Two stories - detached, small or mid-size
81-32 258 STREET
QUEENS · BIN 4178487
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
1,720 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
StructuralElectrical
Roof2p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC210/02/2024
ARCHITECTURAL CONCEPT504/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
ARCHITECTUAL CONCEPT1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MMDK552 GROUP LLCGeneral Contractor307/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272210/02/2024
ARCHITECTURAL CONCEPT3642404/06/2023
Building Lifecycle
All (58)Filed (7)Permit Issued (4)Signed Off (4)Inspection (3)Objection (10)Special Inspection (30)
01/13/2025
Signed off — Alteration CO
Application filed to add 2nd floor as per drawings filed herewith.
Q00559762-I1
12/09/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01101768-I1
10/02/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01101768-P1
10/02/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/02/2024
Special inspection requirement — Final
Walid Abdulla
10/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/10/2024
Permit issued — Solar
Q01101768-I1-SL
08/29/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01101768-I1
09/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/23/2023
Signed off — Alteration
Construction of new fence as per drawing.
Q00545225-I1
08/23/2023
Signed off — Alteration
CELLAR AND FIRST FLOOR BATHROOM INCLUDING RISER TO REMAIN AND INSTALL NEW BATHROOM AT SECOND FLOOR INCLUDING RELATED PIPE AS PER DRAWINGS.EXISTING CELLAR 3 FIXTURES BATHROOM TO BE LEGALIZED.
Q00545220-I1
04/06/2023
Filed — Alteration
CELLAR AND FIRST FLOOR BATHROOM INCLUDING RISER TO REMAIN AND INSTALL NEW BATHROOM AT SECOND FLOOR INCLUDING RELATED PIPE AS PER DRAWINGS.EXISTING CELLAR 3 FIXTURES BATHROOM TO BE LEGALIZED.
Q00545220-P2
01/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/08/2022
Permit issued — Plumbing
Q00545220-I1-PL
05/05/2022
Permit issued — Foundation
Q00559762-I1-GC-CX
05/05/2022
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Final
TARIQ SIDDIQUI
05/05/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Structural Wood Frame
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Masonry
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Heating Systems
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
05/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
04/29/2022
Objection raised — Zoning
04/29/2022
Objection resolved — Addressed
04/29/2022
Objection raised — Zoning
04/29/2022
Objection resolved — Addressed
04/29/2022
Objection resolved — Addressed
03/31/2022
Objection raised — Other
03/24/2022
Filed — Alteration CO
Application filed to add 2nd floor as per drawings filed herewith.
Q00559762-P1
03/14/2022
Permit issued — Construction Fence
Q00545225-I1-FN
03/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
03/02/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
03/02/2022
Special inspection requirement — Final
TARIQ SIDDIQUI
03/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
03/02/2022
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
03/02/2022
Special inspection requirement — Structural Wood Frame
MUZAFFAR JAMAL
03/02/2022
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
03/02/2022
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
03/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
07/19/2021
Filed — Alteration CO
Application filed to add 2nd floor as per drawings filed herewith.
Q00559762-I1
07/19/2021
Objection raised — Scope
07/19/2021
Objection resolved — Addressed
06/28/2021
Filed — Alteration
Construction of new fence as per drawing.
Q00545225-I1
06/28/2021
Filed — Alteration
CELLAR AND FIRST FLOOR BATHROOM INCLUDING RISER TO REMAIN AND INSTALL NEW BATHROOM AT SECOND FLOOR INCLUDING RELATED PIPE AS PER DRAWINGS.EXISTING CELLAR 3 FIXTURES BATHROOM TO BE LEGALIZED.
Q00545220-I1
06/28/2021
Objection raised — Scope
06/28/2021
Objection resolved — Addressed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/10/2024
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING09/08/2022
DOB NOWFoundationPermit IssuedMMDK552 GROUP LLC05/05/2022
DOB NOWConstruction FenceSigned-offMMDK552 GROUP LLC03/14/2022
1 project · most recent 03/24/2022
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/24/2022Permit IssuedMMDK552 GROUP LLCAssociated Ducts and Piping, Ventilation Systems
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×2
Ducts & Piping
A.O. Smith GCV 40 40,000 BTU · Water Heater ×1
Williamson GWA 70 70,000 BTU · Boiler ×1
2 projects · most recent 09/27/2024
FiledStatusContractorScope
09/27/2024CompleteSUNRUN SOLAR ELECTL CORP—
06/28/2022CompleteLIT MODE ELECL CONTG INC—
1 project · most recent 03/24/2022
Masonry Wood
FiledStatusContractorScope
03/24/2022Permit IssuedMMDK552 GROUP LLCMasonry, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/02/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
10/02/2024Energy Code Compliance InspectionsWalid Abdullaprogress
10/02/2024FinalWalid Abdullaprogress
10/02/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/02/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/05/2022Mechanical SystemsMUZAFFAR JAMALspecial
05/05/2022Footing and FoundationMUZAFFAR JAMALprogress
05/05/2022Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
05/05/2022FinalTARIQ SIDDIQUIprogress
05/05/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
05/05/2022Structural Wood FrameMUZAFFAR JAMALprogress
05/05/2022Fenestration areasMUZAFFAR JAMALenergy_progress
05/05/2022Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
05/05/2022Fenestration air leakageMUZAFFAR JAMALenergy_progress
05/05/2022Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
05/05/2022HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
05/05/2022MasonryMUZAFFAR JAMALspecial
05/05/2022Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
05/05/2022Heating SystemsMUZAFFAR JAMALspecial
05/05/2022Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
05/05/2022Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
03/02/2022Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
03/02/2022Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
03/02/2022FinalTARIQ SIDDIQUIprogress
03/02/2022Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
Latest 25 of 37.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00545220-P2Request digital key ↗
08/26/2026Q00559762-I1Request digital key ↗
08/21/2026Q01101768-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00559762-P1Open ↗
08/13/2026Q00559762-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00559762-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature18
09/23/2026Q00559762-I1Open ↗
09/23/2026Q00559762-I1Open ↗
09/23/2026Q00559762-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026Q00559762-I1Open ↗
09/23/2026Q00559762-I1Open ↗
09/23/2026Q00559762-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00545225-I1Open ↗
08/13/2026Q01101768-I1Open ↗
08/13/2026Q00559762-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00559762-P1Open ↗
08/13/2026Q00559762-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00559762-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q01101768-P1Open ↗
08/13/2026Q01101768-I1Open ↗
08/13/2026Q00559762-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00545220-I1Open ↗
08/13/2026Q00559762-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01101768-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00559762-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026Q00559762-I1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00559762-P1Open ↗
08/13/2026Q00559762-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00559762-P1Open ↗
08/13/2026Q00559762-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00559762-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00559762-I1Open ↗