← Back
One family attached or semi-detached
57-22 LITTLE NECK PARKWAY
QUEENS · BIN 4172927
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R3-2Zoning
1,296 sfGross Floor Area
1Units
One family attached or semi-detached · 3,028 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 21p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
Cellar1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC205/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010205/30/2022
Building Lifecycle
All (17)Filed (2)Permit Issued (2)Signed Off (1)Inspection (2)Special Inspection (10)
06/10/2022
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU. 2ND FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00591524-I1
06/07/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
05/31/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
05/31/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
05/31/2022
Special inspection requirement — Maintenance information
XIUCHENG LI
05/31/2022
Special inspection requirement — Interior lighting power
XIUCHENG LI
05/30/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU. 2ND FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00591524-P1
05/25/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
05/23/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
05/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
05/23/2022
Special inspection requirement — Interior lighting power
XIUCHENG LI
05/23/2022
Special inspection requirement — Maintenance information
XIUCHENG LI
10/19/2021
Permit issued — General Construction
Q00591524-I1-GC
09/17/2021
Permit issued — General Construction
Q00591524-I1-GC
09/14/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST THRU. 2ND FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00591524-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC10/19/2021
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC09/17/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/07/2022Pass-Final General Construction Non-Directive 14PassView ↗
05/25/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/31/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
05/31/2022Fire-Resistance Rated ConstructionXIUCHENG LIprogress
05/31/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
05/31/2022Maintenance informationXIUCHENG LIenergy_progress
05/31/2022Interior lighting powerXIUCHENG LIenergy_progress
05/23/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
05/23/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
05/23/2022Fire-Resistance Rated ConstructionXIUCHENG LIprogress
05/23/2022Interior lighting powerXIUCHENG LIenergy_progress
05/23/2022Maintenance informationXIUCHENG LIenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00591524-P1Request digital key ↗
08/26/2026Q00591524-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00591524-P1Open ↗
09/01/2026Q00591524-P1Open ↗
08/25/2026Q00591524-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00591524-I1Open ↗
08/26/2026Q00591524-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00591524-P1Open ↗
08/25/2026Q00591524-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00591524-I1Open ↗
08/26/2026Q00591524-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00591524-I1Open ↗