← Back
Two stories - detached, small or mid-size
82-69 251 STREET
QUEENS · BIN 4175040
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,015 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,500 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRACE ENGINEERING PLLC.210/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JMR CONSTRUCTION CO INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRACE ENGINEERING PLLC.2176210/03/2023
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Inspection (1)Special Inspection (3)
05/09/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/05/2023
Permit issued — Structural
Q00932440-I1-GC-CX
10/03/2023
Filed — Alteration
APPLICATION FILED TO CONSTRUCT NEW EXTERIOR STAIR TO EXISTING CELLAR
Q00932440-P1
10/02/2023
Special inspection requirement — Concrete - Precast
TARIQ SIDDIQUI
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
10/02/2023
Special inspection requirement — Final
TARIQ SIDDIQUI
09/14/2023
Filed — Alteration
APPLICATION FILED TO CONSTRUCT NEW EXTERIOR STAIR TO EXISTING CELLAR
Q00932440-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJMR CONSTRUCTION CO INC10/05/2023
BIS—ISSUEDOWNER02/14/2005
BISPLISSUEDAJIT ONE MECH&GEN'L CONTR04/08/2004
BIS—ISSUEDASSR INC03/30/2004
1 project · most recent 10/03/2023
Concrete
FiledStatusContractorScope
10/03/2023Signed-offJMR CONSTRUCTION CO INCConcrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/09/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/02/2023Concrete - PrecastTARIQ SIDDIQUIspecial
10/02/2023Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
10/02/2023FinalTARIQ SIDDIQUIprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026Q00932440-P1Request digital key ↗
08/24/2026Q00932440-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026Q00932440-I1Open ↗
08/24/2026Q00932440-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q00932440-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q00932440-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026Q00932440-I1Open ↗
08/24/2026Q00932440-P1Open ↗