| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/04/2023 | — | — | 49 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/04/2023 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/04/2023 | — | — | Concrete |
| Firm | Filings | Most Recent |
|---|---|---|
| TAN ARCHITECT P.C | 4 | 10/04/2023 |
| TIMES BUILDINGS ENGINEERING SER PC | 3 | 07/25/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| TIMES BUILDINGS ENG SERV P C | 6 | 03/21/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 11/27/2023 | HVAC-R and service water heating system controls | — | energy_progress |
| 11/27/2023 | Maintenance information | — | energy_progress |
| 11/27/2023 | Permanent certificate | — | energy_progress |
| 11/27/2023 | Metering | — | energy_progress |
| 11/27/2023 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 11/27/2023 | HVAC-R and service water heating equipment | — | energy_progress |
| 09/27/2023 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 09/27/2023 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | — | special |
| 09/22/2023 | Sprinkler Systems | — | special |
| 09/18/2023 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 09/18/2023 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 07/25/2023 | Masonry | — | special |
| 07/07/2023 | Subgrade Inspections | — | special |
| 07/07/2023 | Final | — | progress |
| 07/07/2023 | Final | — | progress |
| 07/07/2023 | Footing and Foundation | — | progress |
| 07/07/2023 | Concrete - Cast-In-Place | — | special |
| 07/07/2023 | Concrete - Cast-In-Place | — | special |
| 03/10/2023 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/10/2023 | Fenestration areas | — | energy_progress |
| 03/10/2023 | Protection of exposed foundation insulation | — | energy_progress |
| 03/10/2023 | Insulation placement and R values | — | energy_progress |
| 03/10/2023 | Electric vehicle service equipment requirements | — | energy_progress |
| 03/10/2023 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/10/2023 | Subsurface Investigations (Borings/Test Pits) | — | special |