DOB07/28/2026STRUCTURE RENDERED NON-COMPLIANT. DUE TO OPEN ROOF AND PARTIAL COLLAPSE OF STRUCTURE, SUBMIT AN ENGINEERS REPORT TO THE DEPARTMENT OF BUILDINGS.
ECB03/25/2025UPON REVIEW OF DEPARTMENT RECORD OBSERVED THAT PERMIT #421314517-EQ-FNPERMIT EXPIRE ON 12/21/21 AND HAS NOT BEEN RENEWED.$6K due
ECB06/14/2024JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. TEMPORARY JOBSITE FENCE ERECTED UNDER JOB #421314517-01-EQ-FN IS IN A STATE OF DISREPAIR. NOTED AT EXP. 2, OBSERVED NUMEROUS PANELS HAVE COLLA$5K due
ECB03/25/2024TEMPORARY CONSTRUCTION EQUIPMENT ON SITE -EXPIRED PERMIT. NOTE: OBSERVED TEMPORARY CONSTRUCTION FENCE PERMIT HAS EXPIRED AT THIS LOCATION SINCE 12/21/2021 AND HAS NOT BEEN RENEWED., RENEW PERMIT$6K due
ECB07/20/20213307.7.7 FENCE.NOTE AT THE TIME OF MY INSPECTION OF A 2 STORY BUILDINGWITH NO WORK IN PROGRESS,I OBSERVED THAT THE CONSTRUCTION FENCE AT EXP1 WAS LEANING OUT OF PLUMB AND UNSTABLE IN A NEAR COLLAPSE STATE.AS PE$1K due
DOB06/02/2021BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421314517 D UE TO SUPERINTDENT OF CONSTRUCTION WITHDRAWAL
DOB05/26/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/26/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/24/2021FAILURE TO NOTIFY THE DEPARTMENT PRIOR TO THE COMMENCEMENT OF EARTHWORK NOTED AT THE TIME OF MY INSPECTION I OBSERVED ACTIV SITE FOR WHICH A CS IN REQURIED EARTHWORK /FOUNDATION WORK IN PROGRESS WITHOUT A VALID$12K due
ECB02/24/2021FAILURE TO MAINTAIN REQUIRED DOCUMENTS BY CHAPTER 33 NOTED AT THE TIME OF MY INSPECTION I OBSERVED ACTIEV SITE WITH TEH FOLLOWING REQQUIRED DOCUMENT NOT AVAILABLE PRESENT ON SITE A) NO SOE DRAWINGS B) NO STRUT$6K due
ECB02/24/2021BC3303.2.4-FAILURE TO PROVIDE SANITARY FACILITIES DURING CONSTRUCTION OPERATION AS REQUIRED BY PC 311.1 AND (ANS 24.3) NOTED AT TH ETIME OF MY INSPECTION I OBSERVED ACTIEV SITE WITH STEEL INSTALLATION ON PROGRE$6K due
ECB02/23/2021PERMIT HOLDER ATINDER SINGH FAILED TO PRODUCE FOR INSPECTION THE DAILYLOG THAT IS REQUIRED BY BC3321.2,ITEM 4 REMEDY: COMPLY WITH CODE BC3321.2$12K due
DOB06/07/2019V-DOB VIOLATION - ACTIVE
ECB04/01/2026FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. OBSERVED LARGE EXCAVATED WHOLE AT REAR OF STALL SITE. EXCAVATED AREA IS CAUSING SOIL TO MOVE FROM UNDER ADJACENT PROPERTIES DRIHearing held — result not yet published$10K proposed
ECB04/01/2026FAILURE TO MAINTAIN BUILDING. OBSERVED LARGE EXCAVATED WHOLE AT REAR OF STALL SITE. EXCAVATED AREA IS CAUSING SOIL TO MOVE FROM UNDER ADJACENT PROPERTIES DRIVEWAY CREATING VOID UNDER CONCRETE SLAP AT 83-29 256Hearing held — result not yet published$2K proposed
ECB03/18/2026AT EXPOSURE 2, LARGE SECTION OF CONSTRUCTION FENCE IS LEANING AND SECTIONS MISSING., COMPLY WITH CODEHearing held — result not yet published$1K proposed
ECB03/18/2026CONSTRUCTION FENCE UNDER PERMIT # 421314517 HAS EXPIRED, RENEW PERMITHearing held — result not yet published$3K proposed
One story retail building · Owner of record: DAVID L. HITZIG, LLC · 20,000 sf lot · 0.63 FAR built