← Back
Two stories - detached, small or mid-size
82-65 259 STREET
QUEENS · BIN 4178958
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Architecture
Floor 216p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED GENERAL CONTRACTORS2103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/16/2022$1.1M—8265 HOLDING LLC → Private party$562/sf building
05/06/2021$500K—Private party → 8265 HOLDING LLC$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANAND J. SOLANKI, P.E.706/17/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED GENERAL CONTRA CORGeneral Contractor603/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANAND J. SOLANKI, P.E.3662606/17/2022
Building Lifecycle
All (59)Filed (7)Permit Issued (3)Signed Off (2)Violation (3)Inspection (8)Objection (6)Special Inspection (30)
07/01/2022
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN CELLAR AND SECOND FLOORS. FILED IN CONJUNCTION WITH DOB:NOW APPLICATION #Q00552101. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00552123-I1
06/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anand Solanki
06/29/2022
Special inspection requirement — Permanent certificate
Anand Solanki
06/29/2022
Special inspection requirement — Fenestration areas
Anand Solanki
06/29/2022
Special inspection requirement — Fenestration air leakage
Anand Solanki
06/29/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Anand Solanki
06/29/2022
Special inspection requirement — Shutoff dampers
Anand Solanki
06/29/2022
Special inspection requirement — Insulation placement and R values
Anand Solanki
06/29/2022
Special inspection requirement — Heating Systems
Anand Solanki
06/29/2022
Special inspection requirement — Final
Anand Solanki
06/29/2022
Special inspection requirement — Air barrier - visual inspection
Anand Solanki
06/29/2022
Special inspection requirement — Maintenance information
Anand Solanki
06/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
Anand Solanki
06/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
Anand Solanki
06/29/2022
Special inspection requirement — Interior lighting power
Anand Solanki
06/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anand Solanki
06/29/2022
Special inspection requirement — Subgrade Inspections
Anand Solanki
06/29/2022
Special inspection requirement — Concrete - Cast-In-Place
Anand Solanki
06/29/2022
Special inspection requirement — Chimneys and vents
Anand Solanki
06/29/2022
Special inspection requirement — Mechanical Systems
Anand Solanki
06/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anand Solanki
06/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
Anand Solanki
06/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Anand Solanki
06/26/2022
Objection resolved — Addressed
06/23/2022
Objection raised — Scope
06/17/2022
Filed — Alteration CO
PROPOSED SECOND FLOOR ADDITION OVER EXISTING FIRST FLOOR ENVELOPE ONLY. NEW PLUMBING FIXTURES TO BE INSTALLED IN CELLAR AND SECOND FLOORS. NEW CERTIFICATE OF OCCUPANCY SHALL BE ISSUED FOR ONE FAMILY DWELLING.
Q00552101-P4
06/17/2022
Special inspection requirement — Energy Code Compliance Inspections
Anand Solanki
06/17/2022
Special inspection requirement — Subgrade Inspections
Anand Solanki
06/17/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anand Solanki
06/17/2022
Special inspection requirement — Mechanical Systems
Anand Solanki
06/17/2022
Special inspection requirement — Heating Systems
Anand Solanki
06/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anand Solanki
06/17/2022
Special inspection requirement — Concrete - Cast-In-Place
Anand Solanki
06/17/2022
Special inspection requirement — Chimneys and vents
Anand Solanki
06/09/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2022
Signed off — Alteration
Q00552120-I1
04/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2022
Objection resolved — Addressed
02/28/2022
Objection raised — Scope
02/23/2022
Filed — Alteration CO
PROPOSED SECOND FLOOR ADDITION OVER EXISTING FIRST FLOOR ENVELOPE ONLY. NEW PLUMBING FIXTURES TO BE INSTALLED IN CELLAR AND SECOND FLOORS. NEW CERTIFICATE OF OCCUPANCY SHALL BE ISSUED FOR ONE FAMILY DWELLING.
Q00552101-P2
02/01/2022
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN CELLAR AND SECOND FLOORS. FILED IN CONJUNCTION WITH DOB:NOW APPLICATION #Q00552101. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00552123-P1
01/31/2022
Objection resolved — Addressed
01/21/2022
Violation issued (ECB, closed)
Site Safety
01/21/2022
Violation issued (ECB, closed)
Construction
01/21/2022
Violation issued (ECB, closed)
Site Safety
11/29/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/29/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/16/2021
Permit issued — Plumbing
Q00552123-I1-PL
11/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/16/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/10/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/05/2021
Permit issued — General Construction
Q00552101-I1-GC-CX
09/20/2021
Objection raised — Scope
09/14/2021
Filed — Alteration CO
PROPOSED SECOND FLOOR ADDITION OVER EXISTING FIRST FLOOR ENVELOPE ONLY. NEW PLUMBING FIXTURES TO BE INSTALLED IN CELLAR AND SECOND FLOORS. NEW CERTIFICATE OF OCCUPANCY SHALL BE ISSUED FOR ONE FAMILY DWELLING.
