Two stories - detached, small or mid-size
253-12 85 AVENUE
QUEENS · BIN 4175879
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,268 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: PARMAR LLC · 4,800 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 11 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAHARA CONSTRUCTION1107/08/2026
PARMAR LLC103/22/2026
RAVI CONSTRUCTION103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR112/05/2023
GRACE ENGINEERING PLLC.211/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SAHARA CONSTRUCTION203/21/2026
ARCHITECTURAL CONCEPT INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAI JI PLUMBING, INCPlumbing407/08/2026
SAHARA CONSTRUCTION CORPGeneral Contractor303/21/2026
JEFFREY MARINELLOElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524112/05/2023
GRACE ENGINEERING PLLC.2176211/17/2021
Building Lifecycle
All (34)Filed (3)Permit Issued (3)Violation (7)Inspection (5)Objection (4)Special Inspection (12)
03/18/2025
Violation issued (ECB, open)
Zoning
07/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/29/2023
Permit issued — Solar
Q00972017-I1-SL
12/22/2023
Objection raised — Other
12/22/2023
Objection resolved — Addressed
12/22/2023
Objection raised — Other
12/22/2023
Objection resolved — Addressed
12/05/2023
Filed — Alteration
Installation of solar panels, rooftop, grid tied, RAILED (14.4KW)(36MODULES)
Q00972017-I1
12/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
12/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
12/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
12/05/2023
Special inspection requirement — Final
Mina Makar
12/05/2023
Special inspection requirement — Air barrier - visual inspection
Mina Makar
01/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2022
Permit issued — Plumbing
Q00630984-I1-PL
11/17/2021
Filed — Alteration
APPLICATION FILLING TO CHANGE HALF BATHROOM INTO 3 FIXTURES BATHROOM.
Q00630984-I1
11/17/2021
Permit issued — General Construction
Q00628308-I1-GC
11/17/2021
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
11/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
11/15/2021
Filed — Alteration
APPLICATION FILLING TO CHANGE HALF BATHROOM INTO 3 FIXTURES BATHROOM.
Q00628308-I1
11/15/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
TARIQ SIDDIQUI
11/15/2021
Special inspection requirement — Energy Code Compliance Inspections
TARIQ SIDDIQUI
11/15/2021
Special inspection requirement — Fire-Resistance Rated Construction
TARIQ SIDDIQUI
11/15/2021
Special inspection requirement — Air barrier - visual inspection
TARIQ SIDDIQUI
11/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
04/04/2005
Violation issued (ECB, closed)
Construction
03/28/2005
Violation issued (ECB, closed)
Construction
03/24/2005
Violation issued (ECB, closed)
Site Safety
11/15/2004
Violation issued (ECB, closed)
Construction
11/15/2004
Violation issued (ECB, closed)
Construction
07/10/1999
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR12/29/2023
DOB NOWPlumbingSigned-offSAI JI PLUMBING, INC04/14/2022
DOB NOWGeneral ConstructionPermit IssuedSAHARA CONSTRUCTION CORP11/17/2021
BISEQISSUEDRAVI CONSTRUCTION INC.04/01/2005
BIS—ISSUEDRAVI CONSTRUCTION INC.04/01/2005
BIS—ISSUEDDALIMA CONSTRUCTION INC04/01/2005
BIS—ISSUEDRAVI CONSTRUCTION03/03/2005
BISEQISSUEDRAVI CONSTRUCTION INC.02/17/2005
BISPLISSUEDKISHAN PLUMBING INC11/30/2004
1 project · most recent 12/05/2023
FiledStatusContractorScope
12/05/2023CompleteISLAND ELECTRIC CORP—
1 project · most recent 12/05/2023
FiledStatusContractorScope
12/05/2023Permit IssuedMOMENTUM SOLAR36 panels, 14.4 kw, 633 roof_area_sqft
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/05/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
12/05/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
12/05/2023Energy Code Compliance InspectionsMina Makarprogress
12/05/2023FinalMina Makarprogress
12/05/2023Air barrier - visual inspectionMina Makarenergy_progress
11/17/2021Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
11/17/2021Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
11/15/2021HVAC-R and service water piping design and insulationTARIQ SIDDIQUIenergy_progress
11/15/2021Energy Code Compliance InspectionsTARIQ SIDDIQUIprogress
11/15/2021Fire-Resistance Rated ConstructionTARIQ SIDDIQUIprogress
11/15/2021Air barrier - visual inspectionTARIQ SIDDIQUIenergy_progress
11/15/2021Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00628308-I1Request digital key ↗
08/27/2026Q00630984-I1Request digital key ↗
08/23/2026Q00972017-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature8
08/26/2026Q00628308-I1Open ↗
08/26/2026Q00628308-I1Open ↗
08/26/2026Q00628308-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026Q00972017-P1Open ↗
08/23/2026Q00972017-I1Open ↗
08/13/2026Q00630984-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026Q00628308-I1Open ↗
08/25/2026Q00972017-I1Open ↗
08/24/2026Q00630984-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00972017-P1Open ↗
08/23/2026Q00972017-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00972017-I1Open ↗