← Back
One story - permanent living quarter
76-07 265 STREET
QUEENS · BIN 4174048
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R2AZoning
1,154 sfGross Floor Area
1Units
One story - permanent living quarter · 7,200 sf lot · 0.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction14p · 2 filings · 20 docs
Floor 1Under Construction13p · 2 filings · 20 docs
CellarUnder Construction13p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2022$870K—ABRAHAM MADATHILETHU THOMAS & SUSAN ABRAHAM TRUST → Private party$754/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN606/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor404/09/2026
JENOCA CONSTRUCTION INCGeneral Contractor303/21/2026
WATERMARK PLUMBING CORPPlumbing207/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616506/30/2026
Building Lifecycle
All (48)Filed (6)Permit Issued (5)Signed Off (1)Inspection (6)Special Inspection (30)
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/01/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
07/01/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/01/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/30/2026
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures for the renovation of the existing one family dwelling unit, filed in conjunction with approved ALTI application #Q08025984-I1
Q00912879-P2
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/15/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
06/15/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/15/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
04/27/2026
Permit issued — Plumbing
Q00912879-I1-PL
04/20/2026
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures for the renovation of the existing one family dwelling unit, filed in conjunction with approved ALTI application #Q08025984-I1
Q00912879-P1
03/03/2026
Signed off — Alteration
Installation of new construction fence,file in conjunction with ALT CO application #Q08025984-I1
Q00801660-I1
03/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/10/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
02/07/2025
Permit issued — General Construction
Q08025984-I1-GC-CX
04/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2024
Permit issued — Plumbing
Q00912879-I1-PL
04/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/03/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
04/03/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/03/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
04/03/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/03/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/03/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
04/03/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ALDO BRAVO
04/03/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
04/03/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
FAHAD FATEH
04/03/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
04/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/14/2024
Filed — Alteration
Installation of new gas fired equipment and plumbing fixtures for the renovation of the existing one family dwelling unit, filed in conjunction with approved ALTI application #Q08025984-I1
Q00912879-I1
03/05/2024
Filed — Alteration CO
Exiting 1.5 stories,one family dwelling to be horizontally and vertically enlarged and fully renovated .New drywall partitions and plumbing fixtures as per plans.
Q08025984-P1
05/30/2023
Permit issued — Structural
Q08025984-I1-GC-CX
05/12/2023
Permit issued — Construction Fence
Q00801660-I1-FN
12/21/2022
Filed — Alteration
Installation of new construction fence,file in conjunction with ALT CO application #Q08025984-I1
Q00801660-I1
11/20/2022
Filed — Alteration CO
Exiting 1.5 stories,one family dwelling to be horizontally and vertically enlarged and fully renovated .New drywall partitions and plumbing fixtures as per plans.
Q08025984-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWATERMARK PLUMBING CORP04/27/2026
DOB NOWGeneral ConstructionPermit IssuedJENOCA CONSTRUCTION INC02/07/2025
DOB NOWPlumbingPermit IssuedWATERMARK PLUMBING CORP04/08/2024
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC05/30/2023
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC05/12/2023
1 project · most recent 03/05/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2024Permit IssuedJENOCA CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-8C48NAHZ 36,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 06/30/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/30/2026Permit IssuedWATERMARK PLUMBING CORPGas, Storm, Water/Sanitary
1 project · most recent 01/31/2024
General Wiring
FiledStatusContractorScope
01/31/2024CompleteGREY GOOSE ELECTRIC CORPGeneral Wiring
1 project · most recent 03/05/2024
Concrete Wood
FiledStatusContractorScope
03/05/2024Permit IssuedJENOCA CONSTRUCTION INCConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
04/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/01/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/01/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
07/01/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
07/01/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
07/01/2026Maintenance informationFAHAD FATEHenergy_progress
07/01/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/01/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/01/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/15/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/15/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
06/15/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
06/15/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
06/15/2026Maintenance informationFAHAD FATEHenergy_progress
06/15/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/15/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/15/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/03/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/03/2024Shutoff dampersFAHAD FATEHenergy_progress
04/03/2024Fenestration areasFAHAD FATEHenergy_progress
04/03/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/03/2024Permanent certificateFAHAD FATEHenergy_progress
04/03/2024Interior lighting powerFAHAD FATEHenergy_progress
04/03/2024Fenestration air leakageFAHAD FATEHenergy_progress
04/03/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
04/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
Latest 25 of 39.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00801660-I1Request digital key ↗
08/23/2026Q08025984-P1Request digital key ↗
08/23/2026Q08025984-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q08025984-P1Open ↗
08/13/2026Q08025984-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08025984-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
09/19/2026Q00912879-P2Open ↗
09/19/2026Q00912879-P2Open ↗
09/02/2026Q08025984-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026Q08025984-I1Open ↗
08/23/2026Q08025984-P1Open ↗
08/17/2026Q00912879-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026Q00912879-P2Open ↗
09/02/2026Q08025984-I1Open ↗
09/02/2026Q08025984-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q08025984-P1Open ↗
08/13/2026Q08025984-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q08025984-I1Open ↗
08/23/2026Q08025984-P1Open ↗
08/17/2026Q00912879-P2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q08025984-P1Open ↗
08/13/2026Q08025984-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q08025984-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026Q08025984-P1Open ↗
08/13/2026Q08025984-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q08025984-P1Open ↗
08/13/2026Q08025984-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q08025984-P1Open ↗
08/13/2026Q08025984-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q08025984-P1Open ↗
08/23/2026Q08025984-I1Open ↗