← Back
Two family frame
84-11 86 ROAD
QUEENS · BIN 4181549
💬 Discuss this project
1910Year Built
2.5Stories
B2Building Class
R3XZoning
3,316 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
2 jobs · most recent 11/20/2023
General Wiring
FiledStatusContractorScope
11/20/2023CompleteDOMINICK QUARANTAGeneral Wiring
02/14/2022Permit IssuedRIVIERA ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (25)Filed (3)Permit Issued (4)Signed Off (2)Inspection (4)Objection (2)Special Inspection (10)
12/07/2023
Signed off — Alteration
Direct replacement of fire, water damages in cellar, first floor, second floor, and roof as per plan. Replace sheet rock, flooring and finishes. Replace gutters and leaders. No change in use egress or occupancy involved under this application.
Q00545975-I1
11/27/2023
Signed off — Alteration
Direct replacement of fire/water damaged plumbing as per plans; no change in use, egress or occupancy involved under this application.
Q00673068-I1
07/18/2023
Permit issued — General Construction
Q00545975-I1-GC
10/12/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2022
Filed — Alteration
Direct replacement of fire/water damaged plumbing as per plans; no change in use, egress or occupancy involved under this application.
Q00673068-P1
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABY TCHILINGUIRIAN
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABY TCHILINGUIRIAN
08/13/2022
Permit issued — General Construction
Q00545975-I1-GC
08/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/12/2022
Permit issued — Plumbing
Q00673068-I1-PL
02/10/2022
Filed — Alteration
Direct replacement of fire/water damaged plumbing as per plans; no change in use, egress or occupancy involved under this application.
Q00673068-I1
08/19/2021
Permit issued — General Construction
Q00545975-I1-GC
07/20/2021
Objection raised — Other
07/20/2021
Objection resolved — Addressed
06/24/2021
Filed — Alteration
Direct replacement of fire, water damages in cellar, first floor, second floor, and roof as per plan. Replace sheet rock, flooring and finishes. Replace gutters and leaders. No change in use egress or occupancy involved under this application.
Q00545975-I1
06/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GABY TCHILINGUIRIAN
06/23/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
GABY TCHILINGUIRIAN
06/23/2021
Special inspection requirement — Final
GABY TCHILINGUIRIAN
06/23/2021
Special inspection requirement — Energy Code Compliance Inspections
GABY TCHILINGUIRIAN
06/23/2021
Special inspection requirement — Fire-Resistance Rated Construction
GABY TCHILINGUIRIAN
06/23/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
GABY TCHILINGUIRIAN
06/23/2021
Special inspection requirement — Interior lighting power
GABY TCHILINGUIRIAN
06/23/2021
Special inspection requirement — Insulation placement and R values
GABY TCHILINGUIRIAN
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GABY TCHILINGUIRIAN R.A.309/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LAW OFFICE OF REBECCA WENNER303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIGLIORE RESTORATION INCGeneral Contractor207/08/2026
JOSEPH CRUPI CONSTRUCT INGeneral Contractor107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GABY TCHILINGUIRIAN R.A.2540309/06/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOSEPH CRUPI CONSTRUCT IN07/18/2023
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC08/13/2022
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/12/2022
DOB NOWGeneral ConstructionSigned-offMIGLIORE RESTORATION INC08/19/2021
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/06/2022Fire-Resistant Penetrations and JointsGABY TCHILINGUIRIANspecial
09/06/2022Fire-Resistant Penetrations and JointsGABY TCHILINGUIRIANspecial
06/23/2021Fire-Resistant Penetrations and JointsGABY TCHILINGUIRIANspecial
06/23/2021Structural Stability – Alterations of existing buildingsGABY TCHILINGUIRIANspecial
06/23/2021FinalGABY TCHILINGUIRIANprogress
06/23/2021Energy Code Compliance InspectionsGABY TCHILINGUIRIANprogress
06/23/2021Fire-Resistance Rated ConstructionGABY TCHILINGUIRIANprogress
06/23/2021Fenestration and door U-factor and product ratingsGABY TCHILINGUIRIANenergy_progress
06/23/2021Interior lighting powerGABY TCHILINGUIRIANenergy_progress
06/23/2021Insulation placement and R valuesGABY TCHILINGUIRIANenergy_progress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00673068-P1Request digital key ↗
08/26/2026Q00673068-I1Request digital key ↗
08/15/2026Q00545975-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00545975-I1Open ↗
09/01/2026Q00545975-I1Open ↗
09/01/2026Q00545975-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00545975-I1Open ↗
09/01/2026Q00545975-I1Open ↗
09/01/2026Q00673068-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00673068-P1Open ↗
08/26/2026Q00673068-I1Open ↗
08/13/2026Q00545975-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00673068-P1Open ↗
08/26/2026Q00673068-I1Open ↗
08/13/2026Q00545975-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00545975-I1Open ↗