Cape Cod
270-04 UNION TURNPIKE
QUEENS · BIN 4177238
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2AZoning
1,702 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Cape Cod · 4,400 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRACE ENGINEERING PLLC.301/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLOOM CONSTRUCTION INCGeneral Contractor203/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRACE ENGINEERING PLLC.2176112/15/2021
Building Lifecycle
All (27)Filed (3)Permit Issued (3)Signed Off (2)Violation (7)Inspection (7)Special Inspection (5)
09/09/2024
Signed off — Alteration
Application filling to interior renovation to add half bathroom at cellar
Q00596611-I1
10/10/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/13/2023
Signed off — Alteration
Application filling add half bathroom and new laundry fixtures at caller level.
Q00648503-I1
03/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/01/2023
Permit issued — Plumbing
Q00648503-I1-PL
01/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2023
Filed — Alteration
Application filling add half bathroom and new laundry fixtures at caller level.
Q00648503-P1
05/27/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/13/2022
Permit issued — Plumbing
Q00648503-I1-PL
12/21/2021
Permit issued — General Construction
Q00596611-I1-GC-CX
12/15/2021
Filed — Alteration
Application filling to interior renovation to add half bathroom at cellar
Q00596611-I1
12/15/2021
Filed — Alteration
Application filling add half bathroom and new laundry fixtures at caller level.
Q00648503-I1
09/20/2021
Special inspection requirement — Mechanical Systems
TARIQ SIDDIQUI
09/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
TARIQ SIDDIQUI
09/20/2021
Special inspection requirement — Final
TARIQ SIDDIQUI
09/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
TARIQ SIDDIQUI
09/20/2021
Special inspection requirement — Air barrier - visual inspection
TARIQ SIDDIQUI
06/10/2017
Violation issued (ECB, closed)
Construction
04/12/2017
Violation issued (ECB, closed)
Construction
03/28/2017
Violation issued (ECB, closed)
Construction
01/08/2017
Violation issued (ECB, closed)
Construction
12/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2016
Violation issued (ECB, closed)
Quality of Life
09/21/2016
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP03/01/2023
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP01/13/2022
DOB NOWGeneral ConstructionSigned-offBLOOM CONSTRUCTION INC12/21/2021
BISPLISSUEDACCURATE MECHANICAL INC11/04/2005
BIS—ISSUEDBABEL DESIGN INC09/20/2005
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/10/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/20/2021Mechanical SystemsTARIQ SIDDIQUIspecial
09/20/2021Fire-Resistant Penetrations and JointsTARIQ SIDDIQUIspecial
09/20/2021FinalTARIQ SIDDIQUIprogress
09/20/2021HVAC-R and service water piping design and insulationTARIQ SIDDIQUIenergy_progress
09/20/2021Air barrier - visual inspectionTARIQ SIDDIQUIenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00596611-I1Request digital key ↗
08/26/2026Q00648503-I1Request digital key ↗
08/26/2026Q00648503-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00596611-I1Open ↗
08/26/2026Q00648503-I1Open ↗
08/13/2026Q00648503-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026Q00596611-I1Open ↗
08/30/2026Q00596611-I1Open ↗
08/30/2026Q00596611-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026Q00596611-I1Open ↗
08/30/2026Q00596611-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00596611-I1Open ↗
08/26/2026Q00648503-I1Open ↗
08/13/2026Q00648503-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00596611-I1Open ↗