← Back
One family attached or semi-detached
86-40 89 STREET
QUEENS · BIN 4181874
💬 Discuss this project
1901Year Built
2Stories
A5Building Class
R3-1Zoning
1,156 sfGross Floor Area
1Units
3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
One family attached or semi-detached · 1,664 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction6p · 1 filing · 17 docs
CellarUnder Construction12p · 2 filings · 20 docs
Basement1p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PINTO ENGINEERING CONSULTANT, DPC303/23/2026
WITHDRAWN107/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINTO STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CL DESIGN AND BUILD CORPGeneral Contractor207/25/2026
HT PLUMBING & HEATING CORPlumbing107/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PINTO ENGINEERING CONSULT9110103/20/2026
Building Lifecycle
All (69)Filed (4)Permit Issued (3)Violation (10)Objection (35)Special Inspection (17)
07/23/2026
Permit issued — General Construction
Q01367841-I1-GC-CX
07/10/2026
Permit issued — Plumbing
Q01367841-S1-PL
07/06/2026
Permit issued — General Construction
Q01367841-I1-GC-CX
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
04/29/2026
Objection raised — Other
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection raised — Other
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection raised — Other
04/29/2026
Objection raised — Other
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection raised — Other
04/29/2026
Objection resolved — Addressed
04/28/2026
Objection resolved — Addressed
04/21/2026
Objection raised — Other
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/14/2026
Objection raised — Admin
04/14/2026
Objection raised — Admin
03/23/2026
Filed — Alteration
Horizontal rear extension on first floor, Selective removals at cellar, New rear steps, Interior renovation at rear first floor as per plans. Filed to resolve violations 34994193K, and 39136632Y.
Q01367841-S1
03/20/2026
Filed — Alteration
Horizontal rear extension on first floor, Selective removals at cellar, New rear steps, Interior renovation at rear first floor as per plans. Filed to resolve violations 34994193K, and 39136632Y.
Q01367841-I1
03/05/2026
Objection raised — Scope
03/05/2026
Objection resolved — Addressed
03/05/2026
Special inspection requirement — Lighting in dwelling units
Rene Navarrete
03/05/2026
Special inspection requirement — Lighting controls
Rene Navarrete
03/05/2026
Special inspection requirement — Interior lighting power
Rene Navarrete
03/05/2026
Special inspection requirement — Concrete - Cast-In-Place
Rene Navarrete
03/05/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Rene Navarrete
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rene Navarrete
03/05/2026
Special inspection requirement — Masonry
Rene Navarrete
03/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rene Navarrete
03/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
Rene Navarrete
03/05/2026
Special inspection requirement — Final
Rene Navarrete
03/05/2026
Special inspection requirement — Footing and Foundation
Rene Navarrete
03/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Rene Navarrete
03/05/2026
Special inspection requirement — Fenestration air leakage
Rene Navarrete
03/05/2026
Special inspection requirement — Fenestration areas
Rene Navarrete
03/05/2026
Special inspection requirement — Air barrier - visual inspection
Rene Navarrete
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/07/2025
Objection raised — Cost
08/07/2025
Objection raised — Plumbing
08/07/2025
Objection raised — Plumbing
08/07/2025
Objection raised — Plumbing
08/07/2025
Objection raised — Zoning
08/07/2025
Objection raised — Mechanical
07/27/2025
Filed — Alteration
Plumbing work filed to legalized kitchen and bathroom (enlargement) on first floor; Removals at cellar, legalization of three pieces bathroom in order to resolved WWP and Violations.
Q01210055-S1
07/27/2025
Filed — Alteration
Plumbing work filed to legalized kitchen and bathroom (enlargement) on first floor; Removals at cellar, legalization of three pieces bathroom in order to resolved WWP and Violations.
Q01210055-I1
07/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCL DESIGN AND BUILD CORP07/23/2026
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR07/10/2026
DOB NOWGeneral ConstructionPermit IssuedCL DESIGN AND BUILD CORP07/06/2026
2 projects · most recent 03/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/23/2026Permit IssuedHT PLUMBING & HEATING CORGas, Water/Sanitary
07/27/2025——Gas, Water/Sanitary
1 project · most recent 04/14/2026
General Wiring
FiledStatusContractorScope
04/14/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 03/23/2026
FiledStatusContractorScope
03/23/2026Permit IssuedCL DESIGN AND BUILD CORP3 scope_items
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/05/2026Lighting in dwelling unitsRene Navarreteenergy_progress
03/05/2026Lighting controlsRene Navarreteenergy_progress
03/05/2026Interior lighting powerRene Navarreteenergy_progress
03/05/2026Concrete - Cast-In-PlaceRene Navarretespecial
03/05/2026Excavations - Sheeting, Shoring, and BracingRene Navarretespecial
03/05/2026Fire-Resistant Penetrations and JointsRene Navarretespecial
03/05/2026MasonryRene Navarretespecial
03/05/2026Structural Stability – Alterations of existing buildingsRene Navarretespecial
03/05/2026Tenant Protection Plan ComplianceRene Navarretespecial
03/05/2026FinalRene Navarreteprogress
03/05/2026Footing and FoundationRene Navarreteprogress
03/05/2026Fenestration and door U-factor and product ratingsRene Navarreteenergy_progress
03/05/2026Fenestration air leakageRene Navarreteenergy_progress
03/05/2026Fenestration areasRene Navarreteenergy_progress
03/05/2026Air barrier - visual inspectionRene Navarreteenergy_progress
07/27/2025Tenant Protection Plan Compliance—special
07/27/2025Fire-Resistant Penetrations and Joints—special
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026Q01210055-I1Request digital key ↗
08/19/2026Q01210055-S1Request digital key ↗
08/17/2026Q01367841-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 15
08/17/2026Q01367841-S1Open ↗
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01367841-S1Open ↗
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01367841-I1Open ↗
08/25/2026Q01367841-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01367841-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026Q01367841-S1Open ↗
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-S1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-I1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026Q01367841-I1Open ↗
08/13/2026Q01210055-I1Open ↗