Two stories - detached, small or mid-size
45-21 ZION STREET
QUEENS · BIN 4170686
💬 Discuss this project
1920Year Built
2.75Stories
A1Building Class
R2AZoning
1,616 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 6,300 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2017$815K—Private party → Private party$504/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT305/19/2025
AGT ARCHITECTURE P.C.201/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANG ARCHITECT503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOME STYLE IMPROVEMENTS *General Contractor303/21/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513505/19/2025
TRIANGLE INSPECTION & TES7495201/13/2025
Building Lifecycle
All (56)Filed (5)Permit Issued (2)Signed Off (2)Violation (3)Inspection (6)Objection (8)Special Inspection (30)
08/14/2025
Signed off — Alteration
PROPOSED A HORIZONTAL EXTENSION TO AN EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00793716-I1
08/14/2025
Signed off — Alteration
FILED PLUMBING WORK FOR A 1-FAMILY HOUSE EXTENSION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q08009605-I1
08/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/03/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
07/03/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
07/03/2025
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
07/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
07/03/2025
Special inspection requirement — Final
DEZHANG FANG
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
07/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
07/03/2025
Special inspection requirement — Footing and Foundation
DEZHANG FANG
07/03/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
07/03/2025
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
07/03/2025
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
07/03/2025
Special inspection requirement — Fenestration areas
DEZHANG FANG
07/03/2025
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
07/03/2025
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
07/03/2025
Special inspection requirement — Interior lighting power
DEZHANG FANG
07/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
06/09/2025
Objection resolved — Addressed
06/04/2025
Objection raised — Cost
05/21/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Filed — Alteration
PROPOSED A HORIZONTAL EXTENSION TO AN EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00793716-P2
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
05/16/2025
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
05/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
05/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DEZHANG FANG
05/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
05/16/2025
Special inspection requirement — Final
DEZHANG FANG
05/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
05/16/2025
Special inspection requirement — Footing and Foundation
DEZHANG FANG
05/16/2025
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
05/16/2025
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
05/16/2025
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
05/16/2025
Special inspection requirement — Interior lighting power
DEZHANG FANG
05/16/2025
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
01/22/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2025
Filed — Alteration
FILED PLUMBING WORK FOR A 1-FAMILY HOUSE EXTENSION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q08009605-P1
01/08/2025
Objection resolved — Addressed
01/08/2025
Objection resolved — Addressed
01/02/2025
Objection raised — Other
01/02/2025
Objection raised — Energy
12/18/2024
Filed — Alteration
PROPOSED A HORIZONTAL EXTENSION TO AN EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00793716-P1
09/20/2024
Permit issued — Plumbing
Q08009605-I1-PL
09/05/2024
Permit issued — General Construction
Q00793716-I1-GC-CX
11/09/2022
Filed — Alteration
FILED PLUMBING WORK FOR A 1-FAMILY HOUSE EXTENSION. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q08009605-I1
08/23/2022
Objection raised — Admin
08/23/2022
Objection resolved — Addressed
08/16/2022
Filed — Alteration
PROPOSED A HORIZONTAL EXTENSION TO AN EXISTING 1-FAMILY HOUSE. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY
Q00793716-I1
11/08/2019
Violation issued (HPD, closed)
I
11/01/2018
Violation issued (HPD, closed)
I
01/12/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC09/20/2024
DOB NOWGeneral ConstructionSigned-offHOME STYLE IMPROVEMENTS *09/05/2024
2 projects · most recent 10/07/2024
General Wiring
FiledStatusContractorScope
10/07/2024CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
01/09/2018CompleteP.L. ELEC'L CONTR'G CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/21/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
07/03/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
07/03/2025Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
07/03/2025Concrete - Cast-In-PlaceDEZHANG FANGspecial
07/03/2025Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
07/03/2025FinalDEZHANG FANGprogress
07/03/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
07/03/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
07/03/2025Footing and FoundationDEZHANG FANGprogress
07/03/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
07/03/2025Structural Wood FrameDEZHANG FANGprogress
07/03/2025Fenestration air leakageDEZHANG FANGenergy_progress
07/03/2025Fenestration areasDEZHANG FANGenergy_progress
07/03/2025Insulation placement and R valuesDEZHANG FANGenergy_progress
07/03/2025Air barrier - visual inspectionDEZHANG FANGenergy_progress
07/03/2025Interior lighting powerDEZHANG FANGenergy_progress
07/03/2025Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
05/16/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
05/16/2025Concrete - Cast-In-PlaceDEZHANG FANGspecial
05/16/2025Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
05/16/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
05/16/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDEZHANG FANGspecial
05/16/2025Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
05/16/2025FinalDEZHANG FANGprogress
05/16/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
05/16/2025Footing and FoundationDEZHANG FANGprogress
Latest 25 of 54.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08009605-I1Request digital key ↗
08/25/2026Q08009605-P1Request digital key ↗
08/20/2026Q00793716-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00793716-I1Open ↗
08/13/2026Q00793716-P1Open ↗
08/13/2026Q00793716-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026Q00793716-P1Open ↗
08/13/2026Q00793716-I1Open ↗
08/13/2026Q00793716-P2Open ↗
▸Seals & Professional Certifications18
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00793716-P2Open ↗
09/01/2026Q08009605-I1Open ↗
09/01/2026Q08009605-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00793716-P2Open ↗
09/01/2026Q00793716-P2Open ↗
08/25/2026Q00793716-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026Q00793716-P2Open ↗
08/20/2026Q00793716-P1Open ↗
08/20/2026Q00793716-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026Q00793716-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00793716-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026Q00793716-P1Open ↗
08/13/2026Q00793716-P2Open ↗
08/13/2026Q00793716-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00793716-P1Open ↗
08/13/2026Q00793716-P2Open ↗
08/13/2026Q00793716-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00793716-P1Open ↗
08/13/2026Q00793716-P2Open ↗
08/13/2026Q00793716-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00793716-I1Open ↗