Q00552101-P1
09/10/2021
Permit issued — Construction Fence
Q00552120-I1-FN
08/08/2021
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN CELLAR AND SECOND FLOORS. FILED IN CONJUNCTION WITH DOB:NOW APPLICATION #Q00552101. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00552123-I1
07/27/2021
Filed — Alteration
Q00552120-I1
07/27/2021
Filed — Alteration CO
PROPOSED SECOND FLOOR ADDITION OVER EXISTING FIRST FLOOR ENVELOPE ONLY. NEW PLUMBING FIXTURES TO BE INSTALLED IN CELLAR AND SECOND FLOORS. NEW CERTIFICATE OF OCCUPANCY SHALL BE ISSUED FOR ONE FAMILY DWELLING.
Q00552101-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT11/16/2021
DOB NOWGeneral ConstructionPermit IssuedUNITED GENERAL CONTRA COR10/05/2021
DOB NOWConstruction FenceSigned-offUNITED GENERAL CONTRA COR09/10/2021
1 project · most recent 06/17/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2022Permit IssuedUNITED GENERAL CONTRA CORAir Conditioning Systems, Heating Systems
Cooling
Luxaire TC3B4221HA 3 tons · Condensing Unit ×4
Mitsubishi Electric PCY-A36NHA 3 tons · Vrf Indoor ×4
Rheem RH1P3017STANAA 3 tons · Ahu ×4
Heating
Crown Boiler AWR140 140,000 BTU · Boiler ×4
1 project · most recent 05/05/2022
General Wiring
FiledStatusContractorScope
05/05/2022CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/09/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/10/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
06/29/2022Fire-Resistant Penetrations and JointsAnand Solankispecial
06/29/2022HVAC-R and service water piping design and insulationAnand Solankienergy_progress
06/29/2022Fenestration air leakageAnand Solankienergy_progress
06/29/2022Fenestration areasAnand Solankienergy_progress
06/29/2022Maintenance informationAnand Solankienergy_progress
06/29/2022HVAC-R and service water heating equipmentAnand Solankienergy_progress
06/29/2022HVAC-R and service water heating system controlsAnand Solankienergy_progress
06/29/2022Fenestration and door U-factor and product ratingsAnand Solankienergy_progress
06/29/2022Shutoff dampersAnand Solankienergy_progress
06/29/2022Interior lighting powerAnand Solankienergy_progress
06/29/2022Permanent certificateAnand Solankienergy_progress
06/29/2022Insulation placement and R valuesAnand Solankienergy_progress
06/29/2022Air barrier - visual inspectionAnand Solankienergy_progress
06/29/2022Energy Code Compliance InspectionsAnand Solankiprogress
06/29/2022Fire-Resistance Rated ConstructionAnand Solankiprogress
06/29/2022FinalAnand Solankiprogress
06/29/2022Structural Stability – Alterations of existing buildingsAnand Solankispecial
06/29/2022Mechanical SystemsAnand Solankispecial
06/29/2022Subgrade InspectionsAnand Solankispecial
06/29/2022Heating SystemsAnand Solankispecial
06/29/2022Chimneys and ventsAnand Solankispecial
06/29/2022Concrete - Cast-In-PlaceAnand Solankispecial
06/17/2022Chimneys and ventsAnand Solankispecial
06/17/2022Concrete - Cast-In-PlaceAnand Solankispecial
06/17/2022Fire-Resistant Penetrations and JointsAnand Solankispecial
Latest 25 of 87.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00552120-I1Request digital key ↗
08/26/2026Q00552101-I1Request digital key ↗
08/15/2026Q00552101-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
06/15/2022421490942Open ↗
06/05/2017421490942Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00552101-P2Open ↗
08/13/2026Q00552101-I1Open ↗
08/13/2026Q00552101-P1Open ↗
Showing 3 of 4 on file for this type
▸BISZONING DIAGRAM1
08/21/2017421490942Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00552101-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q00552101-I1Open ↗
09/02/2026Q00552101-I1Open ↗
08/29/2026Q00552120-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00552101-P4Open ↗
08/26/2026Q00552101-P2Open ↗
08/26/2026Q00552101-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026Q00552101-I1Open ↗
08/28/2026Q00552101-P1Open ↗
08/28/2026Q00552101-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/05/2017421490942Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/05/2017421490942Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00552101-P4Open ↗
08/13/2026Q00552101-I1Open ↗
08/13/2026Q00552101-P1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/05/2017421490942Open ↗
▸BISSTREET TREE CHECKLIST1
06/05/2017421490942Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00552101-I1Open ↗
08/15/2026Q00552101-P1Open ↗
08/15/2026Q00552101-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/21/2017421490942Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00552101-I1Open ↗
08/13/2026Q00552123-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/05/2017421490942Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/20/2018421490942Open ↗
02/20/2018421490942Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
06/05/2017421490942Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
06/05/2017421490942Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
06/15/2022421490942Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/05/2017421490942Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00552101-I1Open ↗
08/13/2026Q00552101-P4Open ↗
08/13/2026Q00552101-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00552101-P4Open ↗
08/13/2026Q00552101-P2Open ↗
08/13/2026Q00552101-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSURVEY: INITIAL4
08/13/2026Q00552101-P4Open ↗
08/13/2026Q00552101-I1Open ↗
08/13/2026Q00552101-P2Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
06/05/2017421490942Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00552101-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00552101-P4Open ↗