digital key ↗
08/21/2026Q00913674-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
04/18/2024440817154Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00877416-I1Open ↗
08/13/2026Q00877416-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026Q00877416-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q00913674-P2Open ↗
09/01/2026Q00913674-P2Open ↗
08/29/2026Q00877416-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00913674-P2Open ↗
09/01/2026Q00913674-P2Open ↗
08/29/2026Q00877416-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026Q00913674-I1Open ↗
08/21/2026Q00913674-S1Open ↗
08/21/2026Q00913674-P2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/18/2024440817154Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00877416-P1Open ↗
08/13/2026Q00877416-I1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST2
06/03/2024440817154Open ↗
04/18/2024440817154Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00877416-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00877416-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00877416-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q00913674-P2Open ↗
08/21/2026Q00913674-S1Open ↗
08/21/2026Q00913674-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
09/25/2024440817154Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00877416-P1Open ↗
08/13/2026Q00877416-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/20/2026Q00877416-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00877416-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
06/03/2024440817154Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
04/18/2024440817154Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01153376-I1Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
04/18/2024440817154Open ↗
▸BISADDITIONAL INFORMATION1
06/03/2024440817154Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/03/2024440817154Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/13/2026Q00877416-I1Open ↗
08/13/2026Q00877416-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00877416-P1Open ↗
08/13/2026Q00877416-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026Q00877416-I1Open ↗
08/20/2026Q00877416-P1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/25/2024440817154Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
04/18/2024440817154Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP1
04/18/2024440817154Open ↗
▸DOB NOWFinal Survey1
08/20/2026Q00877416-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00877416-I1Open ↗