DOB09/10/2021BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 440609922 DUE TO SUPERINTENDENT OF CONSTRUCTION WITHDRAWAL
ECB07/19/2021BC 3303.2.4 SANITARY FACILITIES NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING WITH WORK IN PROGRESS,I OBSERVED THAT THERE WAS NO SANITARY FACILITY ONSITE FOR THE WORKERS.REM:STOP ALL WORK.PROVIDE A SA$12K due
ECB07/19/2021BC 3307.5 FLAG PERSON NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING WITH WORK IN PROGRESS,I OBSERVED A CONCRETE SUPPLY TRUCK STAIONED PARTIALLY IN THE MIDDLE OF A NARROW 2 WAY STREET.THE TRUCK OBSTRUC$12K due
ECB07/19/2021NO DOCUMENTS ONSITE.NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING WITH WORK IN PROGRESS,I REQUESTED TO SEE THE CONSTRUCTION DOCUMENTS(SUPERTENDENT LOGS,PRE-SHIFT SAFETY MEETING,ORIENTATION PE STAMPED$12K due
ECB07/19/2021HOUSEKEEPING NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING WITH WORK IN PROGRESS,I OBSERVED THAT THE HOUSEKEEPING WAS INADEQUATE.THERE WAS MOUNDS OF DIRT,WOOD,TOOLS,ROCKS,TABLES AND DEBRIS THAT CREATE$12K due
ECB07/19/2021FENCE NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING WITH WORK IN PROGRESS,I OBSERVED A CONSTRUCTION FENCE IN PLACE AT EXP 1,2 AND 4 THERE WAS NO FENCE AT EX#3 MADE OF PLYWOOD.THE PLYWOOD FENCE AT EX'S$5K due
ECB07/19/2021BC 3307.72 FENCE GATE SWING NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING WITH WORK IN PROGRESS,I OBSERVED THAT THE CONSTRUCTION FENCE GATE DOORS SWING OUTUERD INTO THE PEDESTRIAN WALKWAY.THE SWING OF$12K due
ECB07/19/2021FAILURE TO SAFEGUARD(UNLOCKED SITE)NOTE:AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDING WITH WORKERS ONSITE,I OBSERVED THAT THE WORKERS CLOSED THE OUTWARD SWING GATE AND SECURED IT WITH A LONG WHITE PIECE OF$25K due
ECB07/19/2021WORKING AGAINST A STOP WORK ORDER NOTE:AT THE TIME OF MY INSPECTION OFA 2 STORY BUILDING UNDER A FULL STOP WORK ORDER SINCE 07/16/2021 WITH NOTIFICATION CURRENTLY POSTED TO THE FENCES I OBSERVED THE SITE OPEN W$25K due
ECB07/19/2021SAFETY MEASURES AND STANDARDS NOTE:AT THE TIME OF MY INSPECTION OF A 2STORY BUILDING WITH CONCRETE FORM AND CONCRETE POURING WORK IN PROGRESS,I OBSERVED WORKERS STANDING ON TOP OF 2X4 WOOD,STANDING ON TOP OF CL$25K due
ECB07/16/2021SAFETY MEASURES AND STANDARDS NOTE:AT THE TIME OF MY INSPECTION OF A 2STORY BUILDING WITH WORK IN PROGRESS,I OBSERVED THAT THE 2ND STORY HADBEEN DEMOED LEAVING THE CHIMNEY STACK EXPOSED TO THE ELEMENTS AND UNSE$25K due