← Back
Cape Cod
53-21 240 STREET
QUEENS · BIN 4170047
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R1-2Zoning
—Gross Floor Area
1Units
Cape Cod · Owner of record: BATTIGGI ASSET MANAGEMENT TR NKA THE SUR VIVORS TR · 0.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 1 filing · 20 docs
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction20p · 1 filing · 20 docs
CellarUnder Construction10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HY DESIGN DEVELOPMENT L609/21/2026
BATTIGGI ASSET MANAGEMENT TR NKA THE SUR VIVORS TR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.306/18/2026
MEI ARCHITECT PLLC103/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HY DESIGN & DEVELOPMENT LLC.General Contractor409/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129306/18/2026
Building Lifecycle
All (31)Objection (1)Special Inspection (30)
06/08/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
06/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
06/08/2026
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
06/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
05/12/2026
Special inspection requirement — Final
MEHDI GHAZI
05/12/2026
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
04/22/2026
Objection raised — Scope
03/20/2026
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
03/20/2026
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
03/20/2026
Special inspection requirement — Maintenance information
MEHDI GHAZI
03/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
03/20/2026
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
03/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
03/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/20/2026
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
03/20/2026
Special inspection requirement — Fenestration areas
MEHDI GHAZI
03/20/2026
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
03/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
03/20/2026
Special inspection requirement — Interior lighting power
MEHDI GHAZI
03/20/2026
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
03/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
03/20/2026
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
03/20/2026
Special inspection requirement — Permanent certificate
MEHDI GHAZI
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
03/20/2026
Special inspection requirement — Heating Systems
MEHDI GHAZI
03/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
03/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
03/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
03/19/2026
Special inspection requirement — Final
MEHDI GHAZI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedHY DESIGN & DEVELOPMENT LLC.09/17/2026
DOB NOWEarth WorkPermit IssuedHY DESIGN & DEVELOPMENT LLC.08/10/2026
DOB NOWGeneral ConstructionPermit IssuedHY DESIGN & DEVELOPMENT LLC.08/03/2026
DOB NOWConstruction FencePermit IssuedHY DESIGN & DEVELOPMENT LLC.06/09/2026
BISOTISSUEDN/A01/26/1998
BISOTISSUEDN/A01/26/1998
1 project · most recent 06/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/18/2026Permit IssuedHY DESIGN & DEVELOPMENT LHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NL 60,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 08/12/2026
General Wiring
FiledStatusContractorScope
08/12/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
1 project · most recent 06/18/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/18/2026Permit IssuedHY DESIGN & DEVELOPMENT LSteel, Concrete, Masonry, Wood
1 project · most recent 05/29/2026
Fence
FiledStatusContractorScope
05/29/2026Permit IssuedHY DESIGN & DEVELOPMENT LFence
Nothing on file for this building.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01375009-S1Request digital key ↗
08/17/2026Q01375009-I1Request digital key ↗
08/17/2026Q01375009-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01375009-I1Open ↗
08/13/2026Q01375009-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01375009-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01375009-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWSpecial Inspector Seal & Signature4
09/26/2026Q01375009-S1Open ↗
09/26/2026Q01375009-S1Open ↗
08/23/2026Q01375009-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01375009-I1Open ↗
08/17/2026Q01375009-S2Open ↗
08/17/2026Q01375009-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/26/2026Q01375009-S1Open ↗
08/23/2026Q01375009-I1Open ↗
08/23/2026Q01375009-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01375009-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q01375009-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026Q01375009-S2Open ↗
08/17/2026Q01375009-S1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01375009-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01375009-S1Open ↗
08/17/2026Q01375009-I1Open ↗
▸DOB NOWSOIL REPORT2
08/17/2026Q01375009-S1Open ↗
08/13/2026Q01375009-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01375009-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01375009-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01375009-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026Q01375009-S1Open ↗