← Back
One family attached or semi-detached
88-30 89 STREET
QUEENS · BIN 4184042
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R3-1Zoning
1,152 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,313 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 4 docs
Basement1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC108/13/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341108/13/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
11/15/2024
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01094945-I1
08/19/2024
Permit issued — Solar
Q01094945-I1-SL
08/13/2024
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
Q01094945-I1
08/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
08/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
08/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
08/12/2024
Special inspection requirement — Final
Michelle Contri
08/12/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
01/13/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES08/19/2024
1 project · most recent 08/07/2024
FiledStatusContractorScope
08/07/2024CompleteSOURCE ELECTRIC INC2 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/12/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
08/12/2024Structural Stability – Alterations of existing buildingsMichelle Contrispecial
08/12/2024Energy Code Compliance InspectionsMichelle Contriprogress
08/12/2024FinalMichelle Contriprogress
08/12/2024Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01094945-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01094945-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01094945-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01094945-I1Open ↗